SMITH

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236975District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.3 M
Apr 2008 – May 2026
Value, last 12 filed months
$335
at the published price for each month
Months reported
218
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-08-18183493
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,773 bbl$1,136,335
GasProduction518,549 Mcf$3,182,531
Total$4,318,866

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6296, -100.2886. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62958, -100.28863 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,737 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,737 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-21134121503813,737 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (218)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

218 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 202606963.503.75$259
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 202502359.383.30$76
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 202251084.888.16$4,329
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 202172050.412.81$3,630
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202007339.982.39$174
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190955.052.66$24
Aug 20190053.112.30$0
Jul 20190756.272.46$17
Jun 20190052.782.49$0
May 20190558.482.74$14
Apr 2019131462.632.75$853
Mar 201973156.803.06$493
Feb 201912095950.852.79$8,780
Jan 20192887046.033.23$4,097
Dec 2018261,15546.594.19$6,046
Nov 20181351,31752.934.24$12,726
Oct 2018391,73361.443.40$8,285
Sep 2018942,07659.543.11$12,049
Aug 2018251,69959.403.07$6,695
Jul 201801,66265.142.93$4,873
Jun 2018781,65860.183.08$9,796
May 20181651,18565.382.90$14,225
Apr 201801,36263.842.90$3,951
Mar 20182061,90861.222.79$17,929
Feb 2018831,47861.782.77$9,216
Jan 201816166762.874.01$12,796
Dec 2017461,75257.272.92$7,753
Nov 20171461,71155.423.12$13,427
Oct 2017471,46749.292.98$6,694
Sep 20171521,89647.523.09$13,077
Aug 2017552,35045.373.00$9,556
Jul 2017702,42143.873.09$10,545
Jun 20171551,69942.493.09$11,831
May 20171501,56045.373.26$11,896
Apr 2017471,65747.933.21$7,574
Mar 20175958446.772.98$4,502
Feb 2017661,44350.452.95$7,590
Jan 20171701,79949.413.42$14,550
Dec 20166088948.763.72$6,235
Nov 20164863742.492.64$3,724
Oct 20161671,16746.193.09$11,320
Sep 20161491,26641.553.10$10,116
Aug 2016661,37841.442.92$6,765
Jul 2016792,02541.622.92$9,210
Jun 20161591,72045.352.69$11,830
May 2016631,37642.521.99$5,418
Apr 201614388936.561.99$6,998
Mar 2016831,23633.011.79$4,957
Feb 2016732,02126.472.06$6,103
Jan 20161581,02827.352.36$6,752
Dec 20151581,24932.362.00$7,613
Nov 2015121,74638.792.17$4,250
Oct 2015132,64443.552.43$6,982
Sep 20151123,02542.992.76$13,159
Aug 2015943,34240.162.87$13,375
Jul 20151894,15948.152.95$21,349
Jun 20151061,16156.152.88$9,299
May 201501,39855.212.96$4,132
Apr 201521,52149.822.71$4,216
Mar 201511,67342.892.93$4,953
Feb 201541,63144.662.98$5,033
Jan 20151071,79843.433.10$10,222
Dec 201411,74854.693.59$6,332
Nov 201441,81870.464.25$8,012
Oct 201471,85878.303.90$7,796
Sep 20141021,91786.164.05$16,543
Aug 201432,19889.394.04$9,137
Jul 201482,39196.564.18$10,766
Jun 2014112,30498.164.74$11,994
May 20141122,52994.734.73$22,563
Apr 2014172,25795.944.81$12,485
Mar 2014432,31495.895.06$15,825
Feb 2014972,00897.406.19$21,881
Jan 201402,59790.404.86$12,623
Dec 2013882,13691.824.35$17,381
Nov 201302,29788.853.74$8,587
Oct 201302,33297.423.78$8,813
Sep 2013762,384104.113.72$16,775
Aug 201302,400104.253.52$8,454
Jul 201302,299102.523.72$8,547
Jun 201311,78594.403.93$7,116
May 2013972,29994.834.15$18,737
Apr 2013192,39693.964.28$12,046
Mar 20131202,85493.623.91$22,402
Feb 2013452,00691.233.42$10,966
Jan 20131132,55091.603.42$19,072
Dec 2012272,73386.773.42$11,690
Nov 20121062,65986.953.62$18,855
Oct 20121042,77689.383.40$18,733
Sep 201203694.672.92$105
Aug 2012862,76192.662.91$15,998
Jul 201293,12685.133.02$10,209
Jun 2012963,05979.822.52$15,368
May 2012113,04591.612.49$8,585
Apr 2012892,345101.652.00$13,729
Mar 201271,899105.052.22$4,955
Feb 20121032,510101.102.57$16,865
Jan 201202,87998.092.73$7,871
Dec 2011913,01496.873.24$18,580
Nov 2011943,01795.723.31$18,988
Oct 2011153,16384.983.65$12,815
Sep 2011963,34383.623.99$21,352
Aug 20111023,61083.404.15$23,486
Jul 2011183,58094.144.52$17,866
Jun 2011193,70792.904.64$18,965
May 2011883,95598.134.40$26,057
Apr 20111243,924105.964.33$30,143
Mar 2011884,09096.364.06$25,074
Feb 2011413,67385.644.18$18,864
Jan 20112143,73686.504.59$35,655
Dec 2010993,49185.734.35$23,665
Nov 2010993,46880.843.80$21,165
Oct 2010913,78378.103.51$20,381
Sep 2010193,69472.633.98$16,080
Aug 20101663,62973.684.42$28,269
Jul 2010913,65572.554.74$23,914
Jun 2010993,89770.364.91$26,101
May 2010983,99671.124.24$23,894
Apr 20101144,03681.694.12$25,952
Mar 20101824,23478.394.39$32,849
Feb 2010833,85573.585.44$27,087
Jan 20101024,27774.365.96$33,093
Dec 20092114,85271.445.48$41,681
Nov 20091144,77474.593.75$26,413
Oct 20091185,21872.544.11$30,007
Sep 20091855,23165.543.06$28,157
Aug 2009695,54267.423.22$22,489
Jul 20091245,87161.133.46$27,920
Jun 20091856,12766.163.90$36,104
May 20092816,93154.743.93$42,591
Apr 20091866,81146.773.59$33,134
Mar 20092557,58642.144.06$41,537
Feb 20092667,04732.814.63$41,376
Jan 20092168,00135.865.37$50,719
Dec 20082109,22937.105.98$62,954
Nov 20082658,98455.496.86$76,338
Oct 200824811,48575.246.92$98,158
Sep 200841212,721101.767.88$142,130
Aug 200843015,330114.228.48$179,159
Jul 200857618,575131.0811.39$287,061
Jun 200868824,042131.3313.03$403,686
May 200897946,621123.1711.57$660,188
Apr 200840843,961110.3110.45$504,613

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 63.50 =         $0
Gas                   69 Mcf  × $  3.75 =       $259

────────────────────────────────────────────────────
Month total                                     $259

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/236975 is the state's own key, not one this site invented.