Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 76562District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$334 k
Jan 1993 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition20 bbl$1,416
GasProduction92,474 Mcf$332,147
Total$333,563

15,660 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5112, -101.4254. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.51122, -101.42539 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,110 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,110 ft.

Completions filed
Apr 1978
1 of 1 wells

1 well

42-1053186717,110 ftApr 1978

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026183106.413.05$359
Apr 2026212298.932.87$548
Mar 20261089.753.15$90
Feb 202639363.503.75$539
Jan 202618359.138.00$723
Dec 2025110056.664.41$498
Nov 2025110758.593.93$479
Oct 202517659.383.30$311
Sep 2025010562.743.08$323
Aug 202518963.933.01$332
Jul 202517366.743.32$309
Jun 2025111166.483.13$414
May 2025112260.553.23$455
Apr 2025111662.363.54$473
Mar 2025211767.704.27$635
Feb 2025213370.884.34$719
Jan 20250074.324.28$0
Dec 2024011968.993.12$371
Nov 2024011969.052.20$262
Oct 2024012471.372.28$283
Sep 2024011369.612.36$267
Aug 2024013075.632.06$268
Jul 2024012279.932.15$262
Jun 2024012478.082.63$327
May 2024010478.812.20$229
Apr 2024010484.451.66$173
Mar 2024011980.301.55$184
Feb 2024011776.091.78$209
Jan 2024012873.023.30$422
Dec 2023011571.262.61$300
Nov 2023010177.892.81$284
Oct 2023011985.443.09$367
Sep 2023011889.042.74$323
Aug 2023010780.522.67$286
Jul 2023013274.852.64$349
Jun 2023012068.962.26$271
May 2023010370.622.23$229
Apr 2023011278.122.24$251
Mar 2023013072.852.39$311
Feb 2023012475.112.47$306
Jan 2023013076.533.39$440
Dec 2022013076.415.73$745
Nov 202207885.005.65$440
Oct 2022013387.185.86$780
Sep 202209384.888.16$759
Aug 202209894.529.13$894
Jul 20220111101.587.54$837
Jun 20220136115.097.98$1,085
May 20220131109.378.43$1,105
Apr 20220126104.226.84$862
Mar 20220134108.885.08$680
Feb 2022013391.054.86$646
Jan 2022014181.844.54$640
Dec 202107171.323.90$277
Nov 202103577.435.24$183
Oct 2021015079.795.71$857
Sep 20210269.865.35$11
Aug 202108366.024.22$350
Jul 2021014170.783.98$561
Jun 2021015269.493.38$514
May 2021010563.483.02$317
Apr 2021014860.362.76$408
Mar 2021016661.302.72$451
Feb 2021017057.805.55$943
Jan 2021011850.412.81$332
Dec 202004644.642.68$123
Nov 202004938.772.71$133
Oct 202005136.972.48$126
Sep 202004437.091.99$88
Aug 202004939.982.39$117
Jul 202004938.371.83$89
Jun 202004934.901.69$83
May 202005116.921.81$93
Apr 202005714.751.80$103
Mar 202007430.341.86$137
Feb 202004049.881.98$79
Jan 2020010457.252.09$218
Dec 2019017259.012.30$396
Nov 2019016555.302.75$454
Oct 2019014353.472.42$346
Sep 2019015755.052.66$417
Aug 2019016553.112.30$380
Jul 2019016256.272.46$399
Jun 2019014452.782.49$359
May 2019017058.482.74$466
Apr 2019016162.632.75$443
Mar 2019016756.803.06$511
Feb 2019015150.852.79$422
Jan 2019017046.033.23$549
Dec 2018016746.594.19$699
Nov 2018015752.934.24$665
Oct 2018016361.443.40$554
Sep 2018016059.543.11$497
Aug 2018014159.403.07$432
Jul 2018017065.142.93$498
Jun 2018016860.183.08$517
May 2018017265.382.90$499
Apr 2018017063.842.90$493
Mar 2018017561.222.79$488
Feb 2018015561.782.77$429
Jan 2018017662.874.01$706
Dec 2017018057.272.92$526
Nov 2017022555.423.12$702
Oct 2017023649.292.98$704
Sep 2017023547.523.09$726
Aug 2017024445.373.00$733
Jul 2017024743.873.09$763
Jun 2017024342.493.09$750
May 2017025445.373.26$829
Apr 2017023947.933.21$768
Mar 2017025946.772.98$773
Feb 2017023650.452.95$697
Jan 2017020849.413.42$711
Dec 2016023248.763.72$864
Nov 2016029842.492.64$788
Oct 2016046646.193.09$1,440
Sep 2016010941.553.10$338
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 201602936.561.99$58
Mar 2016021233.011.79$380
Feb 2016019426.472.06$400
Jan 2016010027.352.36$236
Dec 2015019832.362.00$396
Nov 2015018738.792.17$405
Oct 2015019343.552.43$468
Sep 2015023442.992.76$645
Aug 2015021140.162.87$606
Jul 2015021648.152.95$636
Jun 2015021456.152.88$617
May 2015023255.212.96$686
Apr 2015021749.822.71$587
Mar 2015024242.892.93$710
Feb 2015019744.662.98$586
Jan 2015021943.433.10$679
Dec 2014022954.693.59$822
Nov 2014021170.464.25$897
Oct 2014024078.303.90$936
Sep 2014022686.164.05$914
Aug 2014024589.394.04$989
Jul 2014026096.564.18$1,087
Jun 2014024498.164.74$1,156
May 2014024294.734.73$1,144
Apr 2014026195.944.81$1,255
Mar 2014022795.895.06$1,148
Feb 2014026597.406.19$1,641
Jan 2014025590.404.86$1,239
Dec 2013024491.824.35$1,062
Nov 2013024488.853.74$912
Oct 2013025597.423.78$964
Sep 20130240104.113.72$892
Aug 20130263104.253.52$926
Jul 20130262102.523.72$974
Jun 2013025194.403.93$987
May 2013020094.834.15$830
Apr 2013025793.964.28$1,101
Mar 2013019293.623.91$751
Feb 2013022891.233.42$780
Jan 2013036191.603.42$1,235
Dec 201208186.773.42$277
Nov 2012024586.953.62$888
Oct 2012026489.383.40$898
Sep 2012024294.672.92$706
Aug 2012020092.662.91$582
Jul 2012021085.133.02$634
Jun 2012019879.822.52$499
May 2012019591.612.49$485
Apr 20120193101.652.00$385
Mar 20120206105.052.22$458
Feb 20120184101.102.57$473
Jan 2012020998.092.73$571
Dec 2011023596.873.24$761
Nov 2011020795.723.31$685
Oct 2011022184.983.65$806
Sep 2011021083.623.99$837
Aug 2011021983.404.15$909
Jul 2011022794.144.52$1,025
Jun 2011022992.904.64$1,063
May 2011024298.134.40$1,066
Apr 20110202105.964.33$875
Mar 2011024696.364.06$998
Feb 2011021485.644.18$895
Jan 2011022986.504.59$1,051
Dec 2010025785.734.35$1,117
Nov 2010023480.843.80$888
Oct 2010023778.103.51$832
Sep 2010023972.633.98$951
Aug 2010026273.684.42$1,158
Jul 2010022872.554.74$1,080
Jun 2010019270.364.91$943
May 2010017771.124.24$750
Apr 2010016181.694.12$664
Mar 2010018278.394.39$799
Feb 2010017173.585.44$931
Jan 2010018174.365.96$1,080
Dec 2009017571.445.48$960
Nov 2009017874.593.75$668
Oct 2009017772.544.11$728
Sep 2009017865.543.06$546
Aug 2009019167.423.22$615
Jul 2009017761.133.46$613
Jun 2009017466.163.90$678
May 2009018954.743.93$742
Apr 2009019546.773.59$700
Mar 2009017242.144.06$698
Feb 2009014732.814.63$681
Jan 2009013835.865.37$741
Dec 2008015637.105.98$932
Nov 2008014455.496.86$988
Oct 2008016075.246.92$1,108
Sep 20080135101.767.88$1,063
Aug 20080121114.228.48$1,026
Jul 20080236131.0811.39$2,688
Jun 20080223131.3313.03$2,906
May 20080219123.1711.57$2,535
Apr 20080211110.3110.45$2,206
Mar 20080224101.909.66$2,165
Feb 2008024792.538.77$2,166
Jan 2008025190.388.21$2,060
Dec 2007027788.337.30$2,023
Nov 2007022391.677.29$1,626
Oct 2007022382.856.92$1,544
Sep 2007022275.846.24$1,386
Aug 2007022869.066.39$1,456
Jul 2007033770.906.39$2,153
Jun 2007030262.007.55$2,280
May 2007030758.747.85$2,409
Apr 2007026159.617.81$2,037
Mar 2007035856.927.30$2,614
Feb 2007029355.108.22$2,407
Jan 2007033450.306.73$2,247
Dec 2006038356.656.92$2,650
Nov 2006037554.207.62$2,857
Oct 2006042654.906.01$2,562
Sep 2006042160.085.04$2,121
Aug 2006037168.717.34$2,723
Jul 2006033669.376.34$2,131
Jun 2006037066.286.38$2,362
May 2006039766.016.42$2,551
Apr 2006031564.397.36$2,319
Mar 2006026756.707.08$1,891
Feb 2006025657.597.75$1,984
Jan 2006028960.598.93$2,582
Dec 2005028154.9413.42$3,770
Nov 2005025554.6910.59$2,700
Oct 2005024558.3413.80$3,380
Sep 2005022461.4512.08$2,706
Aug 2005022361.519.80$2,185
Jul 2005024855.697.84$1,945
Jun 2005024352.337.38$1,794
May 2005019845.226.65$1,317
Apr 2005021049.207.36$1,546
Mar 2005023850.377.15$1,703
Feb 2005020645.226.31$1,300
Jan 2005022343.166.32$1,410
Dec 2004024539.866.75$1,654
Nov 2004026245.286.33$1,659
Oct 2004022249.706.52$1,446
Sep 2004020743.245.28$1,094
Aug 2004021842.375.55$1,210
Jul 2004021038.286.08$1,278
Jun 2004022036.106.43$1,415
May 2004025337.486.49$1,643
Apr 2004023634.475.86$1,383
Mar 2004024634.365.53$1,360
Feb 2004026132.455.51$1,438
Jan 2004024832.036.30$1,562
Dec 2003023830.266.30$1,500
Nov 2003024328.804.60$1,117
Oct 2003026428.174.76$1,257
Sep 2003023926.314.75$1,135
Aug 2003024529.765.13$1,257
Jul 2003021329.415.17$1,101
Jun 2003020928.565.98$1,250
May 2003010626.595.97$633
Apr 2003015526.675.41$838
Mar 2003024031.146.10$1,463
Feb 2003022033.487.93$1,744
Jan 2003021530.315.58$1,200
Dec 2002019426.914.85$942
Nov 2002022524.664.14$931
Oct 2002029026.464.23$1,226
Sep 2002023427.443.64$851
Aug 2002028425.963.16$899
Jul 2002027224.583.06$833
Jun 2002037323.733.34$1,245
May 2002035824.663.58$1,283
Apr 2002035423.653.51$1,243
Mar 2002039022.003.10$1,210
Feb 2002036318.222.38$862
Jan 2002046217.172.38$1,098
Dec 2001043516.932.36$1,029
Nov 2001040018.072.41$962
Oct 2001042419.782.53$1,072
Sep 2001036124.262.25$813
Aug 2001036524.873.05$1,114
Jul 2001040223.933.20$1,285
Jun 2001036024.563.82$1,377
May 2001039325.524.31$1,693
Apr 2001034024.685.34$1,814
Mar 2001040524.545.38$2,177
Feb 2001032027.755.77$1,845
Jan 2001032027.478.40$2,688
Dec 2000038826.889.12$3,540
Nov 2000030432.215.66$1,720
Oct 2000039631.235.15$2,038
Sep 2000034231.875.19$1,774
Aug 2000035929.644.54$1,630
Jul 2000036028.534.09$1,472
Jun 2000034329.304.40$1,508
May 2000040027.263.68$1,472
Apr 2000039724.513.12$1,237
Mar 2000035028.422.86$1,001
Feb 2000031827.622.73$867
Jan 2000035525.272.48$881
Dec 1999036024.282.42$873
Nov 1999025723.192.43$626
Oct 1999034320.982.80$962
Sep 1999025921.752.62$678
Aug 1999031519.262.88$906
Jul 1999031517.892.37$747
Jun 1999031915.942.36$754
May 1999039115.792.32$908
Apr 1999036015.102.21$795
Mar 1999041512.471.84$763
Feb 199903499.981.82$634
Jan 1999048410.381.90$920
Dec 199803289.201.77$582
Nov 1998019710.892.19$431
Oct 199806812.421.97$134
Sep 199808812.592.08$183
Aug 1998028811.301.91$549
Jul 1998033811.742.24$756
Jun 1998029311.242.24$656
May 1998041412.622.21$913
Apr 1998036413.042.51$912
Mar 1998039112.802.31$903
Feb 1998035513.952.30$816
Jan 1998041614.702.15$896
Dec 1997042916.322.41$1,034
Nov 1997034218.193.09$1,056
Oct 1997033419.253.15$1,052
Sep 1997039817.742.95$1,176
Aug 1997053017.862.55$1,354
Jul 1997037317.582.25$838
Jun 1997031217.242.26$704
May 1997027518.972.31$635
Apr 1997027117.882.08$564
Mar 1997029718.951.94$576
Feb 1997017920.492.21$395
Jan 1997028323.483.54$1,002
Dec 1996041523.32$0
Nov 1996033021.97$0
Oct 1996039523.31$0
Sep 1996036122.22$0
Aug 1996039620.26$0
Jul 1996069419.55$0
Jun 1996038418.73$0
May 1996055519.43$0
Apr 1996051421.51$0
Mar 1996040619.38$0
Feb 1996074416.98$0
Jan 1996041917.07$0
Dec 1995040617.19$0
Nov 1995032116.00$0
Oct 1995028315.43$0
Sep 1995026816.18$0
Aug 1995028615.92$0
Jul 1995034515.24$0
Jun 1995023816.41$0
May 1995040817.56$0
Apr 1995030017.73$0
Mar 1995032516.44$0
Feb 1995025816.58$0
Jan 1995035015.92$0
Dec 1994030815.03$0
Nov 1994031515.90$0
Oct 1994039615.58$0
Sep 1994037415.29$0
Aug 1994023416.13$0
Jul 1994021317.56$0
Jun 1994017617.09$0
May 1994022415.88$0
Apr 1994020214.14$0
Mar 1994026712.46$0
Feb 1994019112.50$0
Jan 1994016812.66$0
Dec 1993028212.33$0
Nov 1993032414.49$0
Oct 1993034815.85$0
Sep 1993022215.03$0
Aug 1993024515.66$0
Jul 1993028715.46$0
Jun 1993019716.79$0
May 1993012917.68$0
Apr 1993032418.05$0
Mar 1993024418.14$0
Feb 1993025117.90$0
Jan 1993033816.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                   83 Mcf  × $  3.05 =       $253

────────────────────────────────────────────────────
Month total                                     $359

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/76562 is the state's own key, not one this site invented.