FINSTERWALD DOBBS

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234091District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.5 M
Nov 2007 – May 2026
Value, last 12 filed months
$314
at the published price for each month
Months reported
223
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-13182994
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,579 bbl$558,776
GasProduction338,285 Mcf$1,932,267
Total$2,491,042

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6105, -100.3243. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.61050, -100.32428 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,700 ft.

Completions filed
May 2013
1 of 1 wells

1 well

42-4833244925113,700 ftMay 2013

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (223)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

223 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20255062.743.08$314
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 202301989.042.74$52
Aug 202303080.522.67$80
Jul 202303174.852.64$82
Jun 202303268.962.26$72
May 202302570.622.23$56
Apr 202398878.122.24$7,674
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 2020012916.921.81$234
Apr 202001,63414.751.80$2,948
Mar 2020033330.341.86$618
Feb 2020017549.881.98$347
Jan 2020015757.252.09$329
Dec 2019019059.012.30$438
Nov 2019021855.302.75$600
Oct 2019016753.472.42$404
Sep 2019060755.052.66$1,613
Aug 2019034953.112.30$804
Jul 2019053456.272.46$1,314
Jun 2019060552.782.49$1,507
May 2019011858.482.74$323
Apr 2019040662.632.75$1,117
Mar 2019154256.803.06$1,716
Feb 2019037250.852.79$1,039
Jan 2019427746.033.23$1,078
Dec 20181961446.594.19$9,190
Nov 201823152.934.24$237
Oct 2018524061.443.40$1,123
Sep 201801,15759.543.11$3,596
Aug 201851,45159.403.07$4,747
Jul 201801,21365.142.93$3,556
Jun 20181173260.183.08$2,914
May 2018033065.382.90$957
Apr 2018084263.842.90$2,442
Mar 20181311,95761.222.79$13,474
Feb 2018052861.782.77$1,461
Jan 2018984562.874.01$3,954
Dec 201781,30157.272.92$4,259
Nov 2017121,80055.423.12$6,278
Oct 2017151,59349.292.98$5,492
Sep 2017151,81147.523.09$6,304
Aug 201781,35945.373.00$4,446
Jul 201761,20143.873.09$3,971
Jun 201731,27642.493.09$4,067
May 201721,21645.373.26$4,059
Apr 2017090047.933.21$2,890
Mar 201701,05746.772.98$3,154
Feb 201741,77650.452.95$5,446
Jan 201781,00549.413.42$3,831
Dec 2016719048.763.72$1,049
Nov 201691,25842.492.64$3,709
Oct 2016131,26446.193.09$4,507
Sep 201691,23941.553.10$4,216
Aug 2016131,32941.442.92$4,425
Jul 201671,07241.622.92$3,426
Jun 201661,22345.352.69$3,557
May 2016101,89142.521.99$4,190
Apr 2016101,89036.561.99$4,129
Mar 2016111,90533.011.79$3,781
Feb 2016942,29026.472.06$7,214
Jan 201661,97027.352.36$4,822
Dec 201562,15832.362.00$4,513
Nov 201571,33038.792.17$3,154
Oct 2015111,17743.552.43$3,335
Sep 201571,47042.992.76$4,356
Aug 201501,19040.162.87$3,418
Jul 201571,56648.152.95$4,949
Jun 201561,54856.152.88$4,800
May 201501,56555.212.96$4,625
Apr 201581,71449.822.71$5,038
Mar 2015141,62142.892.93$5,358
Feb 2015162,25144.662.98$7,414
Jan 2015202,04843.433.10$7,219
Dec 2014131,90954.693.59$7,567
Nov 2014122,37170.464.25$10,927
Oct 2014122,25178.303.90$9,721
Sep 2014122,56386.164.05$11,402
Aug 2014202,75689.394.04$12,909
Jul 2014212,79896.564.18$13,722
Jun 2014263,18198.164.74$17,620
May 2014452,54394.734.73$16,282
Apr 2014362,28995.944.81$14,462
Mar 2014602,48395.895.06$18,309
Feb 201403,09097.406.19$19,133
Jan 201402,85090.404.86$13,853
Dec 201302,73291.824.35$11,896
Nov 201304,68488.853.74$17,510
Oct 201303,61297.423.78$13,651
Sep 201303,436104.113.72$12,774
Aug 201303,058104.253.52$10,772
Jul 201302,702102.523.72$10,045
Jun 2013571,36394.403.93$10,742
May 2013611,36994.834.15$11,465
Apr 2013029193.964.28$1,246
Mar 2013113393.623.91$614
Feb 2013320891.233.42$985
Jan 2013440891.603.42$1,762
Dec 201205486.773.42$185
Nov 2012111586.953.62$504
Oct 201202089.383.40$68
Sep 201219094.672.92$1,799
Aug 201207692.662.91$221
Jul 201202785.133.02$82
Jun 201204479.822.52$111
May 201201791.612.49$42
Apr 2012074101.652.00$148
Mar 2012187105.052.22$298
Feb 2012062101.102.57$159
Jan 201205598.092.73$150
Dec 2011051396.873.24$1,662
Nov 2011741,10295.723.31$10,732
Oct 2011151,57284.983.65$7,010
Sep 201191,51383.623.99$6,783
Aug 201171,44883.404.15$6,592
Jul 2011111,58994.144.52$8,213
Jun 201101,60792.904.64$7,456
May 2011551,29298.134.40$11,088
Apr 20110945105.964.33$4,095
Mar 2011831,31096.364.06$13,313
Feb 2011131,77085.644.18$8,512
Jan 2011162,01086.504.59$10,607
Dec 2010152,04285.734.35$10,164
Nov 2010191,94780.843.80$8,925
Oct 2010132,11378.103.51$8,430
Sep 2010162,06072.633.98$9,360
Aug 2010102,09573.684.42$9,995
Jul 2010132,14472.554.74$11,098
Jun 2010222,22270.364.91$12,459
May 20101022,28171.124.24$16,915
Apr 2010462,20181.694.12$12,832
Mar 2010271,97878.394.39$10,797
Feb 2010442,13373.585.44$14,846
Jan 2010312,57374.365.96$17,651
Dec 20091222,61671.445.48$23,061
Nov 2009412,60874.593.75$12,842
Oct 2009452,86372.544.11$15,032
Sep 2009532,81265.543.06$12,092
Aug 200902,99267.423.22$9,630
Jul 2009673,06861.133.46$14,725
Jun 2009592,79066.163.90$14,770
May 2009813,03954.743.93$16,364
Apr 2009542,84946.773.59$12,746
Mar 2009573,63342.144.06$17,148
Feb 20091423,78932.814.63$22,213
Jan 2009333,16535.865.37$18,183
Dec 2008443,30437.105.98$21,381
Nov 20081653,58255.496.86$33,730
Oct 2008675,01275.246.92$39,734
Sep 2008584,993101.767.88$45,232
Aug 20082105,765114.228.48$72,891
Jul 20082896,930131.0811.39$116,811
Jun 2008686,742131.3313.03$96,796
May 20082508,242123.1711.57$126,188
Apr 20082439,044110.3110.45$121,359
Mar 200841610,844101.909.66$147,188
Feb 200850111,97792.538.77$151,403
Jan 200853818,49490.388.21$200,381
Dec 200795739,06788.337.30$369,798
Nov 200712914291.677.29$12,861

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2025 — as filed, then multipliedworked
Condensate             5 bbl  × $ 62.74 =       $314
Gas                    0 Mcf  × $  3.08 =         $0

────────────────────────────────────────────────────
Month total                                     $314

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234091 is the state's own key, not one this site invented.