KIKER

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the ALLISON PARKS (GRANITE WASH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 241409District 10Field 018104102 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Jul 2008 – Mar 2025
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
201
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 79 leases and 79 wells, and the rule below applies to all of them.

Discovered
1982-03-04
as the register files it
Field class
Gas
the register's own label
Between wells
660 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-06-27.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-12-05185185
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,611 bbl$176,534
GasProduction354,895 Mcf$1,753,698
Total$1,930,231

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6275, -100.0817. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.62752, -100.08167 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
14,290 ft
1 wells filed one
Completion to plug
16.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,290 ft.

Completions filed
Jul 2008
1 of 1 wells
Plug dates filed
Mar 2025
1 of 1 wells

Last completion to plug: a median of 16.7 years across the 1 well that filed both dates, with the middle half between 16.7 years and 16.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2113417870614,290 ftJul 2008Mar 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (201)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

201 months

Mar 2025018267.704.27$777
Feb 2025521670.884.34$1,292
Jan 2025536474.324.28$1,929
Dec 2024522268.993.12$1,038
Nov 2024519169.052.20$765
Oct 2024521871.372.28$854
Sep 2024522169.612.36$871
Aug 2024524775.632.06$888
Jul 2024032779.932.15$702
Jun 20242551878.082.63$3,316
May 20240078.812.20$0
Apr 2024035884.451.66$594
Mar 2024074880.301.55$1,156
Feb 2024055776.091.78$993
Jan 2024090073.023.30$2,968
Dec 2023080771.262.61$2,107
Nov 2023086277.892.81$2,420
Oct 202301,16185.443.09$3,584
Sep 2023036389.042.74$993
Aug 202315458380.522.67$13,958
Jul 2023051474.852.64$1,358
Jun 2023055468.962.26$1,251
May 2023059070.622.23$1,314
Apr 2023050578.122.24$1,130
Mar 2023066772.852.39$1,596
Feb 2023036375.112.47$895
Jan 2023045876.533.39$1,552
Dec 2022047576.415.73$2,721
Nov 2022055985.005.65$3,156
Oct 2022052687.185.86$3,084
Sep 2022050684.888.16$4,131
Aug 2022048094.529.13$4,381
Jul 20220666101.587.54$5,023
Jun 20220695115.097.98$5,544
May 20220805109.378.43$6,789
Apr 20220747104.226.84$5,108
Mar 20220803108.885.08$4,076
Feb 2022067391.054.86$3,270
Jan 2022045881.844.54$2,078
Dec 2021056871.323.90$2,215
Nov 2021054877.435.24$2,870
Oct 2021048779.795.71$2,783
Sep 2021046969.865.35$2,510
Aug 2021038466.024.22$1,621
Jul 2021040270.783.98$1,601
Jun 2021026469.493.38$892
May 2021016763.483.02$504
Apr 2021018360.362.76$505
Mar 2021042461.302.72$1,152
Feb 2021053157.805.55$2,946
Jan 2021081350.412.81$2,285
Dec 202019275944.642.68$10,602
Nov 202001,20138.772.71$3,251
Oct 2020021236.972.48$525
Sep 2020027237.091.99$542
Aug 2020035139.982.39$837
Jul 2020060038.371.83$1,095
Jun 2020072834.901.69$1,231
May 2020074616.921.81$1,354
Apr 2020048714.751.80$879
Mar 2020051830.341.86$962
Feb 2020047149.881.98$933
Jan 2020044057.252.09$922
Dec 2019048959.012.30$1,127
Nov 2019043655.302.75$1,199
Oct 2019042653.472.42$1,030
Sep 2019047255.052.66$1,254
Aug 2019047553.112.30$1,095
Jul 2019049056.272.46$1,205
Jun 2019040952.782.49$1,019
May 2019045958.482.74$1,258
Apr 2019242562.632.75$1,294
Mar 2019047356.803.06$1,448
Feb 2019043450.852.79$1,212
Jan 2019049546.033.23$1,598
Dec 2018047946.594.19$2,005
Nov 2018049652.934.24$2,102
Oct 2018053161.443.40$1,804
Sep 2018047059.543.11$1,461
Aug 2018049559.403.07$1,518
Jul 2018051165.142.93$1,498
Jun 2018052660.183.08$1,618
May 2018048465.382.90$1,404
Apr 2018052263.842.90$1,514
Mar 2018057761.222.79$1,608
Feb 2018066561.782.77$1,839
Jan 2018042162.874.01$1,688
Dec 2017050557.272.92$1,475
Nov 2017044255.423.12$1,378
Oct 2017048349.292.98$1,441
Sep 201718961747.523.09$10,886
Aug 2017054345.373.00$1,631
Jul 2017056843.873.09$1,754
Jun 2017068242.493.09$2,106
May 2017068045.373.26$2,219
Apr 2017069647.933.21$2,235
Mar 2017072446.772.98$2,160
Feb 2017187250.452.95$2,625
Jan 2017090749.413.42$3,101
Dec 2016079948.763.72$2,975
Nov 2016095942.492.64$2,536
Oct 201601,00046.193.09$3,090
Sep 201601,01841.553.10$3,156
Aug 201601,01941.442.92$2,980
Jul 201601,16041.622.92$3,392
Jun 201601,09145.352.69$2,930
May 201601,08442.521.99$2,158
Apr 201601,17436.561.99$2,337
Mar 201601,18533.011.79$2,126
Feb 20162021,36726.472.06$8,168
Jan 201602,82927.352.36$6,689
Dec 201502,49932.362.00$5,002
Nov 201501,05038.792.17$2,276
Oct 201501,51943.552.43$3,686
Sep 201521,25142.992.76$3,537
Aug 201501,46440.162.87$4,205
Jul 201501,40348.152.95$4,132
Jun 201511,57456.152.88$4,594
May 201501,24455.212.96$3,677
Apr 201501,19949.822.71$3,245
Mar 201521,31642.892.93$3,948
Feb 201501,11144.662.98$3,307
Jan 201501,29043.433.10$4,000
Dec 201401,28454.693.59$4,611
Nov 201401,28870.464.25$5,476
Oct 201432,79178.303.90$11,122
Sep 201412,68986.164.05$10,964
Aug 201443,03689.394.04$12,608
Jul 201402,90596.564.18$12,142
Jun 201401,31998.164.74$6,248
May 201412,86794.734.73$13,646
Apr 201452,77995.944.81$13,844
Mar 201402,63995.895.06$13,345
Feb 201401,23497.406.19$7,641
Jan 201401,37190.404.86$6,664
Dec 201301,41191.824.35$6,144
Nov 201301,41088.853.74$5,271
Oct 201301,47797.423.78$5,582
Sep 201301,500104.113.72$5,577
Aug 201301,481104.253.52$5,217
Jul 201301,626102.523.72$6,045
Jun 201301,33994.403.93$5,267
May 201301,27594.834.15$5,290
Apr 201301,28993.964.28$5,520
Mar 201341,53893.623.91$6,392
Feb 201341,43791.233.42$5,279
Jan 201321,80691.603.42$6,360
Dec 201251,33486.773.42$4,996
Nov 201251,38086.953.62$5,437
Oct 201281,53589.383.40$5,934
Sep 20120094.672.92$0
Aug 201241,69692.662.91$5,303
Jul 201231,80385.133.02$5,702
Jun 201222,04879.822.52$5,319
May 201241,97391.612.49$5,276
Apr 201211,859101.652.00$3,814
Mar 201241,841105.052.22$4,511
Feb 201241,944101.102.57$5,401
Jan 201232,73298.092.73$7,764
Dec 201102,30596.873.24$7,468
Nov 20111812,14795.723.31$24,435
Oct 201132,12084.983.65$7,990
Sep 201111,78683.623.99$7,202
Aug 201111,43183.404.15$6,021
Jul 201171,93994.144.52$9,418
Jun 201132,25392.904.64$10,732
May 201112,14898.134.40$9,560
Apr 201102,384105.964.33$10,331
Mar 201162,33196.364.06$10,036
Feb 201102,71385.644.18$11,340
Jan 201154,27886.504.59$20,063
Dec 201013,62585.734.35$15,846
Nov 201033,57980.843.80$13,826
Oct 201003,78278.103.51$13,271
Sep 201033,80272.633.98$15,348
Aug 20101954,46173.684.42$34,082
Jul 201012,85972.554.74$13,614
Jun 201022,40970.364.91$11,970
May 201063,33371.124.24$14,543
Apr 2010123,11181.694.12$13,806
Mar 201073,48578.394.39$15,843
Feb 201073,51173.585.44$19,623
Jan 201063,95174.365.96$24,010
Dec 200903,29171.445.48$18,047
Nov 200923,61874.593.75$13,722
Oct 200994,24772.544.11$18,109
Sep 20091874,57865.543.06$26,286
Aug 200905,31867.423.22$17,116
Jul 200965,63461.133.46$19,886
Jun 2009126,44066.163.90$25,878
May 2009107,10454.743.93$28,436
Apr 2009196,21846.773.59$23,196
Mar 20091956,00542.144.06$32,592
Feb 200985,07932.814.63$23,793
Jan 2009165,21235.865.37$28,567
Dec 20081976,09737.105.98$43,751
Nov 2008137,81755.496.86$54,349
Oct 20082065,40075.246.92$52,878
Sep 20081956,886101.767.88$74,085
Aug 200821314,305114.228.48$145,678
Jul 2008034,869131.0811.39$397,138

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 67.70 =         $0
Gas                  182 Mcf  × $  4.27 =       $777

────────────────────────────────────────────────────
Month total                                     $777

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/G/241409 is the state's own key, not one this site invented.