HATTON, E.H. ESTATE '12'

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 155259District 7CField 679952002 tax incentive programmesGasSaveExport
Value, all time
$705 k
Jul 1995 – May 2026
Value, last 12 filed months
$275
at the published price for each month
Months reported
371
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111995-09-20132989
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction250,112 Mcf$705,242
Total$705,242

70,419 Mcf of this lease's gas, across 18 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4202, -101.5356. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42016, -101.53559 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,400 ft.

Completions filed
Jul 1995
1 of 1 wells

1 well

42-1053683367,400 ftJul 1995

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (371)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

371 months

May 20267106.413.05$21
Apr 2026698.932.87$17
Mar 2026089.753.15$0
Feb 2026663.503.75$23
Jan 2026659.138.00$48
Dec 2025756.664.41$31
Nov 2025658.593.93$24
Oct 2025759.383.30$23
Sep 2025762.743.08$22
Aug 2025763.933.01$21
Jul 2025866.743.32$27
Jun 2025666.483.13$19
May 2025660.553.23$19
Apr 2025662.363.54$21
Mar 2025767.704.27$30
Feb 2025670.884.34$26
Jan 2025074.324.28$0
Dec 2024568.993.12$16
Nov 2024269.052.20$4
Oct 2024571.372.28$11
Sep 2024669.612.36$14
Aug 2024875.632.06$17
Jul 2024879.932.15$17
Jun 2024878.082.63$21
May 2024778.812.20$15
Apr 2024784.451.66$12
Mar 2024580.301.55$8
Feb 20241476.091.78$25
Jan 20241973.023.30$63
Dec 20232071.262.61$52
Nov 20232777.892.81$76
Oct 20232985.443.09$90
Sep 20232589.042.74$68
Aug 20231280.522.67$32
Jul 20231774.852.64$45
Jun 20231568.962.26$34
May 20231270.622.23$27
Apr 20231578.122.24$34
Mar 20231672.852.39$38
Feb 20231475.112.47$35
Jan 20231776.533.39$58
Dec 20221576.415.73$86
Nov 20221885.005.65$102
Oct 20222087.185.86$117
Sep 20222084.888.16$163
Aug 20222194.529.13$192
Jul 202226101.587.54$196
Jun 202226115.097.98$207
May 202227109.378.43$228
Apr 202219104.226.84$130
Mar 202241108.885.08$208
Feb 20223191.054.86$151
Jan 20221881.844.54$82
Dec 20211771.323.90$66
Nov 20212077.435.24$105
Oct 20211979.795.71$109
Sep 20211969.865.35$102
Aug 20211766.024.22$72
Jul 20211570.783.98$60
Jun 20211569.493.38$51
May 20212863.483.02$84
Apr 20215360.362.76$146
Mar 20215961.302.72$160
Feb 20213257.805.55$178
Jan 20211350.412.81$37
Dec 20201244.642.68$32
Nov 20201238.772.71$32
Oct 20201436.972.48$35
Sep 20201137.091.99$22
Aug 20201339.982.39$31
Jul 20201238.371.83$22
Jun 20201334.901.69$22
May 20201316.921.81$24
Apr 20201414.751.80$25
Mar 20201530.341.86$28
Feb 20201349.881.98$26
Jan 20201657.252.09$34
Dec 20192259.012.30$51
Nov 2019955.302.75$25
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 20191256.803.06$37
Feb 20192150.852.79$59
Jan 2019046.033.23$0
Dec 20183946.594.19$163
Nov 20186552.934.24$275
Oct 20186661.443.40$224
Sep 20187159.543.11$221
Aug 20186159.403.07$187
Jul 20187065.142.93$205
Jun 20186960.183.08$212
May 20187565.382.90$218
Apr 20186863.842.90$197
Mar 20187161.222.79$198
Feb 20186661.782.77$183
Jan 20187462.874.01$297
Dec 20177657.272.92$222
Nov 20177555.423.12$234
Oct 20177249.292.98$215
Sep 20177247.523.09$222
Aug 20177845.373.00$234
Jul 20176843.873.09$210
Jun 20174642.493.09$142
May 20177445.373.26$241
Apr 20177547.933.21$241
Mar 20177246.772.98$215
Feb 20176250.452.95$183
Jan 20177449.413.42$253
Dec 20168148.763.72$302
Nov 20167942.492.64$209
Oct 20168446.193.09$260
Sep 20168041.553.10$248
Aug 20168641.442.92$251
Jul 20168341.622.92$243
Jun 20168245.352.69$220
May 20168642.521.99$171
Apr 20168436.561.99$167
Mar 20169033.011.79$161
Feb 20168226.472.06$169
Jan 20168827.352.36$208
Dec 20158932.362.00$178
Nov 20158838.792.17$191
Oct 20159743.552.43$235
Sep 20158742.992.76$240
Aug 20156540.162.87$187
Jul 20159848.152.95$289
Jun 201510056.152.88$288
May 201510055.212.96$296
Apr 201511649.822.71$314
Mar 20154142.892.93$120
Feb 20153244.662.98$95
Jan 20157343.433.10$226
Dec 201410454.693.59$374
Nov 201411370.464.25$480
Oct 201412678.303.90$492
Sep 201412586.164.05$506
Aug 201413089.394.04$525
Jul 201412196.564.18$506
Jun 201411798.164.74$554
May 201411694.734.73$548
Apr 201411095.944.81$529
Mar 20147595.895.06$379
Feb 20147997.406.19$489
Jan 20148990.404.86$433
Dec 20138491.824.35$366
Nov 20138588.853.74$318
Oct 20139297.423.78$348
Sep 201388104.113.72$327
Aug 2013100104.253.52$352
Jul 2013108102.523.72$402
Jun 201311894.403.93$464
May 20137594.834.15$311
Apr 20138793.964.28$373
Mar 20134693.623.91$180
Feb 20132091.233.42$68
Jan 20138091.603.42$274
Dec 20128186.773.42$277
Nov 20125886.953.62$210
Oct 20127089.383.40$238
Sep 20128294.672.92$239
Aug 20128992.662.91$259
Jul 201212085.133.02$363
Jun 201212579.822.52$315
May 201211891.612.49$294
Apr 201271101.652.00$142
Mar 2012121105.052.22$269
Feb 201218101.102.57$46
Jan 20122098.092.73$55
Dec 20112096.873.24$65
Nov 20112095.723.31$66
Oct 20112284.983.65$80
Sep 20114683.623.99$183
Aug 20118783.404.15$361
Jul 20119094.144.52$407
Jun 20119292.904.64$427
May 201111398.134.40$498
Apr 201152105.964.33$225
Mar 201110796.364.06$434
Feb 201111085.644.18$460
Jan 201111586.504.59$528
Dec 20104285.734.35$183
Nov 20104280.843.80$159
Oct 20103878.103.51$133
Sep 20104872.633.98$191
Aug 20102773.684.42$119
Jul 20102572.554.74$118
Jun 20105070.364.91$246
May 20102471.124.24$102
Apr 20103281.694.12$132
Mar 20104478.394.39$193
Feb 20102973.585.44$158
Jan 20103174.365.96$185
Dec 20093071.445.48$165
Nov 20093274.593.75$120
Oct 20094972.544.11$201
Sep 20094465.543.06$135
Aug 20094867.423.22$154
Jul 20095361.133.46$184
Jun 20095366.163.90$206
May 20095254.743.93$204
Apr 20095146.773.59$183
Mar 20099942.144.06$402
Feb 200910032.814.63$463
Jan 200914635.865.37$784
Dec 200821137.105.98$1,261
Nov 200820955.496.86$1,434
Oct 200824475.246.92$1,689
Sep 2008172101.767.88$1,355
Aug 2008186114.228.48$1,578
Jul 2008185131.0811.39$2,107
Jun 2008185131.3313.03$2,411
May 2008191123.1711.57$2,211
Apr 2008189110.3110.45$1,976
Mar 2008198101.909.66$1,913
Feb 200820292.538.77$1,772
Jan 200822590.388.21$1,846
Dec 200724188.337.30$1,760
Nov 200722891.677.29$1,663
Oct 200724982.856.92$1,724
Sep 200724275.846.24$1,511
Aug 200725269.066.39$1,610
Jul 200728270.906.39$1,801
Jun 200722162.007.55$1,668
May 20079358.747.85$730
Apr 200723759.617.81$1,850
Mar 200726156.927.30$1,906
Feb 200718855.108.22$1,545
Jan 200729650.306.73$1,991
Dec 200639956.656.92$2,760
Nov 200647454.207.62$3,611
Oct 200672754.906.01$4,372
Sep 200671360.085.04$3,592
Aug 200670368.717.34$5,160
Jul 200674469.376.34$4,719
Jun 200672166.286.38$4,603
May 200683266.016.42$5,346
Apr 200679664.397.36$5,859
Mar 200695056.707.08$6,729
Feb 200690757.597.75$7,030
Jan 20061,01760.598.93$9,085
Dec 200519054.9413.42$2,549
Nov 20056054.6910.59$635
Oct 200514358.3413.80$1,973
Sep 20057061.4512.08$846
Aug 200595461.519.80$9,346
Jul 200597255.697.84$7,624
Jun 200598552.337.38$7,270
May 200592445.226.65$6,146
Apr 200592149.207.36$6,779
Mar 200589950.377.15$6,432
Feb 200595445.226.31$6,022
Jan 200599843.166.32$6,310
Dec 200495539.866.75$6,447
Nov 200483345.286.33$5,273
Oct 200487849.706.52$5,720
Sep 200471043.245.28$3,752
Aug 200457242.375.55$3,175
Jul 200463738.286.08$3,876
Jun 200469536.106.43$4,471
May 200490737.486.49$5,891
Apr 200493534.475.86$5,478
Mar 200499934.365.53$5,525
Feb 200491432.455.51$5,036
Jan 200496032.036.30$6,048
Dec 200394030.266.30$5,924
Nov 200390728.804.60$4,168
Oct 20031,03128.174.76$4,907
Sep 20031,05426.314.75$5,006
Aug 20031,07529.765.13$5,514
Jul 20031,04229.415.17$5,388
Jun 200391928.565.98$5,498
May 20031,01726.595.97$6,074
Apr 20031,04126.675.41$5,629
Mar 20031,18131.146.10$7,199
Feb 20031,13933.487.93$9,028
Jan 20031,21530.315.58$6,782
Dec 20021,20226.914.85$5,834
Nov 20021,15524.664.14$4,778
Oct 20021,28426.464.23$5,430
Sep 20021,04827.443.64$3,810
Aug 20021,14525.963.16$3,623
Jul 20021,21324.583.06$3,714
Jun 20021,14723.733.34$3,829
May 20021,20224.663.58$4,308
Apr 20021,08023.653.51$3,793
Mar 20021,09422.003.10$3,394
Feb 200285118.222.38$2,022
Jan 20021,08817.172.38$2,585
Dec 20011,32416.932.36$3,130
Nov 20011,39818.072.41$3,363
Oct 20011,19519.782.53$3,022
Sep 20011,14924.262.25$2,587
Aug 20011,28224.873.05$3,914
Jul 20011,33723.933.20$4,275
Jun 20011,12224.563.82$4,291
May 20011,32425.524.31$5,703
Apr 20011,27024.685.34$6,776
Mar 20011,31024.545.38$7,043
Feb 20011,20927.755.77$6,972
Jan 20011,31927.478.40$11,078
Dec 20001,20626.889.12$11,002
Nov 20001,41932.215.66$8,029
Oct 20001,44931.235.15$7,456
Sep 20001,29231.875.19$6,701
Aug 20001,45529.644.54$6,607
Jul 20001,47728.534.09$6,041
Jun 20001,53529.304.40$6,750
May 20001,43727.263.68$5,288
Apr 20001,47524.513.12$4,596
Mar 20001,64028.422.86$4,690
Feb 20001,61427.622.73$4,401
Jan 20001,62525.272.48$4,031
Dec 19991,58224.282.42$3,834
Nov 19991,68623.192.43$4,104
Oct 19991,68820.982.80$4,733
Sep 19991,76321.752.62$4,617
Aug 19991,77519.262.88$5,104
Jul 19991,77217.892.37$4,204
Jun 19991,75715.942.36$4,150
May 19991,96415.792.32$4,558
Apr 19991,80715.102.21$3,990
Mar 199989412.471.84$1,643
Feb 199909.981.82$0
Jan 19992,30010.381.90$4,370
Dec 19982,3219.201.77$4,116
Nov 19982,24710.892.19$4,911
Oct 19982,31812.421.97$4,565
Sep 19982,38412.592.08$4,965
Aug 19982,25911.301.91$4,309
Jul 19982,27511.742.24$5,090
Jun 19982,49611.242.24$5,584
May 19982,50712.622.21$5,531
Apr 19982,18313.042.51$5,469
Mar 19981,79012.802.31$4,134
Feb 19982,18213.952.30$5,017
Jan 19982,27814.702.15$4,909
Dec 19972,00416.322.41$4,832
Nov 19972,27718.193.09$7,032
Oct 19972,71819.253.15$8,561
Sep 19972,31217.742.95$6,832
Aug 19972,67517.862.55$6,834
Jul 19972,80917.582.25$6,312
Jun 19972,68717.242.26$6,065
May 19972,86918.972.31$6,623
Apr 19972,59617.882.08$5,407
Mar 19973,04618.951.94$5,907
Feb 19972,90220.492.21$6,402
Jan 19973,22623.483.54$11,419
Dec 19963,39123.32$0
Nov 19963,37021.97$0
Oct 19963,19923.31$0
Sep 19963,18122.22$0
Aug 19963,38820.26$0
Jul 19963,55219.55$0
Jun 19963,60218.73$0
May 19963,80719.43$0
Apr 19963,98221.51$0
Mar 19964,10719.38$0
Feb 19963,96216.98$0
Jan 19964,34617.07$0
Dec 19954,37117.19$0
Nov 19954,48816.00$0
Oct 19954,97615.43$0
Sep 19955,23016.18$0
Aug 19956,73815.92$0
Jul 199572915.24$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                    7 Mcf  × $  3.05 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/155259 is the state's own key, not one this site invented.