CEE BAR RANCH "L"

Operated by HEXAGON OIL AND GAS INC. (P-5 383200) in the BIG SUNDAY CREEK (BIG SALINE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 127265District 7BField 08050200NGPA filingCondensateGasSaveExport
Value, all time
$754 k
Jan 1993 – Feb 2018
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
302
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 78 leases and 78 wells, and the rule below applies to all of them.

Discovered
1984-11-29
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1993-08-09.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED EFFECTIVE 1/1/95.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition108 bbl$1,791
GasProduction213,759 Mcf$752,239
Total$754,029

50,062 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4305, -98.2220. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.43055, -98.22196 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,100 ft
1 wells filed one
Completion to plug
29.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,100 ft.

Completions filed
May 1988
1 of 1 wells
Plug dates filed
Feb 2018
1 of 1 wells

Last completion to plug: a median of 29.8 years across the 1 well that filed both dates, with the middle half between 29.8 years and 29.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1433090424,100 ftMay 1988Feb 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (302)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

302 months

Feb 2018016761.782.77$462
Jan 2018039762.874.01$1,592
Dec 2017040157.272.92$1,172
Nov 2017039155.423.12$1,219
Oct 2017040949.292.98$1,220
Sep 2017039947.523.09$1,232
Aug 2017041245.373.00$1,238
Jul 2017039243.873.09$1,210
Jun 2017032242.493.09$994
May 2017043645.373.26$1,423
Apr 2017041347.933.21$1,326
Mar 2017041246.772.98$1,229
Feb 2017039850.452.95$1,175
Jan 2017041649.413.42$1,422
Dec 2016042148.763.72$1,567
Nov 2016043142.492.64$1,140
Oct 2016044646.193.09$1,378
Sep 2016043441.553.10$1,346
Aug 2016045941.442.92$1,342
Jul 2016045341.622.92$1,325
Jun 2016036245.352.69$972
May 2016042542.521.99$846
Apr 2016045936.561.99$914
Mar 2016057133.011.79$1,024
Feb 2016037426.472.06$772
Jan 2016043827.352.36$1,036
Dec 2015051532.362.00$1,031
Nov 2015051538.792.17$1,116
Oct 2015051743.552.43$1,255
Sep 2015054742.992.76$1,509
Aug 2015065640.162.87$1,884
Jul 2015047448.152.95$1,396
Jun 2015052156.152.88$1,502
May 2015050355.212.96$1,487
Apr 2015044349.822.71$1,199
Mar 2015046742.892.93$1,371
Feb 2015043244.662.98$1,286
Jan 2015045243.433.10$1,401
Dec 2014050254.693.59$1,803
Nov 2014053070.464.25$2,253
Oct 2014049578.303.90$1,931
Sep 2014051286.164.05$2,071
Aug 2014060889.394.04$2,453
Jul 2014059096.564.18$2,466
Jun 2014052598.164.74$2,487
May 2014057694.734.73$2,723
Apr 2014051395.944.81$2,467
Mar 2014040395.895.06$2,038
Feb 2014019697.406.19$1,214
Jan 2014044590.404.86$2,163
Dec 2013027391.824.35$1,189
Nov 2013047888.853.74$1,787
Oct 2013055897.423.78$2,109
Sep 20130552104.113.72$2,052
Aug 20130543104.253.52$1,913
Jul 20130548102.523.72$2,037
Jun 2013046294.403.93$1,817
May 2013058594.834.15$2,427
Apr 2013050593.964.28$2,163
Mar 2013057493.623.91$2,246
Feb 2013053991.233.42$1,843
Jan 2013054691.603.42$1,867
Dec 2012054886.773.42$1,874
Nov 2012056786.953.62$2,055
Oct 2012058389.383.40$1,982
Sep 2012054394.672.92$1,585
Aug 2012058692.662.91$1,704
Jul 2012059985.133.02$1,809
Jun 2012050279.822.52$1,265
May 2012055291.612.49$1,374
Apr 20120498101.652.00$994
Mar 20120575105.052.22$1,278
Feb 20120486101.102.57$1,249
Jan 2012051598.092.73$1,408
Dec 2011059196.873.24$1,915
Nov 2011059395.723.31$1,964
Oct 2011058484.983.65$2,131
Sep 2011044483.623.99$1,770
Aug 2011060383.404.15$2,502
Jul 2011061194.144.52$2,760
Jun 2011054192.904.64$2,510
May 2011060698.134.40$2,669
Apr 20110538105.964.33$2,331
Mar 2011063196.364.06$2,560
Feb 2011046785.644.18$1,952
Jan 2011049086.504.59$2,249
Dec 2010055385.734.35$2,404
Nov 2010057380.843.80$2,175
Oct 2010056078.103.51$1,965
Sep 2010051472.633.98$2,045
Aug 2010062573.684.42$2,762
Jul 2010065672.554.74$3,107
Jun 2010063170.364.91$3,098
May 2010069571.124.24$2,943
Apr 2010057681.694.12$2,375
Mar 2010070378.394.39$3,085
Feb 2010057673.585.44$3,135
Jan 2010062874.365.96$3,745
Dec 2009068371.445.48$3,745
Nov 2009073374.593.75$2,750
Oct 2009064772.544.11$2,659
Sep 2009069365.543.06$2,124
Aug 2009059367.423.22$1,909
Jul 2009060161.133.46$2,082
Jun 2009061266.163.90$2,384
May 2009063954.743.93$2,509
Apr 2009047346.773.59$1,697
Mar 2009079542.144.06$3,227
Feb 2009033332.814.63$1,543
Jan 2009075435.865.37$4,050
Dec 2008067537.105.98$4,035
Nov 2008071455.496.86$4,898
Oct 2008080775.246.92$5,586
Sep 20080738101.767.88$5,813
Aug 20080761114.228.48$6,456
Jul 20080491131.0811.39$5,592
Jun 20080537131.3313.03$6,999
May 20080686123.1711.57$7,940
Apr 20080758110.3110.45$7,925
Mar 20080820101.909.66$7,925
Feb 2008057592.538.77$5,043
Jan 2008074290.388.21$6,089
Dec 2007073588.337.30$5,367
Nov 2007078491.677.29$5,717
Oct 2007083182.856.92$5,752
Sep 2007077375.846.24$4,827
Aug 2007087269.066.39$5,570
Jul 2007094570.906.39$6,037
Jun 2007048862.007.55$3,684
May 2007079658.747.85$6,246
Apr 2007079659.617.81$6,213
Mar 2007087856.927.30$6,411
Feb 2007067655.108.22$5,554
Jan 2007081150.306.73$5,455
Dec 2006095056.656.92$6,573
Nov 2006092254.207.62$7,023
Oct 200601,11554.906.01$6,705
Sep 2006070460.085.04$3,546
Aug 2006068168.717.34$4,998
Jul 2006073569.376.34$4,662
Jun 2006090266.286.38$5,758
May 200601,05666.016.42$6,785
Apr 200601,10364.397.36$8,119
Mar 200601,22256.707.08$8,655
Feb 200601,21557.597.75$9,418
Jan 200601,44260.598.93$12,882
Dec 2005068254.9413.42$9,149
Nov 2005051154.6910.59$5,411
Oct 2005039958.3413.80$5,505
Sep 2005044661.4512.08$5,387
Aug 2005044761.519.80$4,379
Jul 2005045355.697.84$3,553
Jun 2005043652.337.38$3,218
May 2005072145.226.65$4,795
Apr 2005046449.207.36$3,415
Mar 2005047750.377.15$3,413
Feb 2005054045.226.31$3,408
Jan 2005067043.166.32$4,236
Dec 2004065839.866.75$4,442
Nov 2004038045.286.33$2,406
Oct 2004063349.706.52$4,124
Sep 2004071443.245.28$3,773
Aug 2004067642.375.55$3,752
Jul 2004049138.286.08$2,987
Jun 2004061336.106.43$3,943
May 2004059637.486.49$3,871
Apr 2004067234.475.86$3,937
Mar 2004066334.365.53$3,666
Feb 2004067332.455.51$3,708
Jan 2004077732.036.30$4,895
Dec 2003064630.266.30$4,071
Nov 2003068328.804.60$3,138
Oct 2003051328.174.76$2,442
Sep 2003066326.314.75$3,149
Aug 2003047029.765.13$2,411
Jul 2003071129.415.17$3,676
Jun 2003049428.565.98$2,956
May 2003074926.595.97$4,474
Apr 2003076526.675.41$4,137
Mar 2003081731.146.10$4,980
Feb 2003048133.487.93$3,812
Jan 2003063830.315.58$3,561
Dec 2002070026.914.85$3,398
Nov 2002062424.664.14$2,581
Oct 2002059926.464.23$2,533
Sep 2002052927.443.64$1,923
Aug 2002060825.963.16$1,924
Jul 2002056824.583.06$1,739
Jun 2002063623.733.34$2,123
May 2002061624.663.58$2,208
Apr 2002064123.653.51$2,251
Mar 2002059522.003.10$1,846
Feb 2002056518.222.38$1,342
Jan 2002073517.172.38$1,746
Dec 2001068316.932.36$1,615
Nov 2001064218.072.41$1,544
Oct 2001057619.782.53$1,457
Sep 2001065724.262.25$1,479
Aug 2001069824.873.05$2,131
Jul 2001062123.933.20$1,985
Jun 2001096524.563.82$3,690
May 2001062625.524.31$2,696
Apr 2001070324.685.34$3,751
Mar 2001045724.545.38$2,457
Feb 2001060427.755.77$3,483
Jan 2001085127.478.40$7,147
Dec 200001,12026.889.12$10,217
Nov 2000075132.215.66$4,249
Oct 2000067331.235.15$3,463
Sep 2000076531.875.19$3,968
Aug 2000080829.644.54$3,669
Jul 2000071028.534.09$2,904
Jun 2000079629.304.40$3,500
May 2000077527.263.68$2,852
Apr 2000091524.513.12$2,851
Mar 200001,16828.422.86$3,340
Feb 2000097827.622.73$2,667
Jan 2000180225.272.48$2,015
Dec 1999173624.282.42$1,808
Nov 199911,02123.192.43$2,508
Oct 1999080320.982.80$2,251
Sep 199921,03821.752.62$2,762
Aug 199941,00419.262.88$2,964
Jul 1999079917.892.37$1,896
Jun 1999578815.942.36$1,941
May 1999074915.792.32$1,738
Apr 1999085715.102.21$1,892
Mar 1999085712.471.84$1,575
Feb 199908129.981.82$1,476
Jan 1999291610.381.90$1,761
Dec 199809939.201.77$1,761
Nov 1998184110.892.19$1,849
Oct 1998196412.421.97$1,911
Sep 1998084012.592.08$1,749
Aug 1998182411.301.91$1,583
Jul 1998086611.742.24$1,937
Jun 1998097011.242.24$2,170
May 1998076112.622.21$1,679
Apr 1998167413.042.51$1,702
Mar 1998151112.802.31$1,193
Feb 199801,19713.952.30$2,752
Jan 1998176114.702.15$1,655
Dec 1997081116.322.41$1,955
Nov 199701,25518.193.09$3,876
Oct 1997068919.253.15$2,170
Sep 1997080317.742.95$2,373
Aug 1997088417.862.55$2,258
Jul 1997061117.582.25$1,373
Jun 1997069917.242.26$1,578
May 1997084618.972.31$1,953
Apr 1997028917.882.08$602
Mar 1997063818.951.94$1,237
Feb 1997067620.492.21$1,491
Jan 199701,15923.483.54$4,103
Dec 1996070223.32$0
Nov 1996068121.97$0
Oct 1996070423.31$0
Sep 199601,01922.22$0
Aug 1996076020.26$0
Jul 1996094819.55$0
Jun 199601,04318.73$0
May 199601,26919.43$0
Apr 199601,04221.51$0
Mar 1996075219.38$0
Feb 1996074616.98$0
Jan 1996082217.07$0
Dec 1995094917.19$0
Nov 199501,03216.00$0
Oct 1995096315.43$0
Sep 199501,18316.18$0
Aug 1995080715.92$0
Jul 1995081015.24$0
Jun 199501,34016.41$0
May 199501,08617.56$0
Apr 1995074217.73$0
Mar 1995088616.44$0
Feb 1995851,18316.58$1,409
Jan 199501,11215.92$0
Dec 1994091815.03$0
Nov 199401,02815.90$0
Oct 199401,00615.58$0
Sep 199401,05215.29$0
Aug 199401,00116.13$0
Jul 199401,14917.56$0
Jun 199401,08117.09$0
May 199401,27615.88$0
Apr 199401,35014.14$0
Mar 199401,35312.46$0
Feb 1994086712.50$0
Jan 1994199212.66$13
Dec 199301,57112.33$0
Nov 1993087414.49$0
Oct 199301,11115.85$0
Sep 199301,16515.03$0
Aug 199301,12915.66$0
Jul 199301,43915.46$0
Jun 199301,00816.79$0
May 199301,38317.68$0
Apr 1993093418.05$0
Mar 199301,28718.14$0
Feb 199301,33817.90$0
Jan 199301,16916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.78 =         $0
Gas                  167 Mcf  × $  2.77 =       $462

────────────────────────────────────────────────────
Month total                                     $462

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/127265 is the state's own key, not one this site invented.