CHILDRESS "8"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 79761District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$509 k
Jan 1993 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9 bbl$567
GasProduction177,788 Mcf$508,676
Total$509,242

64,786 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4248, -101.4245. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42476, -101.42450 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,600 ft.

Completions filed
Nov 1978
1 of 1 wells

1 well

42-1053189716,600 ftNov 1978

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026090106.413.05$274
Apr 202607898.932.87$224
Mar 20260089.753.15$0
Feb 202605263.503.75$195
Jan 202617359.138.00$643
Dec 202517456.664.41$383
Nov 202517858.593.93$365
Oct 202508659.383.30$284
Sep 202506162.743.08$188
Aug 202516063.933.01$245
Jul 202518666.743.32$352
Jun 202505566.483.13$172
May 202515560.553.23$238
Apr 202514862.363.54$232
Mar 202514767.704.27$268
Feb 202514270.884.34$253
Jan 20250074.324.28$0
Dec 202404068.993.12$125
Nov 202405569.052.20$121
Oct 202406871.372.28$155
Sep 202407569.612.36$177
Aug 202408475.632.06$173
Jul 202407879.932.15$167
Jun 202406578.082.63$171
May 202407878.812.20$171
Apr 202407784.451.66$128
Mar 202407680.301.55$117
Feb 202406676.091.78$118
Jan 202406373.023.30$208
Dec 202306471.262.61$167
Nov 202306977.892.81$194
Oct 202307785.443.09$238
Sep 202308489.042.74$230
Aug 202309780.522.67$259
Jul 2023010874.852.64$285
Jun 202305868.962.26$131
May 202309370.622.23$207
Apr 202308978.122.24$199
Mar 202309072.852.39$215
Feb 2023010775.112.47$264
Jan 202306376.533.39$213
Dec 202206676.415.73$378
Nov 202206685.005.65$373
Oct 202207787.185.86$452
Sep 202207084.888.16$571
Aug 202207394.529.13$666
Jul 2022094101.587.54$709
Jun 2022097115.097.98$774
May 20220101109.378.43$852
Apr 2022098104.226.84$670
Mar 20220114108.885.08$579
Feb 2022015391.054.86$743
Jan 2022011181.844.54$504
Dec 2021012671.323.90$491
Nov 2021012977.435.24$676
Oct 2021010879.795.71$617
Sep 2021012369.865.35$658
Aug 2021012366.024.22$519
Jul 2021011370.783.98$450
Jun 2021015169.493.38$510
May 202108063.483.02$241
Apr 2021011660.362.76$320
Mar 2021014161.302.72$383
Feb 2021014557.805.55$804
Jan 2021012650.412.81$354
Dec 2020021744.642.68$581
Nov 2020023338.772.71$631
Oct 2020024736.972.48$612
Sep 2020021137.091.99$420
Aug 2020023339.982.39$556
Jul 2020023638.371.83$431
Jun 2020023634.901.69$399
May 2020024916.921.81$452
Apr 2020027514.751.80$496
Mar 2020026930.341.86$499
Feb 2020028249.881.98$559
Jan 2020025857.252.09$540
Dec 2019037859.012.30$871
Nov 2019036255.302.75$996
Oct 2019031353.472.42$757
Sep 2019035555.052.66$943
Aug 2019034753.112.30$800
Jul 2019033756.272.46$829
Jun 2019035952.782.49$894
May 2019038058.482.74$1,041
Apr 2019036162.632.75$993
Mar 2019034156.803.06$1,044
Feb 2019018850.852.79$525
Jan 2019021246.033.23$684
Dec 2018022446.594.19$938
Nov 2018019852.934.24$839
Oct 2018020861.443.40$707
Sep 2018028159.543.11$873
Aug 2018016159.403.07$494
Jul 2018022265.142.93$651
Jun 2018024160.183.08$742
May 2018025065.382.90$725
Apr 2018024163.842.90$699
Mar 2018028761.222.79$800
Feb 2018030461.782.77$841
Jan 2018034562.874.01$1,383
Dec 2017033757.272.92$985
Nov 2017030955.423.12$964
Oct 2017037049.292.98$1,104
Sep 2017031147.523.09$960
Aug 2017040345.373.00$1,211
Jul 2017046443.873.09$1,433
Jun 2017046442.493.09$1,433
May 2017037245.373.26$1,214
Apr 2017017547.933.21$562
Mar 201705746.772.98$170
Feb 201707350.452.95$216
Jan 201708249.413.42$280
Dec 201609048.763.72$335
Nov 2016013242.492.64$349
Oct 2016014546.193.09$448
Sep 2016014541.553.10$450
Aug 2016014041.442.92$409
Jul 2016014041.622.92$409
Jun 2016014045.352.69$376
May 2016016242.521.99$323
Apr 2016016236.561.99$323
Mar 201606533.011.79$117
Feb 2016011526.472.06$237
Jan 2016013727.352.36$324
Dec 2015013132.362.00$262
Nov 2015012538.792.17$271
Oct 2015012843.552.43$311
Sep 2015011042.992.76$303
Aug 2015010440.162.87$299
Jul 2015011048.152.95$324
Jun 2015010956.152.88$314
May 2015011755.212.96$346
Apr 2015013549.822.71$365
Mar 2015014342.892.93$420
Feb 2015013544.662.98$402
Jan 2015013643.433.10$422
Dec 2014013754.693.59$492
Nov 2014012470.464.25$527
Oct 2014013078.303.90$507
Sep 2014013186.164.05$530
Aug 2014013689.394.04$549
Jul 2014013596.564.18$564
Jun 2014013198.164.74$621
May 2014014194.734.73$666
Apr 2014014795.944.81$707
Mar 2014013395.895.06$673
Feb 2014013397.406.19$824
Jan 2014014790.404.86$715
Dec 2013014591.824.35$631
Nov 2013014888.853.74$553
Oct 2013014997.423.78$563
Sep 20130146104.113.72$543
Aug 20130155104.253.52$546
Jul 20130159102.523.72$591
Jun 2013017094.403.93$669
May 2013014394.834.15$593
Apr 2013017393.964.28$741
Mar 2013015693.623.91$610
Feb 2013012891.233.42$438
Jan 2013014191.603.42$482
Dec 2012015286.773.42$520
Nov 2012014686.953.62$529
Oct 2012015589.383.40$527
Sep 2012015494.672.92$449
Aug 2012017092.662.91$494
Jul 2012018785.133.02$565
Jun 2012021179.822.52$532
May 2012023691.612.49$587
Apr 20120252101.652.00$503
Mar 20120318105.052.22$707
Feb 20120297101.102.57$763
Jan 2012016698.092.73$454
Dec 2011014396.873.24$463
Nov 2011015195.723.31$500
Oct 2011016284.983.65$591
Sep 2011014783.623.99$586
Aug 2011014883.404.15$614
Jul 2011014994.144.52$673
Jun 2011016492.904.64$761
May 2011018398.134.40$806
Apr 20110177105.964.33$767
Mar 2011021496.364.06$868
Feb 2011031485.644.18$1,313
Jan 2011027086.504.59$1,239
Dec 2010026785.734.35$1,161
Nov 2010022180.843.80$839
Oct 2010017378.103.51$607
Sep 2010016672.633.98$661
Aug 2010018673.684.42$822
Jul 2010018072.554.74$853
Jun 2010014070.364.91$687
May 2010011771.124.24$496
Apr 2010014081.694.12$577
Mar 2010016278.394.39$711
Feb 2010014573.585.44$789
Jan 2010021274.365.96$1,264
Dec 2009020071.445.48$1,097
Nov 200905874.593.75$218
Oct 200904872.544.11$197
Sep 2009010865.543.06$331
Aug 2009016967.423.22$544
Jul 2009015661.133.46$540
Jun 2009018066.163.90$701
May 2009021054.743.93$824
Apr 2009023046.773.59$825
Mar 2009026942.144.06$1,092
Feb 2009032732.814.63$1,515
Jan 200903835.865.37$204
Dec 2008010037.105.98$598
Nov 200803855.496.86$261
Oct 2008013675.246.92$941
Sep 20080149101.767.88$1,174
Aug 20080424114.228.48$3,597
Jul 200801,604131.0811.39$18,269
Jun 20080666131.3313.03$8,680
May 20080701123.1711.57$8,114
Apr 20080670110.3110.45$7,005
Mar 20080583101.909.66$5,634
Feb 200804392.538.77$377
Jan 2008042890.388.21$3,512
Dec 2007043188.337.30$3,147
Nov 2007047791.677.29$3,478
Oct 2007042482.856.92$2,935
Sep 2007040575.846.24$2,529
Aug 2007040269.066.39$2,568
Jul 2007038470.906.39$2,453
Jun 2007044462.007.55$3,352
May 2007052358.747.85$4,104
Apr 2007052359.617.81$4,082
Mar 2007056156.927.30$4,096
Feb 2007052755.108.22$4,330
Jan 2007031250.306.73$2,099
Dec 2006027956.656.92$1,930
Nov 2006028454.207.62$2,163
Oct 2006020454.906.01$1,227
Sep 2006030060.085.04$1,511
Aug 2006029268.717.34$2,143
Jul 2006032669.376.34$2,068
Jun 2006026766.286.38$1,705
May 2006020866.016.42$1,336
Apr 2006028264.397.36$2,076
Mar 2006028256.707.08$1,997
Feb 2006028057.597.75$2,170
Jan 2006057260.598.93$5,110
Dec 2005074254.9413.42$9,954
Nov 2005034254.6910.59$3,621
Oct 2005037558.3413.80$5,173
Sep 2005040661.4512.08$4,904
Aug 2005070861.519.80$6,936
Jul 2005077555.697.84$6,079
Jun 2005081752.337.38$6,030
May 2005063445.226.65$4,217
Apr 2005080949.207.36$5,955
Mar 2005079150.377.15$5,660
Feb 2005074745.226.31$4,715
Jan 2005081943.166.32$5,178
Dec 2004081039.866.75$5,468
Nov 2004095645.286.33$6,052
Oct 2004079749.706.52$5,193
Sep 2004061043.245.28$3,223
Aug 2004035142.375.55$1,948
Jul 2004032238.286.08$1,959
Jun 2004027136.106.43$1,743
May 2004025437.486.49$1,650
Apr 2004023834.475.86$1,394
Mar 2004023634.365.53$1,305
Feb 2004041232.455.51$2,270
Jan 2004040732.036.30$2,564
Dec 2003035030.266.30$2,206
Nov 2003038228.804.60$1,755
Oct 2003038628.174.76$1,837
Sep 2003034826.314.75$1,653
Aug 2003041329.765.13$2,119
Jul 2003022229.415.17$1,148
Jun 2003030828.565.98$1,843
May 2003028626.595.97$1,708
Apr 2003033426.675.41$1,806
Mar 2003046231.146.10$2,816
Feb 2003051433.487.93$4,074
Jan 2003048830.315.58$2,724
Dec 2002050226.914.85$2,437
Nov 2002050224.664.14$2,077
Oct 2002044326.464.23$1,874
Sep 200207,75327.443.64$28,184
Aug 2002062125.963.16$1,965
Jul 2002062624.583.06$1,917
Jun 2002043623.733.34$1,455
May 2002049824.663.58$1,785
Apr 2002050423.653.51$1,770
Mar 2002058822.003.10$1,824
Feb 2002056918.222.38$1,352
Jan 2002059717.172.38$1,418
Dec 2001050816.932.36$1,201
Nov 2001053918.072.41$1,297
Oct 2001044119.782.53$1,115
Sep 2001054924.262.25$1,236
Aug 2001036824.873.05$1,124
Jul 2001040623.933.20$1,298
Jun 2001049024.563.82$1,874
May 2001063425.524.31$2,731
Apr 200101,05724.685.34$5,639
Mar 2001084024.545.38$4,516
Feb 2001069227.755.77$3,991
Jan 2001028427.478.40$2,385
Dec 2000024226.889.12$2,208
Nov 2000019932.215.66$1,126
Oct 2000023531.235.15$1,209
Sep 2000028431.875.19$1,473
Aug 2000022929.644.54$1,040
Jul 2000018828.534.09$769
Jun 2000022629.304.40$994
May 2000023027.263.68$846
Apr 2000016824.513.12$523
Mar 2000030728.422.86$878
Feb 2000032727.622.73$892
Jan 2000035525.272.48$881
Dec 1999047424.282.42$1,149
Nov 1999046423.192.43$1,129
Oct 1999026020.982.80$729
Sep 1999033421.752.62$875
Aug 1999046119.262.88$1,326
Jul 1999037017.892.37$878
Jun 1999053015.942.36$1,252
May 1999058615.792.32$1,360
Apr 1999032215.102.21$711
Mar 1999043912.471.84$807
Feb 199907679.981.82$1,394
Jan 1999094010.381.90$1,786
Dec 199807669.201.77$1,358
Nov 1998063710.892.19$1,392
Oct 1998058012.421.97$1,142
Sep 1998067312.592.08$1,402
Aug 1998080611.301.91$1,537
Jul 1998047911.742.24$1,072
Jun 1998067511.242.24$1,510
May 1998093012.622.21$2,052
Apr 1998077813.042.51$1,949
Mar 199801,01012.802.31$2,333
Feb 1998090813.952.30$2,088
Jan 199801,20814.702.15$2,603
Dec 199701,60016.322.41$3,858
Nov 199701,22518.193.09$3,783
Oct 1997032119.253.15$1,011
Sep 1997055317.742.95$1,634
Aug 1997051017.862.55$1,303
Jul 1997046817.582.25$1,052
Jun 1997044417.242.26$1,002
May 1997042618.972.31$983
Apr 1997049317.882.08$1,027
Mar 1997050418.951.94$977
Feb 1997038920.492.21$858
Jan 1997065223.483.54$2,308
Dec 1996057123.32$0
Nov 1996055021.97$0
Oct 1996056123.31$0
Sep 1996051722.22$0
Aug 1996065620.26$0
Jul 1996062619.55$0
Jun 1996063018.73$0
May 1996063719.43$0
Apr 1996065021.51$0
Mar 1996064819.38$0
Feb 1996060316.98$0
Jan 1996092917.07$0
Dec 1995067217.19$0
Nov 1995066116.00$0
Oct 1995079915.43$0
Sep 1995092816.18$0
Aug 199501,03315.92$0
Jul 199501,19015.24$0
Jun 199501,27416.41$0
May 1995070317.56$0
Apr 1995088817.73$0
Mar 1995093516.44$0
Feb 199501,19116.58$0
Jan 199501,55115.92$0
Dec 199401,78615.03$0
Nov 199402,05215.90$0
Oct 199402,08715.58$0
Sep 199401,17015.29$0
Aug 199401,28516.13$0
Jul 199401,90817.56$0
Jun 199401,62017.09$0
May 199401,53015.88$0
Apr 199401,82114.14$0
Mar 199402,34012.46$0
Feb 199401,95512.50$0
Jan 199401,98312.66$0
Dec 199302,54112.33$0
Nov 199302,09414.49$0
Oct 199302,32115.85$0
Sep 199301,88915.03$0
Aug 199301,83215.66$0
Jul 199301,59315.46$0
Jun 199301,67916.79$0
May 199302,00417.68$0
Apr 199301,90318.05$0
Mar 199302,20318.14$0
Feb 199301,75417.90$0
Jan 199302,03316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   90 Mcf  × $  3.05 =       $274

────────────────────────────────────────────────────
Month total                                     $274

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/79761 is the state's own key, not one this site invented.