Operated by HEXAGON OIL AND GAS INC. (P-5 383200) in the BIG SUNDAY CREEK (BIG SALINE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 127220District 7BField 08050200NGPA filingCondensateGasSaveExport
Value, all time
$486 k
Jan 1993 – Feb 2017
Value, last 12 filed months
$110
at the published price for each month
Months reported
290
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 78 leases and 78 wells, and the rule below applies to all of them.

Discovered
1984-11-29
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1993-08-09.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFFECTIVE 1/1/95.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition186 bbl$3,234
GasProduction164,983 Mcf$482,425
Total$485,659

53,055 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4233, -98.2225. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.42325, -98.22249 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,100 ft
1 wells filed one
Completion to plug
28.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,100 ft.

Completions filed
May 1988
1 of 1 wells
Plug dates filed
Mar 2017
1 of 1 wells

Last completion to plug: a median of 28.8 years across the 1 well that filed both dates, with the middle half between 28.8 years and 28.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1433090624,100 ftMay 1988Mar 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (290)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

290 months

Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20163036.561.99$110
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 2013059104.113.72$219
Aug 2013070104.253.52$247
Jul 2013067102.523.72$249
Jun 201309094.403.93$354
May 2013010394.834.15$427
Apr 201309393.964.28$398
Mar 2013011793.623.91$458
Feb 2013010891.233.42$369
Jan 2013011291.603.42$383
Dec 201209286.773.42$315
Nov 201209586.953.62$344
Oct 2012010989.383.40$371
Sep 2012010994.672.92$318
Aug 2012010992.662.91$317
Jul 2012013285.133.02$399
Jun 2012018079.822.52$453
May 2012020491.612.49$508
Apr 20120237101.652.00$473
Mar 201200105.052.22$0
Feb 20120149101.102.57$383
Jan 2012028598.092.73$779
Dec 2011014196.873.24$457
Nov 2011022895.723.31$755
Oct 2011026084.983.65$949
Sep 2011032783.623.99$1,303
Aug 2011043983.404.15$1,822
Jul 2011055994.144.52$2,525
Jun 2011056492.904.64$2,617
May 2011064998.134.40$2,859
Apr 20110616105.964.33$2,669
Mar 2011073296.364.06$2,970
Feb 2011074985.644.18$3,131
Jan 201101,50586.504.59$6,906
Dec 2010025085.734.35$1,087
Nov 2010012880.843.80$486
Oct 2010015278.103.51$533
Sep 2010014672.633.98$581
Aug 2010012373.684.42$544
Jul 2010015772.554.74$744
Jun 2010013570.364.91$663
May 2010015571.124.24$656
Apr 2010018881.694.12$775
Mar 2010024578.394.39$1,075
Feb 2010014573.585.44$789
Jan 2010018374.365.96$1,091
Dec 2009017471.445.48$954
Nov 2009018174.593.75$679
Oct 2009018472.544.11$756
Sep 2009017965.543.06$549
Aug 2009018667.423.22$599
Jul 2009019061.133.46$658
Jun 2009018466.163.90$717
May 2009018854.743.93$738
Apr 2009016046.773.59$574
Mar 2009027942.144.06$1,132
Feb 2009010532.814.63$486
Jan 2009021535.865.37$1,155
Dec 2008021837.105.98$1,303
Nov 2008021355.496.86$1,461
Oct 2008025075.246.92$1,731
Sep 20080220101.767.88$1,733
Aug 20080247114.228.48$2,095
Jul 20080247131.0811.39$2,813
Jun 20080250131.3313.03$3,258
May 20080267123.1711.57$3,090
Apr 20080274110.3110.45$2,865
Mar 20080321101.909.66$3,102
Feb 2008029892.538.77$2,614
Jan 2008022690.388.21$1,854
Dec 2007023488.337.30$1,709
Nov 2007024191.677.29$1,757
Oct 2007026782.856.92$1,848
Sep 2007026675.846.24$1,661
Aug 2007027969.066.39$1,782
Jul 2007031570.906.39$2,012
Jun 2007036662.007.55$2,763
May 2007037558.747.85$2,942
Apr 2007063259.617.81$4,933
Mar 2007028956.927.30$2,110
Feb 2007017055.108.22$1,397
Jan 2007024050.306.73$1,614
Dec 2006030256.656.92$2,089
Nov 2006028554.207.62$2,171
Oct 2006031054.906.01$1,864
Sep 2006031360.085.04$1,577
Aug 2006031368.717.34$2,297
Jul 2006032869.376.34$2,080
Jun 2006033066.286.38$2,107
May 2006035166.016.42$2,255
Apr 2006034764.397.36$2,554
Mar 2006036256.707.08$2,564
Feb 2006032757.597.75$2,535
Jan 2006036260.598.93$3,234
Dec 2005037254.9413.42$4,991
Nov 2005037154.6910.59$3,928
Oct 2005039358.3413.80$5,422
Sep 2005039461.4512.08$4,759
Aug 2005040861.519.80$3,997
Jul 2005041655.697.84$3,263
Jun 2005042152.337.38$3,107
May 2005044945.226.65$2,986
Apr 2005045349.207.36$3,334
Mar 2005051650.377.15$3,692
Feb 2005056745.226.31$3,579
Jan 2005068143.166.32$4,305
Dec 2004071939.866.75$4,854
Nov 2004082445.286.33$5,216
Oct 2004092549.706.52$6,026
Sep 2004079643.245.28$4,206
Aug 2004058342.375.55$3,236
Jul 2004067338.286.08$4,095
Jun 2004069236.106.43$4,452
May 2004078837.486.49$5,118
Apr 2004076834.475.86$4,499
Mar 2004079034.365.53$4,369
Feb 2004071032.455.51$3,912
Jan 2004092932.036.30$5,852
Dec 2003085130.266.30$5,363
Nov 2003090828.804.60$4,172
Oct 200301,05528.174.76$5,021
Sep 2003093826.314.75$4,455
Aug 200301,03229.765.13$5,294
Jul 200301,10929.415.17$5,734
Jun 2003064228.565.98$3,841
May 2003037526.595.97$2,240
Apr 2003037626.675.41$2,033
Mar 2003039131.146.10$2,384
Feb 2003035133.487.93$2,782
Jan 2003041830.315.58$2,333
Dec 2002042826.914.85$2,077
Nov 2002041524.664.14$1,717
Oct 2002047226.464.23$1,996
Sep 2002045127.443.64$1,639
Aug 2002047225.963.16$1,493
Jul 2002048124.583.06$1,473
Jun 2002048223.733.34$1,609
May 2002051324.663.58$1,839
Apr 2002049423.653.51$1,735
Mar 2002051622.003.10$1,601
Feb 2002048718.222.38$1,157
Jan 2002055817.172.38$1,326
Dec 2001052116.932.36$1,232
Nov 2001044718.072.41$1,075
Oct 2001057819.782.53$1,462
Sep 2001058824.262.25$1,324
Aug 2001064524.873.05$1,969
Jul 2001069023.933.20$2,206
Jun 2001089824.563.82$3,434
May 2001086025.524.31$3,704
Apr 2001094824.685.34$5,058
Mar 2001076424.545.38$4,108
Feb 200101,07327.755.77$6,188
Jan 2001066227.478.40$5,560
Dec 2000087626.889.12$7,991
Nov 2000091532.215.66$5,177
Oct 2000089631.235.15$4,610
Sep 2000084631.875.19$4,388
Aug 2000088529.644.54$4,019
Jul 200001,03228.534.09$4,221
Jun 2000096529.304.40$4,243
May 2000094727.263.68$3,485
Apr 2000099024.513.12$3,085
Mar 200001,23728.422.86$3,538
Feb 200001,07127.622.73$2,920
Jan 2000085825.272.48$2,128
Dec 199901,03224.282.42$2,501
Nov 199901,01523.192.43$2,471
Oct 1999121,03320.982.80$3,148
Sep 199901,01721.752.62$2,663
Aug 199901,43719.262.88$4,132
Jul 199901,34917.892.37$3,200
Jun 199901,25115.942.36$2,955
May 199901,25715.792.32$2,918
Apr 199901,23715.102.21$2,731
Mar 199901,32112.471.84$2,428
Feb 199901,0669.981.82$1,938
Jan 199911,39610.381.90$2,663
Dec 199801,0399.201.77$1,842
Nov 199801,24010.892.19$2,710
Oct 199801,52212.421.97$2,997
Sep 199801,07012.592.08$2,228
Aug 199801,17511.301.91$2,241
Jul 199801,45911.742.24$3,264
Jun 199801,38211.242.24$3,092
May 199801,35212.622.21$2,983
Apr 199801,42613.042.51$3,573
Mar 1998099312.802.31$2,293
Feb 199801,85913.952.30$4,274
Jan 1998081714.702.15$1,760
Dec 1997033316.322.41$803
Nov 1997095318.193.09$2,943
Oct 1997095919.253.15$3,021
Sep 1997073617.742.95$2,175
Aug 1997071817.862.55$1,834
Jul 1997071217.582.25$1,600
Jun 1997097417.242.26$2,199
May 1997068818.972.31$1,588
Apr 1997065017.882.08$1,354
Mar 1997073718.951.94$1,429
Feb 1997061220.492.21$1,350
Jan 1997091023.483.54$3,221
Dec 199601,05323.32$0
Nov 1996075521.97$0
Oct 1996081923.31$0
Sep 1996091822.22$0
Aug 1996098320.26$0
Jul 1996077919.55$0
Jun 1996086218.73$0
May 199601,41319.43$0
Apr 1996065821.51$0
Mar 1996068519.38$0
Feb 1996097816.98$0
Jan 1996072817.07$0
Dec 1995074617.19$0
Nov 1995081616.00$0
Oct 1995097715.43$0
Sep 199501,08116.18$0
Aug 1995094115.92$0
Jul 1995099115.24$0
Jun 199501,17216.41$0
May 1995098917.56$0
Apr 1995381,03417.73$674
Mar 199501,41016.44$0
Feb 199513281416.58$2,189
Jan 199501,33515.92$0
Dec 199401,12815.03$0
Nov 1994088615.90$0
Oct 199401,09715.58$0
Sep 199401,13915.29$0
Aug 1994087016.13$0
Jul 199401,00517.56$0
Jun 199401,01817.09$0
May 199401,33115.88$0
Apr 199401,06014.14$0
Mar 199401,22712.46$0
Feb 199401,63412.50$0
Jan 199401,10412.66$0
Dec 199301,25512.33$0
Nov 199301,34614.49$0
Oct 199301,65615.85$0
Sep 199301,05715.03$0
Aug 199301,53515.66$0
Jul 199301,25515.46$0
Jun 199301,59616.79$0
May 199301,26017.68$0
Apr 199301,60918.05$0
Mar 199301,22818.14$0
Feb 199301,44217.90$0
Jan 199301,38016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2016 — as filed, then multipliedworked
Condensate             3 bbl  × $ 36.56 =       $110
Gas                    0 Mcf  × $  1.99 =         $0

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/127220 is the state's own key, not one this site invented.