CHILDRESS, C. "7"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 151513District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$717 k
Sep 1994 – May 2026
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
381
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-01-19131392
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition31 bbl$1,977
GasProduction207,305 Mcf$714,748
Total$716,725

37,578 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4214, -101.4302. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42138, -101.43020 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,610 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,610 ft.

Completions filed
Sep 1994
1 of 1 wells

1 well

42-1053655446,610 ftSep 1994

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (381)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

381 months

May 20260295106.413.05$899
Apr 2026123598.932.87$773
Mar 20260089.753.15$0
Feb 2026225363.503.75$1,076
Jan 2026226859.138.00$2,262
Dec 2025218856.664.41$943
Nov 2025214958.593.93$702
Oct 2025224759.383.30$935
Sep 2025127662.743.08$912
Aug 2025331763.933.01$1,147
Jul 2025232866.743.32$1,221
Jun 2025233866.483.13$1,190
May 2025433860.553.23$1,335
Apr 2025433462.363.54$1,433
Mar 2025433367.704.27$1,692
Feb 20250470.884.34$17
Jan 20250074.324.28$0
Dec 20240568.993.12$16
Nov 2024021269.052.20$466
Oct 2024025571.372.28$582
Sep 2024018769.612.36$442
Aug 2024022875.632.06$471
Jul 2024024179.932.15$517
Jun 2024022478.082.63$590
May 2024023878.812.20$523
Apr 2024024884.451.66$411
Mar 2024025580.301.55$394
Feb 2024024776.091.78$441
Jan 2024024573.023.30$808
Dec 2023025671.262.61$668
Nov 2023026477.892.81$741
Oct 2023026585.443.09$818
Sep 2023025689.042.74$700
Aug 2023026880.522.67$716
Jul 2023026974.852.64$711
Jun 2023027168.962.26$612
May 2023027970.622.23$621
Apr 2023026778.122.24$597
Mar 2023027572.852.39$658
Feb 2023024875.112.47$611
Jan 2023027576.533.39$932
Dec 2022024676.415.73$1,409
Nov 2022027385.005.65$1,541
Oct 2022029987.185.86$1,753
Sep 2022030784.888.16$2,506
Aug 2022032094.529.13$2,921
Jul 20220278101.587.54$2,097
Jun 20220272115.097.98$2,170
May 20220289109.378.43$2,437
Apr 20220274104.226.84$1,874
Mar 20220301108.885.08$1,528
Feb 2022017191.054.86$831
Jan 2022016281.844.54$735
Dec 2021027571.323.90$1,072
Nov 2021025877.435.24$1,351
Oct 2021026579.795.71$1,514
Sep 2021024569.865.35$1,311
Aug 2021016566.024.22$696
Jul 2021028570.783.98$1,135
Jun 2021026369.493.38$889
May 2021023763.483.02$715
Apr 2021023460.362.76$645
Mar 2021041561.302.72$1,128
Feb 202109357.805.55$516
Jan 2021024550.412.81$689
Dec 2020018344.642.68$490
Nov 2020019738.772.71$533
Oct 2020021036.972.48$520
Sep 2020017937.091.99$356
Aug 2020019739.982.39$470
Jul 2020020038.371.83$365
Jun 2020019934.901.69$336
May 2020021016.921.81$381
Apr 2020023314.751.80$420
Mar 2020023930.341.86$444
Feb 2020022649.881.98$448
Jan 2020025257.252.09$528
Dec 2019024559.012.30$565
Nov 2019023655.302.75$649
Oct 2019024553.472.42$593
Sep 2019026155.052.66$694
Aug 2019028353.112.30$652
Jul 2019030056.272.46$738
Jun 2019029952.782.49$745
May 2019033358.482.74$913
Apr 2019025862.632.75$710
Mar 2019023156.803.06$707
Feb 2019022550.852.79$628
Jan 2019025246.033.23$814
Dec 2018030546.594.19$1,277
Nov 2018032352.934.24$1,369
Oct 2018024261.443.40$822
Sep 2018029059.543.11$901
Aug 2018034459.403.07$1,055
Jul 2018035365.142.93$1,035
Jun 2018033460.183.08$1,028
May 2018035465.382.90$1,027
Apr 2018037063.842.90$1,073
Mar 2018042661.222.79$1,187
Feb 2018060261.782.77$1,665
Jan 2018075662.874.01$3,031
Dec 2017049157.272.92$1,434
Nov 2017045055.423.12$1,403
Oct 2017041249.292.98$1,229
Sep 2017037847.523.09$1,167
Aug 2017037045.373.00$1,112
Jul 2017035943.873.09$1,108
Jun 2017034842.493.09$1,074
May 2017036945.373.26$1,204
Apr 2017038247.933.21$1,227
Mar 2017038046.772.98$1,134
Feb 2017035950.452.95$1,060
Jan 2017043549.413.42$1,487
Dec 2016035448.763.72$1,318
Nov 2016018742.492.64$494
Oct 2016020246.193.09$624
Sep 2016020041.553.10$620
Aug 2016023241.442.92$678
Jul 2016026141.622.92$763
Jun 2016020045.352.69$537
May 2016032242.521.99$641
Apr 2016045436.561.99$904
Mar 2016021033.011.79$377
Feb 2016032026.472.06$660
Jan 2016039127.352.36$924
Dec 2015039332.362.00$787
Nov 2015035238.792.17$763
Oct 2015041243.552.43$1,000
Sep 2015047742.992.76$1,316
Aug 2015051640.162.87$1,482
Jul 2015039548.152.95$1,163
Jun 2015032856.152.88$946
May 2015033355.212.96$984
Apr 2015031749.822.71$858
Mar 2015031542.892.93$924
Feb 2015024444.662.98$726
Jan 2015027643.433.10$856
Dec 2014029054.693.59$1,041
Nov 2014029570.464.25$1,254
Oct 2014031778.303.90$1,237
Sep 2014031686.164.05$1,278
Aug 2014034089.394.04$1,372
Jul 2014034696.564.18$1,446
Jun 2014034298.164.74$1,620
May 2014035394.734.73$1,668
Apr 2014035795.944.81$1,717
Mar 2014034095.895.06$1,719
Feb 2014030897.406.19$1,907
Jan 2014033090.404.86$1,604
Dec 2013033891.824.35$1,472
Nov 2013034188.853.74$1,275
Oct 2013039897.423.78$1,504
Sep 20130384104.113.72$1,428
Aug 20130359104.253.52$1,265
Jul 20130367102.523.72$1,364
Jun 2013038494.403.93$1,510
May 2013034094.834.15$1,411
Apr 2013038993.964.28$1,666
Mar 2013031893.623.91$1,244
Feb 2013034991.233.42$1,194
Jan 2013037091.603.42$1,265
Dec 2012038286.773.42$1,307
Nov 2012032986.953.62$1,193
Oct 2012042089.383.40$1,428
Sep 2012042294.672.92$1,232
Aug 2012045192.662.91$1,312
Jul 2012045685.133.02$1,377
Jun 2012044879.822.52$1,129
May 2012046091.612.49$1,145
Apr 20120450101.652.00$899
Mar 20120475105.052.22$1,055
Feb 20120437101.102.57$1,123
Jan 2012045498.092.73$1,241
Dec 2011041596.873.24$1,344
Nov 2011046095.723.31$1,523
Oct 2011048384.983.65$1,762
Sep 2011048683.623.99$1,937
Aug 2011047583.404.15$1,971
Jul 2011052194.144.52$2,353
Jun 2011045692.904.64$2,116
May 2011050798.134.40$2,233
Apr 20110407105.964.33$1,764
Mar 2011048696.364.06$1,972
Feb 2011049385.644.18$2,061
Jan 2011051186.504.59$2,345
Dec 2010054685.734.35$2,374
Nov 2010057880.843.80$2,194
Oct 2010056878.103.51$1,993
Sep 2010043672.633.98$1,735
Aug 2010052073.684.42$2,298
Jul 2010052372.554.74$2,477
Jun 2010052670.364.91$2,583
May 2010065671.124.24$2,778
Apr 2010031481.694.12$1,295
Mar 2010056878.394.39$2,493
Feb 2010052673.585.44$2,863
Jan 2010062374.365.96$3,716
Dec 2009069471.445.48$3,806
Nov 2009027174.593.75$1,017
Oct 2009074972.544.11$3,079
Sep 2009072465.543.06$2,219
Aug 2009046967.423.22$1,509
Jul 2009045061.133.46$1,559
Jun 2009068266.163.90$2,656
May 2009061854.743.93$2,426
Apr 2009050546.773.59$1,812
Mar 2009048142.144.06$1,952
Feb 2009035332.814.63$1,635
Jan 2009035135.865.37$1,885
Dec 2008040137.105.98$2,397
Nov 2008053255.496.86$3,650
Oct 2008052075.246.92$3,599
Sep 20080284101.767.88$2,237
Aug 20080478114.228.48$4,055
Jul 20080422131.0811.39$4,806
Jun 20080428131.3313.03$5,578
May 20080432123.1711.57$5,000
Apr 20080528110.3110.45$5,520
Mar 20080568101.909.66$5,489
Feb 2008052892.538.77$4,631
Jan 2008048990.388.21$4,013
Dec 2007056188.337.30$4,096
Nov 2007032091.677.29$2,333
Oct 2007049582.856.92$3,426
Sep 2007050375.846.24$3,141
Aug 2007028069.066.39$1,789
Jul 2007057070.906.39$3,641
Jun 2007058362.007.55$4,401
May 2007053158.747.85$4,166
Apr 2007055859.617.81$4,355
Mar 2007066056.927.30$4,819
Feb 2007048055.108.22$3,944
Jan 2007059650.306.73$4,009
Dec 2006071456.656.92$4,940
Nov 2006036654.207.62$2,788
Oct 2006033754.906.01$2,027
Sep 2006024060.085.04$1,209
Aug 2006029468.717.34$2,158
Jul 2006050769.376.34$3,216
Jun 2006053466.286.38$3,409
May 2006061566.016.42$3,951
Apr 2006052764.397.36$3,879
Mar 2006050956.707.08$3,605
Feb 2006021657.597.75$1,674
Jan 2006049660.598.93$4,431
Dec 2005045254.9413.42$6,064
Nov 2005013654.6910.59$1,440
Oct 20050858.3413.80$110
Sep 2005052761.4512.08$6,366
Aug 2005064961.519.80$6,358
Jul 2005059155.697.84$4,636
Jun 2005057252.337.38$4,222
May 2005058145.226.65$3,864
Apr 2005062049.207.36$4,564
Mar 2005035950.377.15$2,569
Feb 2005068345.226.31$4,311
Jan 2005042343.166.32$2,674
Dec 2004069239.866.75$4,672
Nov 2004059245.286.33$3,748
Oct 2004060249.706.52$3,922
Sep 2004059443.245.28$3,139
Aug 2004073342.375.55$4,069
Jul 2004066438.286.08$4,040
Jun 2004059936.106.43$3,853
May 2004061437.486.49$3,988
Apr 2004058734.475.86$3,439
Mar 2004064334.365.53$3,556
Feb 2004073332.455.51$4,039
Jan 2004068932.036.30$4,340
Dec 2003082930.266.30$5,224
Nov 2003081028.804.60$3,722
Oct 2003070728.174.76$3,365
Sep 2003061226.314.75$2,907
Aug 2003056329.765.13$2,888
Jul 2003067529.415.17$3,490
Jun 2003068228.565.98$4,080
May 2003070526.595.97$4,211
Apr 2003065826.675.41$3,558
Mar 2003076731.146.10$4,676
Feb 2003065433.487.93$5,184
Jan 2003083030.315.58$4,633
Dec 2002074226.914.85$3,601
Nov 2002075024.664.14$3,103
Oct 2002068626.464.23$2,901
Sep 2002068627.443.64$2,494
Aug 2002065525.963.16$2,073
Jul 2002071624.583.06$2,192
Jun 2002067823.733.34$2,263
May 2002073724.663.58$2,641
Apr 2002070723.653.51$2,483
Mar 2002083222.003.10$2,581
Feb 2002058318.222.38$1,385
Jan 2002059217.172.38$1,406
Dec 2001068116.932.36$1,610
Nov 2001076318.072.41$1,835
Oct 2001072419.782.53$1,831
Sep 2001066124.262.25$1,488
Aug 2001075424.873.05$2,302
Jul 2001077423.933.20$2,475
Jun 2001082224.563.82$3,143
May 2001091525.524.31$3,941
Apr 2001089324.685.34$4,764
Mar 200101,10224.545.38$5,925
Feb 2001049227.755.77$2,837
Jan 2001083527.478.40$7,013
Dec 2000076926.889.12$7,015
Nov 2000079332.215.66$4,487
Oct 2000088031.235.15$4,528
Sep 2000076031.875.19$3,942
Aug 2000084029.644.54$3,814
Jul 2000076228.534.09$3,116
Jun 2000061829.304.40$2,718
May 2000092627.263.68$3,407
Apr 2000083324.513.12$2,596
Mar 2000071928.422.86$2,056
Feb 2000076927.622.73$2,097
Jan 2000093625.272.48$2,322
Dec 1999094024.282.42$2,278
Nov 1999093823.192.43$2,283
Oct 1999098520.982.80$2,762
Sep 1999067021.752.62$1,755
Aug 1999091319.262.88$2,625
Jul 1999076517.892.37$1,815
Jun 1999080715.942.36$1,906
May 1999090815.792.32$2,107
Apr 1999091715.102.21$2,025
Mar 199901,11612.471.84$2,052
Feb 199908679.981.82$1,576
Jan 1999092210.381.90$1,752
Dec 199808229.201.77$1,458
Nov 1998083410.892.19$1,823
Oct 1998099212.421.97$1,953
Sep 1998079412.592.08$1,654
Aug 1998094511.301.91$1,802
Jul 1998087711.742.24$1,962
Jun 1998099411.242.24$2,224
May 199801,27912.622.21$2,822
Apr 1998017013.042.51$426
Mar 1998017912.802.31$413
Feb 1998063613.952.30$1,462
Jan 1998087014.702.15$1,875
Dec 1997091116.322.41$2,197
Nov 1997083918.193.09$2,591
Oct 1997092719.253.15$2,920
Sep 199701,10217.742.95$3,256
Aug 199701,13517.862.55$2,900
Jul 199701,05217.582.25$2,364
Jun 1997094917.242.26$2,142
May 199701,06118.972.31$2,449
Apr 199701,06017.882.08$2,208
Mar 199701,30018.951.94$2,521
Feb 199701,17320.492.21$2,588
Jan 199701,20123.483.54$4,251
Dec 199601,39023.32$0
Nov 199601,49021.97$0
Oct 199601,56123.31$0
Sep 199601,66922.22$0
Aug 199601,71920.26$0
Jul 199601,71719.55$0
Jun 199601,76318.73$0
May 199601,80919.43$0
Apr 199601,83921.51$0
Mar 199601,94719.38$0
Feb 199601,54616.98$0
Jan 199601,74517.07$0
Dec 199501,97717.19$0
Nov 199501,43216.00$0
Oct 199501,93815.43$0
Sep 199502,03116.18$0
Aug 199502,11515.92$0
Jul 199502,21615.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 199405,59615.58$0
Sep 199407815.29$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  295 Mcf  × $  3.05 =       $899

────────────────────────────────────────────────────
Month total                                     $899

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/151513 is the state's own key, not one this site invented.