JOHNSON "B"

Operated by BYRNE OIL COMPANY (P-5 119795) in the REB (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 118496District 7BField 75095500CondensateGasSaveExport
Value, all time
$115 k
Jan 1993 – Jun 2006
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
162
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 431 leases and 525 wells, and the rule below applies to all of them.

Discovered
1982-03-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-01-01.

The Commission's schedule remark for this field reads: EFF. 09-10-84 PER DOCKET #7B-82,934

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition953 bbl$19,772
GasProduction50,396 Mcf$95,239
Total$115,011

23,851 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4479, -98.8153. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.44785, -98.81525 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,850 ft
1 wells filed one
Completion to plug
21.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,850 ft.

Completions filed
Nov 1984
1 of 1 wells
Plug dates filed
Feb 2006
1 of 1 wells

Last completion to plug: a median of 21.3 years across the 1 well that filed both dates, with the middle half between 21.3 years and 21.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1333608313,850 ftNov 1984Feb 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (162)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

162 months

Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 200688056.707.08$4,990
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 2005017952.337.38$1,321
May 2005017745.226.65$1,177
Apr 2005014949.207.36$1,097
Mar 2005017750.377.15$1,266
Feb 2005013045.226.31$821
Jan 2005016343.166.32$1,031
Dec 2004016339.866.75$1,100
Nov 2004016645.286.33$1,051
Oct 2004010749.706.52$697
Sep 2004016143.245.28$851
Aug 2004017342.375.55$960
Jul 2004015938.286.08$967
Jun 2004016336.106.43$1,049
May 2004017337.486.49$1,124
Apr 2004015734.475.86$920
Mar 2004017734.365.53$979
Feb 2004016932.455.51$931
Jan 2004017432.036.30$1,096
Dec 2003018830.266.30$1,185
Nov 2003018628.804.60$855
Oct 2003018428.174.76$876
Sep 2003019026.314.75$902
Aug 2003018229.765.13$934
Jul 2003017929.415.17$926
Jun 2003015928.565.98$951
May 2003018226.595.97$1,087
Apr 2003018926.675.41$1,022
Mar 2003019531.146.10$1,189
Feb 2003016633.487.93$1,316
Jan 2003017730.315.58$988
Dec 2002017526.914.85$849
Nov 2002016924.664.14$699
Oct 2002018126.464.23$765
Sep 2002017427.443.64$633
Aug 2002018525.963.16$585
Jul 2002018724.583.06$573
Jun 2002017223.733.34$574
May 2002017724.663.58$634
Apr 2002014023.653.51$492
Mar 2002016122.003.10$500
Feb 2002013618.222.38$323
Jan 2002019717.172.38$468
Dec 2001019316.932.36$456
Nov 2001012218.072.41$293
Oct 2001012719.782.53$321
Sep 2001018424.262.25$414
Aug 2001017724.873.05$540
Jul 2001021523.933.20$687
Jun 2001021124.563.82$807
May 2001021125.524.31$909
Apr 2001021724.685.34$1,158
Mar 2001024424.545.38$1,312
Feb 2001021727.755.77$1,251
Jan 2001022727.478.40$1,907
Dec 2000019526.889.12$1,779
Nov 2000023732.215.66$1,341
Oct 2000035131.235.15$1,806
Sep 2000035031.875.19$1,815
Aug 2000038529.644.54$1,748
Jul 2000037128.534.09$1,517
Jun 2000035329.304.40$1,552
May 2000038427.263.68$1,413
Apr 2000037324.513.12$1,162
Mar 2000039528.422.86$1,130
Feb 2000037127.622.73$1,012
Jan 2000035225.272.48$873
Dec 1999027024.282.42$654
Nov 1999028923.192.43$703
Oct 1999031520.982.80$883
Sep 1999032121.752.62$841
Aug 1999032919.262.88$946
Jul 199913535417.892.37$3,255
Jun 1999030115.942.36$711
May 1999037515.792.32$870
Apr 1999028515.102.21$629
Mar 1999030912.471.84$568
Feb 199903479.981.82$631
Jan 1999042510.381.90$807
Dec 199804659.201.77$825
Nov 1998045310.892.19$990
Oct 1998049512.421.97$975
Sep 1998045012.592.08$937
Aug 1998046711.301.91$891
Jul 1998038311.742.24$857
Jun 1998035511.242.24$794
May 1998038112.622.21$841
Apr 1998040413.042.51$1,012
Mar 1998035212.802.31$813
Feb 1998029813.952.30$685
Jan 1998036214.702.15$780
Dec 1997038416.322.41$926
Nov 1997036218.193.09$1,118
Oct 1997040019.253.15$1,260
Sep 1997037617.742.95$1,111
Aug 1997041117.862.55$1,050
Jul 199715318517.582.25$3,105
Jun 1997035717.242.26$806
May 1997031218.972.31$720
Apr 1997031617.882.08$658
Mar 1997036318.951.94$704
Feb 1997030120.492.21$664
Jan 1997038323.483.54$1,356
Dec 1996033423.32$0
Nov 1996031921.97$0
Oct 1996028123.31$0
Sep 1996032122.22$0
Aug 1996032920.26$0
Jul 1996033319.55$0
Jun 1996030718.73$0
May 19964826019.43$933
Apr 1996050721.51$0
Mar 1996058119.38$0
Feb 1996065216.98$0
Jan 199617061217.07$2,902
Dec 1995063117.19$0
Nov 1995052616.00$0
Oct 1995053915.43$0
Sep 1995054516.18$0
Aug 1995058215.92$0
Jul 1995059115.24$0
Jun 1995056316.41$0
May 19956257317.56$1,089
Apr 1995042417.73$0
Mar 1995060916.44$0
Feb 1995055516.58$0
Jan 1995061115.92$0
Dec 1994060815.03$0
Nov 1994055115.90$0
Oct 1994057915.58$0
Sep 199416747315.29$2,553
Aug 1994045316.13$0
Jul 1994053117.56$0
Jun 1994048017.09$0
May 1994048015.88$0
Apr 1994047714.14$0
Mar 1994049312.46$0
Feb 1994044312.50$0
Jan 1994050512.66$0
Dec 1993052612.33$0
Nov 1993057914.49$0
Oct 1993061515.85$0
Sep 1993045515.03$0
Aug 1993047215.66$0
Jul 1993051415.46$0
Jun 1993049816.79$0
May 1993049017.68$0
Apr 1993048518.05$0
Mar 1993056718.14$0
Feb 1993048217.90$0
Jan 199313051016.93$2,201

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2006 — as filed, then multipliedworked
Condensate            88 bbl  × $ 56.70 =     $4,990
Gas                    0 Mcf  × $  7.08 =         $0

────────────────────────────────────────────────────
Month total                                   $4,990

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/118496 is the state's own key, not one this site invented.