HATTON, EH ESTATE 12

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222806District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Oct 2006 – May 2026
Value, last 12 filed months
$49 k
at the published price for each month
Months reported
236
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-13173722
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition122 bbl$7,854
GasProduction260,528 Mcf$1,221,534
Total$1,229,388

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4205, -101.5339. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42049, -101.53390 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,150 ft.

Completions filed
Oct 2006
1 of 1 wells

1 well

42-10540056117,150 ftOct 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 202601,256106.413.05$3,826
Apr 202641,22698.932.87$3,914
Mar 20260089.753.15$0
Feb 2026790763.503.75$3,846
Jan 202691,10959.138.00$9,402
Dec 2025121,06456.664.41$5,376
Nov 2025111,11358.593.93$5,015
Oct 202571,08759.383.30$4,008
Sep 202541,15162.743.08$3,792
Aug 202591,00163.933.01$3,593
Jul 2025682766.743.32$3,142
Jun 2025481766.483.13$2,822
May 2025881760.553.23$3,125
Apr 20251198762.363.54$4,183
Mar 2025151,07367.704.27$5,595
Feb 2025151,00070.884.34$5,404
Jan 20250074.324.28$0
Dec 2024082868.993.12$2,584
Nov 202401,07569.052.20$2,363
Oct 202401,17071.372.28$2,669
Sep 202401,02769.612.36$2,428
Aug 202401,10175.632.06$2,272
Jul 202401,11779.932.15$2,398
Jun 202401,10678.082.63$2,913
May 2024098378.812.20$2,161
Apr 202401,16984.451.66$1,940
Mar 2024095180.301.55$1,469
Feb 202401,08776.091.78$1,939
Jan 202401,07073.023.30$3,529
Dec 2023089171.262.61$2,326
Nov 202301,16177.892.81$3,260
Oct 202301,15585.443.09$3,566
Sep 202301,03089.042.74$2,817
Aug 2023082480.522.67$2,202
Jul 202301,26274.852.64$3,334
Jun 202301,25368.962.26$2,830
May 202301,07570.622.23$2,394
Apr 202301,09078.122.24$2,439
Mar 202301,13572.852.39$2,716
Feb 202301,09575.112.47$2,700
Jan 202301,39976.533.39$4,739
Dec 202201,48876.415.73$8,525
Nov 202201,05485.005.65$5,951
Oct 2022099087.185.86$5,805
Sep 2022095084.888.16$7,756
Aug 202201,14594.529.13$10,451
Jul 20220902101.587.54$6,803
Jun 20220551115.097.98$4,395
May 20220957109.378.43$8,070
Apr 20220965104.226.84$6,598
Mar 20220646108.885.08$3,279
Feb 202204491.054.86$214
Jan 2022052481.844.54$2,378
Dec 202101,61271.323.90$6,285
Nov 2021077677.435.24$4,064
Oct 202101,05979.795.71$6,051
Sep 202101,09569.865.35$5,859
Aug 202101,35366.024.22$5,710
Jul 202101,32570.783.98$5,276
Jun 202101,12569.493.38$3,803
May 2021087363.483.02$2,634
Apr 202101,09760.362.76$3,026
Mar 2021088561.302.72$2,404
Feb 2021094857.805.55$5,259
Jan 2021091550.412.81$2,571
Dec 2020079344.642.68$2,122
Nov 2020085538.772.71$2,314
Oct 2020090736.972.48$2,248
Sep 2020077337.091.99$1,539
Aug 2020085439.982.39$2,037
Jul 2020086538.371.83$1,579
Jun 2020086434.901.69$1,460
May 2020091116.921.81$1,653
Apr 202001,00914.751.80$1,821
Mar 202001,02330.341.86$1,899
Feb 2020099549.881.98$1,971
Jan 202001,04657.252.09$2,191
Dec 201901,05259.012.30$2,424
Nov 201901,01155.302.75$2,781
Oct 201901,05053.472.42$2,539
Sep 201901,03255.052.66$2,742
Aug 201901,15753.112.30$2,666
Jul 201901,11956.272.46$2,753
Jun 201901,12252.782.49$2,795
May 201901,21958.482.74$3,340
Apr 201901,20862.632.75$3,323
Mar 201901,23256.803.06$3,773
Feb 201901,08950.852.79$3,041
Jan 201901,26746.033.23$4,090
Dec 201801,31546.594.19$5,504
Nov 201801,12852.934.24$4,780
Oct 201801,21461.443.40$4,125
Sep 201801,24959.543.11$3,882
Aug 2018099159.403.07$3,039
Jul 201801,25465.142.93$3,677
Jun 201801,09460.183.08$3,366
May 201801,27965.382.90$3,710
Apr 2018062963.842.90$1,825
Mar 2018096161.222.79$2,678
Feb 2018087361.782.77$2,415
Jan 2018074362.874.01$2,979
Dec 2017090457.272.92$2,641
Nov 2017056255.423.12$1,753
Oct 2017094049.292.98$2,805
Sep 2017086347.523.09$2,664
Aug 2017063745.373.00$1,914
Jul 2017062643.873.09$1,933
Jun 2017073242.493.09$2,260
May 2017099145.373.26$3,234
Apr 2017095247.933.21$3,057
Mar 201701,05246.772.98$3,139
Feb 2017074650.452.95$2,203
Jan 201701,09749.413.42$3,750
Dec 201601,30948.763.72$4,873
Nov 2016094442.492.64$2,496
Oct 201601,03046.193.09$3,183
Sep 201601,15441.553.10$3,578
Aug 201601,04041.442.92$3,041
Jul 201601,06641.622.92$3,117
Jun 201601,02245.352.69$2,745
May 201601,20042.521.99$2,389
Apr 201601,15036.561.99$2,290
Mar 201601,06233.011.79$1,905
Feb 2016095026.472.06$1,960
Jan 201601,08127.352.36$2,556
Dec 201501,07132.362.00$2,144
Nov 201501,19238.792.17$2,583
Oct 201501,11743.552.43$2,710
Sep 2015098242.992.76$2,709
Aug 2015090740.162.87$2,605
Jul 201501,07248.152.95$3,157
Jun 201501,17056.152.88$3,373
May 201501,32455.212.96$3,913
Apr 201501,07349.822.71$2,904
Mar 2015093342.892.93$2,738
Feb 2015068544.662.98$2,039
Jan 2015057143.433.10$1,770
Dec 2014026054.693.59$934
Nov 2014026270.464.25$1,114
Oct 2014026578.303.90$1,034
Sep 2014026886.164.05$1,084
Aug 2014028889.394.04$1,162
Jul 2014026396.564.18$1,099
Jun 2014027798.164.74$1,312
May 2014028694.734.73$1,352
Apr 2014028195.944.81$1,351
Mar 2014026295.895.06$1,325
Feb 2014026897.406.19$1,659
Jan 2014029790.404.86$1,444
Dec 2013030191.824.35$1,311
Nov 2013030288.853.74$1,129
Oct 2013030597.423.78$1,153
Sep 20130291104.113.72$1,082
Aug 20130304104.253.52$1,071
Jul 20130296102.523.72$1,100
Jun 2013031394.403.93$1,231
May 2013029594.834.15$1,224
Apr 2013033393.964.28$1,426
Mar 2013028093.623.91$1,096
Feb 2013030891.233.42$1,053
Jan 2013034691.603.42$1,183
Dec 2012033586.773.42$1,146
Nov 2012035886.953.62$1,298
Oct 2012035789.383.40$1,214
Sep 2012035594.672.92$1,036
Aug 2012044592.662.91$1,294
Jul 2012042785.133.02$1,290
Jun 2012034079.822.52$856
May 2012038091.612.49$946
Apr 20120375101.652.00$749
Mar 20120400105.052.22$889
Feb 20120396101.102.57$1,018
Jan 2012038398.092.73$1,047
Dec 2011038396.873.24$1,241
Nov 2011043095.723.31$1,424
Oct 2011050784.983.65$1,850
Sep 2011083483.623.99$3,324
Aug 2011043683.404.15$1,809
Jul 2011042494.144.52$1,915
Jun 2011037592.904.64$1,740
May 2011044598.134.40$1,960
Apr 20110498105.964.33$2,158
Mar 2011045096.364.06$1,826
Feb 2011066885.644.18$2,792
Jan 2011069686.504.59$3,194
Dec 2010075085.734.35$3,261
Nov 2010073580.843.80$2,790
Oct 2010077478.103.51$2,716
Sep 2010084072.633.98$3,343
Aug 201001,05373.684.42$4,654
Jul 201001,54672.554.74$7,323
Jun 201001,11670.364.91$5,480
May 201001,54071.124.24$6,522
Apr 201001,37181.694.12$5,652
Mar 201001,63478.394.39$7,171
Feb 201001,57273.585.44$8,555
Jan 201002,34574.365.96$13,986
Dec 200901,73971.445.48$9,536
Nov 200901,71174.593.75$6,419
Oct 200902,09872.544.11$8,623
Sep 200902,06665.543.06$6,332
Aug 200902,08067.423.22$6,694
Jul 200902,04861.133.46$7,095
Jun 200901,80766.163.90$7,038
May 200901,88554.743.93$7,400
Apr 200901,69146.773.59$6,066
Mar 200901,75742.144.06$7,132
Feb 200901,68832.814.63$7,821
Jan 200901,28135.865.37$6,880
Dec 200801,03137.105.98$6,162
Nov 200801,28155.496.86$8,788
Oct 200801,96975.246.92$13,629
Sep 200801,869101.767.88$14,722
Aug 200802,650114.228.48$22,480
Jul 200802,400131.0811.39$27,335
Jun 200802,211131.3313.03$28,815
May 200802,611123.1711.57$30,220
Apr 200802,311110.3110.45$24,161
Mar 200802,693101.909.66$26,025
Feb 200802,74292.538.77$24,049
Jan 200802,97390.388.21$24,396
Dec 200702,55488.337.30$18,649
Nov 200702,24191.677.29$16,341
Oct 200702,41182.856.92$16,689
Sep 200702,42875.846.24$15,161
Aug 200702,78169.066.39$17,765
Jul 200703,00270.906.39$19,177
Jun 200703,05662.007.55$23,068
May 200703,18758.747.85$25,006
Apr 200702,82059.617.81$22,011
Mar 200703,25156.927.30$23,739
Feb 200703,16655.108.22$26,012
Jan 200703,13450.306.73$21,082
Dec 200603,37056.656.92$23,315
Nov 200603,09454.207.62$23,568
Oct 200601,35954.906.01$8,173

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,256 Mcf  × $  3.05 =     $3,826

────────────────────────────────────────────────────
Month total                                   $3,826

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/222806 is the state's own key, not one this site invented.