BYRUM 6

Operated by BCE-MACH III LLC (P-5 40209) in the RED DEER CREEK (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235279District 10Field 752003002 tax incentive programmesCondensateGasSaveExport
Value, all time
$877 k
Sep 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 157 wells, and the rule below applies to all of them.

Discovered
1978-03-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-09-09.

The Commission's schedule remark for this field reads: AND PLAT AS LONG AS THE ALLOCATION IS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-30183794
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,092 bbl$175,000
GasProduction118,031 Mcf$702,424
Total$877,424

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.7553, -100.6281. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.75532, -100.62814 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,025 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,025 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-393319881211,025 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 201505638.792.17$121
Oct 20150043.552.43$0
Sep 20150942.992.76$25
Aug 201501040.162.87$29
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150649.822.71$16
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 2014022878.303.90$889
Sep 2014031786.164.05$1,282
Aug 2014032089.394.04$1,291
Jul 2014030996.564.18$1,292
Jun 2014028598.164.74$1,350
May 2014036094.734.73$1,702
Apr 2014030895.944.81$1,481
Mar 2014030695.895.06$1,547
Feb 2014025597.406.19$1,579
Jan 2014030990.404.86$1,502
Dec 2013031291.824.35$1,359
Nov 2013034188.853.74$1,275
Oct 2013037997.423.78$1,432
Sep 20130376104.113.72$1,398
Aug 20130398104.253.52$1,402
Jul 20130399102.523.72$1,483
Jun 2013041594.403.93$1,632
May 2013042694.834.15$1,768
Apr 2013043393.964.28$1,854
Mar 2013044893.623.91$1,753
Feb 2013040391.233.42$1,378
Jan 2013045391.603.42$1,549
Dec 2012044286.773.42$1,512
Nov 2012043186.953.62$1,562
Oct 2012043489.383.40$1,475
Sep 2012040894.672.92$1,191
Aug 2012043292.662.91$1,256
Jul 2012044685.133.02$1,347
Jun 2012045279.822.52$1,139
May 2012046491.612.49$1,155
Apr 20120489101.652.00$976
Mar 20120518105.052.22$1,151
Feb 20120467101.102.57$1,200
Jan 2012053198.092.73$1,452
Dec 2011054296.873.24$1,756
Nov 2011051095.723.31$1,689
Oct 2011056484.983.65$2,058
Sep 2011057583.623.99$2,292
Aug 2011062283.404.15$2,581
Jul 2011061894.144.52$2,792
Jun 2011062192.904.64$2,881
May 2011067298.134.40$2,960
Apr 20110683105.964.33$2,960
Mar 2011073996.364.06$2,998
Feb 2011068585.644.18$2,863
Jan 2011068486.504.59$3,139
Dec 2010075785.734.35$3,291
Nov 2010079080.843.80$2,998
Oct 2010079878.103.51$2,800
Sep 2010074272.633.98$2,953
Aug 2010085273.684.42$3,765
Jul 201002,16472.554.74$10,250
Jun 201001,99870.364.91$9,811
May 201001,07171.124.24$4,536
Apr 2010093781.694.12$3,863
Mar 2010421,01478.394.39$7,742
Feb 2010098873.585.44$5,377
Jan 201001,08474.365.96$6,465
Dec 200901,14671.445.48$6,284
Nov 200901,20674.593.75$4,524
Oct 200901,26872.544.11$5,212
Sep 200901,39165.543.06$4,263
Aug 200901,54667.423.22$4,976
Jul 200901,69761.133.46$5,879
Jun 20091891,79966.163.90$19,511
May 200903,11854.743.93$12,240
Apr 200904,03746.773.59$14,483
Mar 200904,06142.144.06$16,484
Feb 20091913,55532.814.63$22,737
Jan 200904,40735.865.37$23,670
Dec 200804,60437.105.98$27,519
Nov 20081804,30855.496.86$39,543
Oct 200802,74175.246.92$18,973
Sep 200802,768101.767.88$21,804
Aug 20081822,591114.228.48$42,768
Jul 200803,127131.0811.39$35,615
Jun 20081773,214131.3313.03$65,132
May 200802,074123.1711.57$24,005
Apr 200801,658110.3110.45$17,334
Mar 20081822,269101.909.66$40,474
Feb 200801,80492.538.77$15,822
Jan 20081892,65890.388.21$38,893
Dec 200702,89988.337.30$21,168
Nov 20071894,28791.677.29$48,585
Oct 20073797,83682.856.92$85,641
Sep 20071925,87775.846.24$51,258

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2015 — as filed, then multipliedworked
Condensate             0 bbl  × $ 38.79 =         $0
Gas                   56 Mcf  × $  2.17 =       $121

────────────────────────────────────────────────────
Month total                                     $121

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/235279 is the state's own key, not one this site invented.