GRAHAM

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 251226District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.8 M
Oct 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
236
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-10-15174316
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,373 bbl$335,352
GasProduction576,179 Mcf$3,511,720
Total$3,847,072

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7037, -100.4039. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.70367, -100.40395 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,121 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,121 ft.

Completions filed
Oct 2006
1 of 1 wells

1 well

42-211335464602P13,121 ftOct 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 202327085.443.09$2,307
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 2015171038.792.17$6,633
Oct 201501,38043.552.43$3,349
Sep 201501,87642.992.76$5,175
Aug 201501,95340.162.87$5,610
Jul 201501,97048.152.95$5,802
Jun 201501,90656.152.88$5,495
May 2015142,31255.212.96$7,606
Apr 201501,91649.822.71$5,186
Mar 201502,39642.892.93$7,032
Feb 201502,20944.662.98$6,574
Jan 20151952,03743.433.10$14,785
Dec 201402,13154.693.59$7,653
Nov 201401,98670.464.25$8,444
Oct 201401,98678.303.90$7,747
Sep 201401,88486.164.05$7,622
Aug 201402,11989.394.04$8,550
Jul 201402,03696.564.18$8,510
Jun 201402,00698.164.74$9,502
May 201402,10494.734.73$9,945
Apr 201402,01795.944.81$9,700
Mar 201402,07295.895.06$10,478
Feb 201401,69397.406.19$10,483
Jan 201401,91390.404.86$9,299
Dec 20132051,75391.824.35$26,457
Nov 201301,91988.853.74$7,174
Oct 201302,12997.423.78$8,046
Sep 201302,118104.113.72$7,874
Aug 201362,297104.253.52$8,717
Jul 201362,346102.523.72$9,337
Jun 201302,28094.403.93$8,968
May 20132122,44094.834.15$30,228
Apr 2013162,52993.964.28$12,334
Mar 201392,56293.623.91$10,867
Feb 201332,38791.233.42$8,437
Jan 2013242,54991.603.42$10,916
Dec 201202,78386.773.42$9,518
Nov 201202,69286.953.62$9,758
Oct 201205,65989.383.40$19,239
Sep 201202,69894.672.92$7,874
Aug 201202,86292.662.91$8,323
Jul 201202,85985.133.02$8,636
Jun 201202,72479.822.52$6,862
May 201202,85691.612.49$7,107
Apr 20121682,739101.652.00$22,546
Mar 201201,910105.052.22$4,244
Feb 201202,628101.102.57$6,755
Jan 201207,37398.092.73$20,158
Dec 201102,95496.873.24$9,570
Nov 201102,88095.723.31$9,536
Oct 20111343,22084.983.65$23,136
Sep 201103,09083.623.99$12,316
Aug 201103,66283.404.15$15,195
Jul 2011423,60494.144.52$20,234
Jun 2011071392.904.64$3,308
May 201103,86998.134.40$17,042
Apr 201103,704105.964.33$16,050
Mar 20111323,83596.364.06$28,279
Feb 201103,50085.644.18$14,630
Jan 201102,90086.504.59$13,307
Dec 201003,86085.734.35$16,782
Nov 201003,66280.843.80$13,899
Oct 20101723,87178.103.51$27,016
Sep 201003,78472.633.98$15,058
Aug 201003,95473.684.42$17,474
Jul 201004,21572.554.74$19,964
Jun 201003,70770.364.91$18,203
May 201003,95971.124.24$16,767
Apr 20101753,34481.694.12$28,082
Mar 201003,51478.394.39$15,422
Feb 201003,79973.585.44$20,676
Jan 201004,18674.365.96$24,966
Dec 200904,32771.445.48$23,728
Nov 200904,21574.593.75$15,813
Oct 20091674,30672.544.11$29,813
Sep 200904,44265.543.06$13,614
Aug 200904,74267.423.22$15,262
Jul 200904,51461.133.46$15,639
Jun 200904,42566.163.90$17,235
May 20091904,94454.743.93$29,810
Apr 200904,81446.773.59$17,270
Mar 200905,06942.144.06$20,575
Feb 200904,58132.814.63$21,224
Jan 20090035.865.37$0
Dec 200806,21637.105.98$37,154
Nov 200806,62255.496.86$45,429
Oct 20081806,87575.246.92$61,132
Sep 200806,808101.767.88$53,627
Aug 200807,326114.228.48$62,147
Jul 20081807,566131.0811.39$109,767
Jun 200807,371131.3313.03$96,064
May 20081857,921123.1711.57$114,466
Apr 200808,099110.3110.45$84,674
Mar 200808,766101.909.66$84,715
Feb 200808,41592.538.77$73,804
Jan 20081779,45890.388.21$93,607
Dec 20071839,89188.337.30$88,388
Nov 200709,83391.677.29$71,699
Oct 2007010,72282.856.92$74,217
Sep 200715511,06075.846.24$80,816
Aug 2007012,23369.066.39$78,144
Jul 200717813,06270.906.39$96,059
Jun 200717612,91162.007.55$108,370
May 200718014,21058.747.85$122,069
Apr 2007015,72759.617.81$122,752
Mar 2007016,38856.927.30$119,665
Feb 200718017,88855.108.22$156,886
Jan 200718025,97650.306.73$183,791
Dec 200635120756.656.92$21,316
Nov 2006054,73954.207.62$416,973
Oct 2006014,73054.906.01$88,583

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2023 — as filed, then multipliedworked
Condensate            27 bbl  × $ 85.44 =     $2,307
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                   $2,307

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/251226 is the state's own key, not one this site invented.