PEAK BOURASSA

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234771District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.6 M
Dec 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
222
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-26183206
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,733 bbl$317,644
GasProduction378,340 Mcf$2,326,053
Total$2,643,697

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7029, -100.2809. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.70286, -100.28088 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,970 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,970 ft.

Completions filed
May 2012
1 of 1 wells

1 well

42-2113400290612,970 ftMay 2012

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (222)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

222 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170345.373.26$10
Apr 20170047.933.21$0
Mar 20170746.772.98$21
Feb 20170550.452.95$15
Jan 20170349.413.42$10
Dec 20160648.763.72$22
Nov 201601142.492.64$29
Oct 20160046.193.09$0
Sep 20160741.553.10$22
Aug 20160841.442.92$23
Jul 20160841.622.92$23
Jun 201601645.352.69$43
May 201601642.521.99$32
Apr 201601936.561.99$38
Mar 201601933.011.79$34
Feb 20161512626.472.06$4,051
Jan 201602527.352.36$59
Dec 201503132.362.00$62
Nov 201503338.792.17$72
Oct 201502743.552.43$66
Sep 201502442.992.76$66
Aug 201502640.162.87$75
Jul 201502648.152.95$77
Jun 201502956.152.88$84
May 201504255.212.96$124
Apr 20151975249.822.71$9,955
Mar 201505642.892.93$164
Feb 201505444.662.98$161
Jan 201506043.433.10$186
Dec 20142018754.693.59$11,305
Nov 201407370.464.25$310
Oct 201408678.303.90$335
Sep 201409286.164.05$372
Aug 2014010089.394.04$404
Jul 2014011896.564.18$493
Jun 2014011998.164.74$564
May 201401294.734.73$57
Apr 201401095.944.81$48
Mar 20140795.895.06$35
Feb 2014050597.406.19$3,127
Jan 201401,75390.404.86$8,521
Dec 2013468991.824.35$3,368
Nov 201372,47588.853.74$9,874
Oct 201303,17697.423.78$12,003
Sep 201353,180104.113.72$12,343
Aug 2013403,229104.253.52$15,545
Jul 20131902,141102.523.72$27,438
Jun 201353,12994.403.93$12,780
May 201373,42294.834.15$14,862
Apr 201312,78493.964.28$12,017
Mar 201321,81793.623.91$7,297
Feb 20131862,44091.233.42$25,313
Jan 201332,64491.603.42$9,317
Dec 201232,97786.773.42$10,442
Nov 201212,95186.953.62$10,784
Oct 201243,34689.383.40$11,733
Sep 2012127494.672.92$12,035
Aug 201272,98892.662.91$9,338
Jul 2012346785.133.02$1,666
Jun 201217376479.822.52$15,733
May 20121118,79791.612.49$47,781
Apr 201244,239101.652.00$8,871
Mar 2012165,295105.052.22$13,447
Feb 201275,089101.102.57$13,788
Jan 20121255,96698.092.73$28,573
Dec 201105,90396.873.24$19,124
Nov 2011175,62195.723.31$20,240
Oct 201196,06784.983.65$22,901
Sep 2011626,25083.623.99$30,096
Aug 2011215,46983.404.15$24,444
Jul 2011246,16894.144.52$30,122
Jun 2011346,28492.904.64$32,316
May 201126,00198.134.40$26,630
Apr 2011425,987105.964.33$30,394
Mar 2011426,03696.364.06$28,537
Feb 2011243,60685.644.18$17,128
Jan 2011463,37086.504.59$19,443
Dec 2010232,68585.734.35$13,646
Nov 2010112,14080.843.80$9,011
Oct 2010192,03278.103.51$8,614
Sep 2010121,94972.633.98$8,628
Aug 2010131,89873.684.42$9,346
Jul 201081,66372.554.74$8,457
Jun 2010321,51870.364.91$9,706
May 2010251,36371.124.24$7,551
Apr 2010201,13381.694.12$6,305
Mar 2010181,10578.394.39$6,261
Feb 20101795073.585.44$6,421
Jan 2010674974.365.96$4,913
Dec 20095276071.445.48$7,883
Nov 2009869474.593.75$3,200
Oct 2009034572.544.11$1,418
Sep 2009037565.543.06$1,149
Aug 2009010467.423.22$335
Jul 2009017161.133.46$592
Jun 20095166.163.90$335
May 2009161854.743.93$947
Apr 200943,11046.773.59$11,344
Mar 20091117,48642.144.06$35,063
Feb 2009147,00432.814.63$32,909
Jan 2009106,69435.865.37$36,312
Dec 200855,42537.105.98$32,611
Nov 200875,50355.496.86$38,141
Oct 2008986,20875.246.92$50,345
Sep 200867,194101.767.88$57,278
Aug 20081317,614114.228.48$79,553
Jul 2008159,379131.0811.39$108,788
Jun 20081449,772131.3313.03$146,266
May 20082512,166123.1711.57$143,892
Apr 200813512,762110.3110.45$148,317
Mar 200815615,039101.909.66$161,234
Feb 200833617,15492.538.77$181,541
Jan 200818929,76390.388.21$261,309
Dec 200725940,04288.337.30$315,263

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 45.37 =         $0
Gas                    3 Mcf  × $  3.26 =        $10

────────────────────────────────────────────────────
Month total                                      $10

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/234771 is the state's own key, not one this site invented.