Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the BUFFALO WALLOW (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 249721District 10Field 131472852 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.7 M
Oct 2008 – May 2026
Value, last 12 filed months
$166 k
at the published price for each month
Months reported
212
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,387 leases and 1,388 wells, and the rule below applies to all of them.

Discovered
1974-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-03-29.

The Commission's schedule remark for this field reads: 01-30-2024

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-08-17188073
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,451 bbl$890,679
GasProduction657,615 Mcf$2,781,558
Total$3,672,237

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6328, -100.2847. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.63282, -100.28466 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,763 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,763 ft.

Completions filed
Oct 2008
1 of 1 wells

1 well

42-21134428303813,763 ftOct 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (212)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

212 months

May 202605,576106.413.05$16,984
Apr 202605,84398.932.87$16,768
Mar 202604,96789.753.15$15,643
Feb 2026805,29463.503.75$24,934
Jan 202605,45959.138.00$43,661
Dec 2025946,57156.664.41$34,326
Nov 2025047158.593.93$1,849
Oct 2025070659.383.30$2,333
Sep 2025082162.743.08$2,526
Aug 2025079463.933.01$2,394
Jul 2025076066.743.32$2,520
Jun 2025061566.483.13$1,924
May 2025083460.553.23$2,696
Apr 2025081262.363.54$2,877
Mar 2025082067.704.27$3,500
Feb 2025073970.884.34$3,208
Jan 2025078674.324.28$3,363
Dec 2024078968.993.12$2,463
Nov 2024073169.052.20$1,607
Oct 20248772871.372.28$7,870
Sep 20245061269.612.36$4,927
Aug 2024057275.632.06$1,180
Jul 2024061879.932.15$1,327
Jun 2024047878.082.63$1,259
May 2024045478.812.20$998
Apr 2024033384.451.66$553
Mar 202401380.301.55$20
Feb 20248953376.091.78$7,723
Jan 2024044873.023.30$1,477
Dec 2023052471.262.61$1,368
Nov 2023047077.892.81$1,320
Oct 2023053785.443.09$1,658
Sep 20237554189.042.74$8,158
Aug 2023054780.522.67$1,462
Jul 2023058774.852.64$1,551
Jun 2023055868.962.26$1,260
May 20236261670.622.23$5,751
Apr 202312157478.122.24$10,737
Mar 2023061172.852.39$1,462
Feb 2023058075.112.47$1,430
Jan 2023070376.533.39$2,382
Dec 2022072976.415.73$4,177
Nov 2022069485.005.65$3,918
Oct 2022067587.185.86$3,958
Sep 202213865784.888.16$17,077
Aug 2022071294.529.13$6,499
Jul 20220806101.587.54$6,079
Jun 20220964115.097.98$7,690
May 202201,119109.378.43$9,437
Apr 202201,046104.226.84$7,152
Mar 202201,128108.885.08$5,726
Feb 202201,03091.054.86$5,005
Jan 202201,13481.844.54$5,146
Dec 202101,14471.323.90$4,461
Nov 202101,07677.435.24$5,635
Oct 202101,03179.795.71$5,891
Sep 202101,09069.865.35$5,833
Aug 202101,25866.024.22$5,310
Jul 202101,38870.783.98$5,527
Jun 202101,35969.493.38$4,594
May 202101,49363.483.02$4,505
Apr 202101,41260.362.76$3,895
Mar 202101,50461.302.72$4,086
Feb 202101,34157.805.55$7,440
Jan 2021441,51550.412.81$6,476
Dec 202001,55344.642.68$4,155
Nov 202002,35238.772.71$6,366
Oct 2020014636.972.48$362
Sep 202001,22037.091.99$2,429
Aug 202001,50039.982.39$3,578
Jul 202001,55638.371.83$2,840
Jun 202001,57634.901.69$2,664
May 202001,73716.921.81$3,152
Apr 202001,73714.751.80$3,134
Mar 202001,64230.341.86$3,048
Feb 202001,56749.881.98$3,104
Jan 202001,72057.252.09$3,603
Dec 201901,72059.012.30$3,964
Nov 201901,67655.302.75$4,610
Oct 201901,95053.472.42$4,716
Sep 201901,81055.052.66$4,810
Aug 201901,95253.112.30$4,498
Jul 201902,00456.272.46$4,930
Jun 201902,16452.782.49$5,391
May 201901,54358.482.74$4,228
Apr 201992,14462.632.75$6,461
Mar 2019319256.803.06$758
Feb 20191071,70550.852.79$10,202
Jan 201961,28246.033.23$4,415
Dec 201861,40746.594.19$6,168
Nov 2018911,12752.934.24$9,592
Oct 201841,48861.443.40$5,302
Sep 20181021,55259.543.11$10,897
Aug 201821,56759.403.07$4,924
Jul 201801,48065.142.93$4,339
Jun 201871,23060.183.08$4,206
May 20181091,16165.382.90$10,494
Apr 201801,33763.842.90$3,878
Mar 20181241,40761.222.79$11,512
Feb 201861,19661.782.77$3,679
Jan 201810389762.874.01$10,072
Dec 201751,71557.272.92$5,297
Nov 20171101,24855.423.12$9,988
Oct 201761,73149.292.98$5,460
Sep 20171001,87347.523.09$10,534
Aug 2017142,01245.373.00$6,680
Jul 2017181,79543.873.09$6,331
Jun 20171051,95342.493.09$10,491
May 2017961,56545.373.26$9,463
Apr 201751,50347.933.21$5,067
Mar 2017121,72646.772.98$5,711
Feb 201791,45750.452.95$4,756
Jan 20171071,90749.413.42$11,807
Dec 20161190348.763.72$3,898
Nov 2016111,40042.492.64$4,169
Oct 20161021,50746.193.09$9,368
Sep 20161001,23741.553.10$7,990
Aug 201611,65041.442.92$4,867
Jul 201641,62441.622.92$4,916
Jun 20161011,52045.352.69$8,663
May 201631,29642.521.99$2,708
Apr 20161032,14736.561.99$8,040
Mar 201672,42833.011.79$4,587
Feb 201692,61226.472.06$5,628
Jan 20161083,19127.352.36$10,498
Dec 20151112,41532.362.00$8,425
Nov 201562,70238.792.17$6,089
Oct 201582,11743.552.43$5,485
Sep 20151102,33742.992.76$11,175
Aug 2015942,89840.162.87$12,100
Jul 20151131,53748.152.95$9,968
Jun 2015971,22256.152.88$8,969
May 201501,38355.212.96$4,087
Apr 201511,72749.822.71$4,724
Mar 201541,81142.892.93$5,486
Feb 201531,53344.662.98$4,696
Jan 20151061,83243.433.10$10,284
Dec 201421,94354.693.59$7,087
Nov 201492,01870.464.25$9,214
Oct 2014162,31378.303.90$10,276
Sep 20141072,24786.164.05$18,309
Aug 2014162,29489.394.04$10,687
Jul 201492,18096.564.18$9,981
Jun 201492,20898.164.74$11,342
May 20141132,31394.734.73$21,637
Apr 2014132,38095.944.81$12,693
Mar 2014162,39095.895.06$13,620
Feb 2014922,09697.406.19$21,939
Jan 201402,33090.404.86$11,325
Dec 20131052,51591.824.35$20,593
Nov 201302,67388.853.74$9,992
Oct 201302,78597.423.78$10,526
Sep 2013992,814104.113.72$20,769
Aug 201302,873104.253.52$10,120
Jul 201302,989102.523.72$11,112
Jun 201382,80994.403.93$11,804
May 2013952,85394.834.15$20,846
Apr 2013202,85693.964.28$14,110
Mar 20131353,04993.623.91$24,569
Feb 2013272,81691.233.42$12,094
Jan 20131203,16991.603.42$21,830
Dec 2012163,08486.773.42$11,936
Nov 20121153,05386.953.62$21,066
Oct 20121193,15989.383.40$21,376
Sep 201204294.672.92$123
Aug 2012983,39992.662.91$18,966
Jul 201293,53185.133.02$11,433
Jun 20121143,38879.822.52$17,634
May 201293,46691.612.49$9,449
Apr 20121023,120101.652.00$16,598
Mar 201272,279105.052.22$5,799
Feb 20121172,914101.102.57$19,318
Jan 201203,34298.092.73$9,137
Dec 20111043,44296.873.24$21,226
Nov 2011973,43695.723.31$20,662
Oct 2011123,59784.983.65$14,144
Sep 20111103,98983.623.99$25,098
Aug 20111124,26383.404.15$27,029
Jul 2011104,23994.144.52$20,090
Jun 2011134,32792.904.64$21,284
May 20111174,49498.134.40$31,276
Apr 20111234,355105.964.33$31,905
Mar 2011984,48496.364.06$27,636
Feb 2011223,96985.644.18$18,474
Jan 20112334,37786.504.59$40,240
Dec 20101204,36885.734.35$29,279
Nov 20101224,35280.843.80$26,380
Oct 20101194,89878.103.51$26,480
Sep 2010195,04272.633.98$21,444
Aug 20102355,08473.684.42$39,783
Jul 20101235,26472.554.74$33,857
Jun 20101275,20670.364.91$34,499
May 20101325,51271.124.24$32,732
Apr 20101505,49581.694.12$34,908
Mar 20102555,96678.394.39$46,172
Feb 20101205,33673.585.44$37,870
Jan 20101306,24974.365.96$46,936
Dec 20092786,62971.445.48$56,212
Nov 20091737,27174.593.75$40,181
Oct 20091727,86672.544.11$44,808
Sep 20092888,12665.543.06$43,780
Aug 20091169,08067.423.22$37,045
Jul 20092139,90361.133.46$47,330
Jun 200931210,35166.163.90$60,959
May 200946911,87454.743.93$72,287
Apr 200935213,11946.773.59$63,527
Mar 200949515,39442.144.06$83,344
Feb 200965417,05932.814.63$100,492
Jan 200973026,64835.865.37$169,304
Dec 20081,40646,63637.105.98$330,913
Nov 200898554,19755.496.86$426,469
Oct 2008694,88775.246.92$39,019

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                5,576 Mcf  × $  3.05 =    $16,984

────────────────────────────────────────────────────
Month total                                  $16,984

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/249721 is the state's own key, not one this site invented.