Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 102035District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$478 k
Jan 1993 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition24 bbl$1,751
GasProduction157,361 Mcf$476,112
Total$477,862

45,563 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5100, -101.4173. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51005, -101.41726 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,108 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,108 ft.

Completions filed
Jul 2002
1 of 1 wells

1 well

42-1053405827,108 ftJul 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026092106.413.05$280
Apr 202618598.932.87$343
Mar 20261089.753.15$90
Feb 202638063.503.75$491
Jan 202619859.138.00$843
Dec 202519956.664.41$494
Nov 202519558.593.93$432
Oct 202519159.383.30$360
Sep 202509462.743.08$289
Aug 202519763.933.01$356
Jul 202519766.743.32$388
Jun 202519366.483.13$357
May 202519760.553.23$374
Apr 202519562.363.54$399
Mar 202519467.704.27$469
Feb 202518470.884.34$436
Jan 20250074.324.28$0
Dec 202409168.993.12$284
Nov 202409269.052.20$202
Oct 202409371.372.28$212
Sep 202407969.612.36$187
Aug 202409075.632.06$186
Jul 202408879.932.15$189
Jun 202408778.082.63$229
May 202409178.812.20$200
Apr 202409284.451.66$153
Mar 202409780.301.55$150
Feb 202409176.091.78$162
Jan 202409773.023.30$320
Dec 202309471.262.61$245
Nov 202309577.892.81$267
Oct 202307185.443.09$219
Sep 202308989.042.74$243
Aug 202309380.522.67$249
Jul 202306174.852.64$161
Jun 202308868.962.26$199
May 202309470.622.23$209
Apr 202309578.122.24$213
Mar 202309572.852.39$227
Feb 202308875.112.47$217
Jan 202309176.533.39$308
Dec 202207776.415.73$441
Nov 202202085.005.65$113
Oct 20220687.185.86$35
Sep 20228184.888.16$687
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202208115.097.98$64
May 2022011109.378.43$93
Apr 202204104.226.84$27
Mar 202200108.885.08$0
Feb 202202091.054.86$97
Jan 20220881.844.54$36
Dec 20210571.323.90$20
Nov 20210577.435.24$26
Oct 202101779.795.71$97
Sep 202101469.865.35$75
Aug 202108966.024.22$376
Jul 2021010070.783.98$398
Jun 202109669.493.38$325
May 202107263.483.02$217
Apr 202109760.362.76$268
Mar 2021010061.302.72$272
Feb 202108557.805.55$472
Jan 202108650.412.81$242
Dec 202008844.642.68$235
Nov 202009738.772.71$263
Oct 2020010236.972.48$253
Sep 202008637.091.99$171
Aug 202009639.982.39$229
Jul 202009838.371.83$179
Jun 202009734.901.69$164
May 2020010316.921.81$187
Apr 2020011414.751.80$206
Mar 2020011330.341.86$210
Feb 2020011449.881.98$226
Jan 2020011357.252.09$237
Dec 2019010359.012.30$237
Nov 2019010155.302.75$278
Oct 2019010053.472.42$242
Sep 201909955.052.66$263
Aug 2019010253.112.30$235
Jul 2019010356.272.46$253
Jun 201909852.782.49$244
May 2019010358.482.74$282
Apr 2019010062.632.75$275
Mar 2019010856.803.06$331
Feb 201909450.852.79$262
Jan 2019010446.033.23$336
Dec 2018010446.594.19$435
Nov 2018010152.934.24$428
Oct 2018010761.443.40$364
Sep 2018010359.543.11$320
Aug 201808859.403.07$270
Jul 2018010365.142.93$302
Jun 201809960.183.08$305
May 2018010565.382.90$305
Apr 2018010163.842.90$293
Mar 2018010261.222.79$284
Feb 201804661.782.77$127
Jan 2018010262.874.01$409
Dec 2017010457.272.92$304
Nov 201705455.423.12$168
Oct 201706849.292.98$203
Sep 2017010147.523.09$312
Aug 2017011045.373.00$330
Jul 2017010943.873.09$337
Jun 2017010642.493.09$327
May 2017011045.373.26$359
Apr 2017010747.933.21$344
Mar 2017011246.772.98$334
Feb 2017010250.452.95$301
Jan 201707549.413.42$256
Dec 2016011148.763.72$413
Nov 2016010542.492.64$278
Oct 2016010946.193.09$337
Sep 2016010841.553.10$335
Aug 2016011141.442.92$325
Jul 2016011241.622.92$328
Jun 2016011245.352.69$301
May 2016011942.521.99$237
Apr 2016011336.561.99$225
Mar 201605233.011.79$93
Feb 201607426.472.06$153
Jan 2016010327.352.36$244
Dec 2015012432.362.00$248
Nov 2015011238.792.17$243
Oct 2015011643.552.43$281
Sep 2015011342.992.76$312
Aug 2015011540.162.87$330
Jul 2015011948.152.95$350
Jun 2015011656.152.88$334
May 2015012155.212.96$358
Apr 2015011649.822.71$314
Mar 2015012042.892.93$352
Feb 2015011044.662.98$327
Jan 201507143.433.10$220
Dec 2014012054.693.59$431
Nov 2014015270.464.25$646
Oct 2014015478.303.90$601
Sep 2014012786.164.05$514
Aug 2014010989.394.04$440
Jul 2014011396.564.18$472
Jun 2014011798.164.74$554
May 2014015094.734.73$709
Apr 2014013195.944.81$630
Mar 2014032095.895.06$1,618
Feb 2014032297.406.19$1,994
Jan 2014036290.404.86$1,760
Dec 2013033491.824.35$1,454
Nov 2013028188.853.74$1,050
Oct 2013021697.423.78$816
Sep 20130195104.113.72$725
Aug 20130296104.253.52$1,043
Jul 20130339102.523.72$1,260
Jun 2013033594.403.93$1,318
May 2013027894.834.15$1,153
Apr 2013033793.964.28$1,443
Mar 2013027793.623.91$1,084
Feb 2013030991.233.42$1,057
Jan 2013033991.603.42$1,159
Dec 2012034386.773.42$1,173
Nov 2012033286.953.62$1,203
Oct 2012034689.383.40$1,176
Sep 2012033294.672.92$969
Aug 2012035992.662.91$1,044
Jul 2012036585.133.02$1,103
Jun 2012034979.822.52$879
May 2012036991.612.49$918
Apr 20120360101.652.00$719
Mar 20120374105.052.22$831
Feb 20120345101.102.57$887
Jan 2012036998.092.73$1,009
Dec 2011038096.873.24$1,231
Nov 2011036595.723.31$1,209
Oct 2011037984.983.65$1,383
Sep 2011037283.623.99$1,483
Aug 2011035983.404.15$1,490
Jul 2011035294.144.52$1,590
Jun 2011034492.904.64$1,596
May 2011034698.134.40$1,524
Apr 20110256105.964.33$1,109
Mar 2011035696.364.06$1,444
Feb 2011030685.644.18$1,279
Jan 2011036686.504.59$1,679
Dec 2010037285.734.35$1,617
Nov 2010035680.843.80$1,351
Oct 2010037178.103.51$1,302
Sep 2010033372.633.98$1,325
Aug 2010036673.684.42$1,617
Jul 2010029572.554.74$1,397
Jun 2010035270.364.91$1,728
May 2010038671.124.24$1,635
Apr 2010034581.694.12$1,422
Mar 2010031778.394.39$1,391
Feb 2010032873.585.44$1,785
Jan 2010037374.365.96$2,225
Dec 2009039871.445.48$2,183
Nov 2009035974.593.75$1,347
Oct 2009037772.544.11$1,550
Sep 2009036765.543.06$1,125
Aug 2009037767.423.22$1,213
Jul 2009036461.133.46$1,261
Jun 2009092866.163.90$3,615
May 2009043954.743.93$1,723
Apr 2009035846.773.59$1,284
Mar 2009036442.144.06$1,477
Feb 2009032232.814.63$1,492
Jan 2009035835.865.37$1,923
Dec 2008036437.105.98$2,176
Nov 2008035355.496.86$2,422
Oct 2008036475.246.92$2,520
Sep 20080149101.767.88$1,174
Aug 20080281114.228.48$2,384
Jul 20080469131.0811.39$5,342
Jun 20080444131.3313.03$5,786
May 20080500123.1711.57$5,787
Apr 20080403110.3110.45$4,213
Mar 20080413101.909.66$3,991
Feb 2008039092.538.77$3,421
Jan 2008044090.388.21$3,611
Dec 2007043588.337.30$3,176
Nov 2007041491.677.29$3,019
Oct 2007044882.856.92$3,101
Sep 2007046475.846.24$2,897
Aug 2007058869.066.39$3,756
Jul 2007052170.906.39$3,328
Jun 2007037262.007.55$2,808
May 2007041358.747.85$3,241
Apr 2007033859.617.81$2,638
Mar 2007038756.927.30$2,826
Feb 2007025755.108.22$2,112
Jan 2007033550.306.73$2,253
Dec 2006032056.656.92$2,214
Nov 2006038554.207.62$2,933
Oct 2006037954.906.01$2,279
Sep 2006035160.085.04$1,768
Aug 2006034568.717.34$2,532
Jul 2006038569.376.34$2,442
Jun 2006033066.286.38$2,107
May 2006032066.016.42$2,056
Apr 2006027064.397.36$1,987
Mar 2006032656.707.08$2,309
Feb 2006026657.597.75$2,062
Jan 2006038160.598.93$3,404
Dec 2005045854.9413.42$6,144
Nov 2005035954.6910.59$3,801
Oct 2005037758.3413.80$5,201
Sep 2005035161.4512.08$4,240
Aug 2005035061.519.80$3,429
Jul 2005031255.697.84$2,447
Jun 2005042452.337.38$3,130
May 2005034945.226.65$2,321
Apr 2005036449.207.36$2,679
Mar 2005031050.377.15$2,218
Feb 2005032745.226.31$2,064
Jan 2005028543.166.32$1,802
Dec 2004033939.866.75$2,289
Nov 2004033345.286.33$2,108
Oct 2004036849.706.52$2,398
Sep 2004047143.245.28$2,489
Aug 2004042942.375.55$2,381
Jul 2004036438.286.08$2,215
Jun 2004037036.106.43$2,380
May 2004045837.486.49$2,975
Apr 2004039934.475.86$2,338
Mar 2004054334.365.53$3,003
Feb 2004037732.455.51$2,077
Jan 2004041332.036.30$2,602
Dec 2003028630.266.30$1,802
Nov 2003038528.804.60$1,769
Oct 2003040828.174.76$1,942
Sep 2003035526.314.75$1,686
Aug 2003047129.765.13$2,416
Jul 2003041229.415.17$2,130
Jun 2003037028.565.98$2,214
May 2003034626.595.97$2,067
Apr 2003037326.675.41$2,017
Mar 2003043831.146.10$2,670
Feb 2003042033.487.93$3,329
Jan 2003042430.315.58$2,367
Dec 2002054326.914.85$2,636
Nov 2002052924.664.14$2,188
Oct 2002058326.464.23$2,466
Sep 2002052427.443.64$1,905
Aug 2002042025.963.16$1,329
Jul 2002027724.583.06$848
Jun 2002052123.733.34$1,739
May 2002051524.663.58$1,846
Apr 2002055123.653.51$1,935
Mar 2002062722.003.10$1,945
Feb 2002054118.222.38$1,285
Jan 2002052517.172.38$1,247
Dec 2001069816.932.36$1,650
Nov 2001069718.072.41$1,677
Oct 2001063119.782.53$1,596
Sep 2001056524.262.25$1,272
Aug 2001063724.873.05$1,945
Jul 2001069423.933.20$2,219
Jun 2001061024.563.82$2,333
May 2001063625.524.31$2,739
Apr 2001054324.685.34$2,897
Mar 2001060024.545.38$3,226
Feb 2001054527.755.77$3,143
Jan 2001051327.478.40$4,309
Dec 2000048226.889.12$4,397
Nov 2000048532.215.66$2,744
Oct 2000056931.235.15$2,928
Sep 2000053031.875.19$2,749
Aug 2000053829.644.54$2,443
Jul 2000062028.534.09$2,536
Jun 2000063829.304.40$2,805
May 2000068727.263.68$2,528
Apr 2000070424.513.12$2,194
Mar 2000081228.422.86$2,322
Feb 2000096227.622.73$2,623
Jan 2000088925.272.48$2,205
Dec 1999066424.282.42$1,609
Nov 1999060423.192.43$1,470
Oct 1999072320.982.80$2,027
Sep 1999067321.752.62$1,762
Aug 1999073919.262.88$2,125
Jul 1999061817.892.37$1,466
Jun 1999069915.942.36$1,651
May 1999083015.792.32$1,926
Apr 1999065815.102.21$1,453
Mar 1999053912.471.84$991
Feb 199905329.981.82$967
Jan 1999055610.381.90$1,056
Dec 199806159.201.77$1,091
Nov 1998080510.892.19$1,760
Oct 1998069912.421.97$1,376
Sep 1998090712.592.08$1,889
Aug 1998077411.301.91$1,476
Jul 1998087011.742.24$1,946
Jun 1998079411.242.24$1,776
May 1998082412.622.21$1,818
Apr 1998085913.042.51$2,152
Mar 1998081712.802.31$1,887
Feb 1998064213.952.30$1,476
Jan 1998089214.702.15$1,922
Dec 1997083816.322.41$2,021
Nov 1997067718.193.09$2,091
Oct 1997099219.253.15$3,125
Sep 1997088017.742.95$2,600
Aug 1997091417.862.55$2,335
Jul 1997095417.582.25$2,144
Jun 1997094017.242.26$2,122
May 199701,23918.972.31$2,860
Apr 1997088917.882.08$1,852
Mar 1997062318.951.94$1,208
Feb 1997078520.492.21$1,732
Jan 1997074223.483.54$2,626
Dec 1996077423.32$0
Nov 1996087521.97$0
Oct 1996080223.31$0
Sep 1996095722.22$0
Aug 1996095020.26$0
Jul 1996096919.55$0
Jun 199601,05218.73$0
May 199601,06719.43$0
Apr 199601,21021.51$0
Mar 199601,14319.38$0
Feb 1996075116.98$0
Jan 199601,00817.07$0
Dec 1995069917.19$0
Nov 199501,14416.00$0
Oct 199501,00615.43$0
Sep 1995092216.18$0
Aug 1995098215.92$0
Jul 1995061615.24$0
Jun 199501,13016.41$0
May 199501,45917.56$0
Apr 199501,38317.73$0
Mar 1995089516.44$0
Feb 1995073416.58$0
Jan 1995074115.92$0
Dec 1994088215.03$0
Nov 199401,02815.90$0
Oct 1994094815.58$0
Sep 199401,17915.29$0
Aug 1994096616.13$0
Jul 1994096117.56$0
Jun 199401,07617.09$0
May 199401,10415.88$0
Apr 199401,18914.14$0
Mar 199401,16912.46$0
Feb 1994085812.50$0
Jan 1994081412.66$0
Dec 1993075412.33$0
Nov 1993087414.49$0
Oct 1993054015.85$0
Sep 1993096715.03$0
Aug 1993097515.66$0
Jul 1993095815.46$0
Jun 1993075216.79$0
May 1993090117.68$0
Apr 199301,02518.05$0
Mar 1993078818.14$0
Feb 1993081417.90$0
Jan 1993077216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   92 Mcf  × $  3.05 =       $280

────────────────────────────────────────────────────
Month total                                     $280

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/102035 is the state's own key, not one this site invented.