MILLSPAUGH, AUSTIN C. "32B"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 160455District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$389 k
Oct 1996 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
356
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-01-06135803
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition51 bbl$1,757
GasProduction100,843 Mcf$386,933
Total$388,690

6,057 Mcf of this lease's gas, across 3 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5038, -101.5415. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50375, -101.54148 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,350 ft.

Completions filed
Oct 1996
1 of 1 wells

1 well

42-1053734970017,350 ftOct 1996

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (356)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

356 months

May 20260112106.413.05$341
Apr 2026013298.932.87$379
Mar 20260089.753.15$0
Feb 2026110263.503.75$446
Jan 2026111359.138.00$963
Dec 2025111256.664.41$551
Nov 2025111458.593.93$506
Oct 2025110059.383.30$390
Sep 2025011362.743.08$348
Aug 2025111263.933.01$402
Jul 2025111266.743.32$438
Jun 2025111366.483.13$420
May 2025111360.553.23$426
Apr 2025111562.363.54$470
Mar 2025211067.704.27$605
Feb 2025211270.884.34$628
Jan 20250074.324.28$0
Dec 2024011068.993.12$343
Nov 2024011169.052.20$244
Oct 2024010971.372.28$249
Sep 2024011269.612.36$265
Aug 2024012975.632.06$266
Jul 2024012879.932.15$275
Jun 2024012878.082.63$337
May 2024013078.812.20$286
Apr 2024012984.451.66$214
Mar 2024012980.301.55$199
Feb 2024012376.091.78$219
Jan 2024014173.023.30$465
Dec 2023013271.262.61$345
Nov 2023012677.892.81$354
Oct 2023014685.443.09$451
Sep 2023012789.042.74$347
Aug 2023015480.522.67$412
Jul 20230074.852.64$0
Jun 202309168.962.26$206
May 2023014170.622.23$314
Apr 2023014078.122.24$313
Mar 2023014872.852.39$354
Feb 2023013275.112.47$325
Jan 2023014476.533.39$488
Dec 2022013976.415.73$796
Nov 2022013785.005.65$774
Oct 2022014487.185.86$844
Sep 2022014284.888.16$1,159
Aug 2022012194.529.13$1,104
Jul 20220134101.587.54$1,011
Jun 20220125115.097.98$997
May 20220138109.378.43$1,164
Apr 20220119104.226.84$814
Mar 20220113108.885.08$574
Feb 2022011391.054.86$549
Jan 2022011481.844.54$517
Dec 2021011271.323.90$437
Nov 2021013777.435.24$717
Oct 202107979.795.71$451
Sep 2021011569.865.35$615
Aug 2021012066.024.22$506
Jul 2021011670.783.98$462
Jun 2021011269.493.38$379
May 2021011763.483.02$353
Apr 2021011460.362.76$314
Mar 2021012561.302.72$340
Feb 2021013057.805.55$721
Jan 2021012650.412.81$354
Dec 202008844.642.68$235
Nov 202009638.772.71$260
Oct 2020010236.972.48$253
Sep 202008637.091.99$171
Aug 202009539.982.39$227
Jul 202009738.371.83$177
Jun 202009634.901.69$162
May 2020010216.921.81$185
Apr 2020011314.751.80$204
Mar 2020011830.341.86$219
Feb 2020010749.881.98$212
Jan 2020012557.252.09$262
Dec 2019012659.012.30$290
Nov 2019011855.302.75$325
Oct 2019012753.472.42$307
Sep 2019013055.052.66$345
Aug 2019014453.112.30$332
Jul 201909156.272.46$224
Jun 2019010152.782.49$252
May 2019010458.482.74$285
Apr 2019010362.632.75$283
Mar 2019011356.803.06$346
Feb 2019010750.852.79$299
Jan 2019011946.033.23$384
Dec 2018012246.594.19$511
Nov 2018011752.934.24$496
Oct 2018012361.443.40$418
Sep 2018011959.543.11$370
Aug 2018012459.403.07$380
Jul 2018012765.142.93$372
Jun 2018012560.183.08$385
May 2018014765.382.90$426
Apr 2018013763.842.90$397
Mar 2018012861.222.79$357
Feb 2018013161.782.77$362
Jan 2018016562.874.01$662
Dec 2017016857.272.92$491
Nov 2017016955.423.12$527
Oct 2017017549.292.98$522
Sep 2017017147.523.09$528
Aug 2017017545.373.00$526
Jul 2017017643.873.09$543
Jun 2017015842.493.09$488
May 2017019945.373.26$649
Apr 2017017847.933.21$572
Mar 2017017846.772.98$531
Feb 2017016050.452.95$472
Jan 2017019049.413.42$650
Dec 2016019448.763.72$722
Nov 2016017642.492.64$465
Oct 2016013946.193.09$430
Sep 2016014841.553.10$459
Aug 2016016241.442.92$474
Jul 2016014841.622.92$433
Jun 2016014145.352.69$379
May 2016015542.521.99$309
Apr 2016012036.561.99$239
Mar 2016014533.011.79$260
Feb 2016013826.472.06$285
Jan 2016016027.352.36$378
Dec 2015016032.362.00$320
Nov 2015015538.792.17$336
Oct 2015018043.552.43$437
Sep 2015017342.992.76$477
Aug 2015017240.162.87$494
Jul 2015018248.152.95$536
Jun 2015017956.152.88$516
May 2015019555.212.96$576
Apr 2015017549.822.71$474
Mar 2015017642.892.93$517
Feb 2015015744.662.98$467
Jan 2015017843.433.10$552
Dec 2014017854.693.59$639
Nov 2014017470.464.25$740
Oct 2014018178.303.90$706
Sep 2014018586.164.05$748
Aug 2014016189.394.04$650
Jul 201409596.564.18$397
Jun 201409698.164.74$455
May 201409994.734.73$468
Apr 201409995.944.81$476
Mar 201409095.895.06$455
Feb 201409297.406.19$570
Jan 2014010490.404.86$506
Dec 2013010591.824.35$457
Nov 2013010188.853.74$378
Oct 2013010697.423.78$401
Sep 20130105104.113.72$390
Aug 20130110104.253.52$387
Jul 20130115102.523.72$428
Jun 2013012194.403.93$476
May 201307594.834.15$311
Apr 2013011393.964.28$484
Mar 201309393.623.91$364
Feb 201309591.233.42$325
Jan 2013011291.603.42$383
Dec 2012013986.773.42$475
Nov 201206786.953.62$243
Oct 2012011289.383.40$381
Sep 2012011394.672.92$330
Aug 2012011392.662.91$329
Jul 2012011185.133.02$335
Jun 2012011079.822.52$277
May 2012011691.612.49$289
Apr 20120114101.652.00$228
Mar 20120121105.052.22$269
Feb 20120110101.102.57$283
Jan 2012012398.092.73$336
Dec 2011012796.873.24$411
Nov 2011013495.723.31$444
Oct 2011010784.983.65$390
Sep 2011011783.623.99$466
Aug 2011011383.404.15$469
Jul 2011011994.144.52$538
Jun 2011010792.904.64$496
May 2011011798.134.40$515
Apr 20110101105.964.33$438
Mar 2011011396.364.06$458
Feb 201109885.644.18$410
Jan 201107086.504.59$321
Dec 201007985.734.35$343
Nov 201007880.843.80$296
Oct 201007678.103.51$267
Sep 2010013472.633.98$533
Aug 2010013673.684.42$601
Jul 2010014772.554.74$696
Jun 2010011870.364.91$579
May 2010015171.124.24$640
Apr 2010012581.694.12$515
Mar 2010015178.394.39$663
Feb 2010013773.585.44$746
Jan 2010016174.365.96$960
Dec 2009016971.445.48$927
Nov 2009016874.593.75$630
Oct 2009017872.544.11$732
Sep 2009017365.543.06$530
Aug 2009017467.423.22$560
Jul 2009019861.133.46$686
Jun 2009022666.163.90$880
May 2009022454.743.93$879
Apr 2009023946.773.59$857
Mar 2009027842.144.06$1,128
Feb 2009018832.814.63$871
Jan 20090335.865.37$16
Dec 20080337.105.98$18
Nov 200803455.496.86$233
Oct 200804175.246.92$284
Sep 20080138101.767.88$1,087
Aug 2008076114.228.48$645
Jul 20080214131.0811.39$2,437
Jun 20080162131.3313.03$2,111
May 20080222123.1711.57$2,569
Apr 20080206110.3110.45$2,154
Mar 20080223101.909.66$2,155
Feb 2008032692.538.77$2,859
Jan 2008035490.388.21$2,905
Dec 2007042588.337.30$3,103
Nov 2007031591.677.29$2,297
Oct 2007021682.856.92$1,495
Sep 2007024875.846.24$1,549
Aug 2007030769.066.39$1,961
Jul 2007030470.906.39$1,942
Jun 2007032262.007.55$2,431
May 2007030958.747.85$2,425
Apr 2007029359.617.81$2,287
Mar 2007035656.927.30$2,600
Feb 2007030355.108.22$2,489
Jan 2007029950.306.73$2,011
Dec 2006032556.656.92$2,248
Nov 2006030754.207.62$2,339
Oct 2006035754.906.01$2,147
Sep 2006037460.085.04$1,884
Aug 2006035668.717.34$2,613
Jul 2006038469.376.34$2,436
Jun 2006029966.286.38$1,909
May 2006036466.016.42$2,339
Apr 2006031464.397.36$2,311
Mar 2006030056.707.08$2,125
Feb 2006029657.597.75$2,294
Jan 2006036460.598.93$3,252
Dec 2005029954.9413.42$4,011
Nov 2005022454.6910.59$2,372
Oct 2005024358.3413.80$3,352
Sep 2005029361.4512.08$3,539
Aug 2005035461.519.80$3,468
Jul 2005033255.697.84$2,604
Jun 2005034752.337.38$2,561
May 2005030845.226.65$2,049
Apr 2005033749.207.36$2,480
Mar 2005033950.377.15$2,426
Feb 2005031945.226.31$2,014
Jan 2005040643.166.32$2,567
Dec 2004016539.866.75$1,114
Nov 2004032945.286.33$2,083
Oct 2004042349.706.52$2,756
Sep 2004037343.245.28$1,971
Aug 2004034742.375.55$1,926
Jul 2004035738.286.08$2,172
Jun 2004029836.106.43$1,917
May 2004032237.486.49$2,091
Apr 2004031434.475.86$1,840
Mar 2004032134.365.53$1,775
Feb 2004030132.455.51$1,658
Jan 2004030332.036.30$1,909
Dec 2003032430.266.30$2,042
Nov 2003033928.804.60$1,558
Oct 2003040928.174.76$1,947
Sep 2003034426.314.75$1,634
Aug 2003037629.765.13$1,929
Jul 2003035729.415.17$1,846
Jun 2003038228.565.98$2,285
May 2003040026.595.97$2,389
Apr 2003038026.675.41$2,055
Mar 2003045631.146.10$2,780
Feb 2003042633.487.93$3,376
Jan 2003042330.315.58$2,361
Dec 2002045626.914.85$2,213
Nov 2002042224.664.14$1,746
Oct 2002045626.464.23$1,928
Sep 2002047527.443.64$1,727
Aug 2002049225.963.16$1,557
Jul 2002049524.583.06$1,516
Jun 2002044523.733.34$1,486
May 2002046824.663.58$1,677
Apr 2002044823.653.51$1,574
Mar 2002043122.003.10$1,337
Feb 2002036018.222.38$855
Jan 2002042817.172.38$1,017
Dec 2001040616.932.36$960
Nov 2001045818.072.41$1,102
Oct 2001048919.782.53$1,237
Sep 2001043524.262.25$979
Aug 2001043124.873.05$1,316
Jul 2001035023.933.20$1,119
Jun 2001042624.563.82$1,629
May 2001044325.524.31$1,908
Apr 2001045024.685.34$2,401
Mar 2001046224.545.38$2,484
Feb 2001043227.755.77$2,491
Jan 2001048427.478.40$4,065
Dec 2000040026.889.12$3,649
Nov 2000051932.215.66$2,937
Oct 2000053431.235.15$2,748
Sep 2000061331.875.19$3,179
Aug 2000055129.644.54$2,502
Jul 2000045428.534.09$1,857
Jun 2000050129.304.40$2,203
May 2000056027.263.68$2,061
Apr 2000055924.513.12$1,742
Mar 2000057428.422.86$1,642
Feb 2000053127.622.73$1,448
Jan 2000064325.272.48$1,595
Dec 1999063624.282.42$1,541
Nov 1999060923.192.43$1,482
Oct 1999061120.982.80$1,713
Sep 1999054421.752.62$1,425
Aug 1999069519.262.88$1,999
Jul 1999055117.892.37$1,307
Jun 1999058715.942.36$1,387
May 1999058315.792.32$1,353
Apr 1999060615.102.21$1,338
Mar 1999066712.471.84$1,226
Feb 199903779.981.82$685
Jan 1999059110.381.90$1,123
Dec 199807069.201.77$1,252
Nov 1998057210.892.19$1,250
Oct 1998072212.421.97$1,422
Sep 1998065512.592.08$1,364
Aug 1998072511.301.91$1,383
Jul 1998074711.742.24$1,671
Jun 1998079511.242.24$1,779
May 1998075912.622.21$1,675
Apr 1998070113.042.51$1,756
Mar 1998082712.802.31$1,910
Feb 1998076513.952.30$1,759
Jan 1998076714.702.15$1,653
Dec 1997078616.322.41$1,895
Nov 1997058118.193.09$1,794
Oct 1997057119.253.15$1,799
Sep 1997067717.742.95$2,000
Aug 1997091217.862.55$2,330
Jul 199701,07417.582.25$2,413
Jun 199701,07517.242.26$2,426
May 199701,22418.972.31$2,826
Apr 199701,41017.882.08$2,937
Mar 199701,53118.951.94$2,969
Feb 199701,42520.492.21$3,143
Jan 199701,68223.483.54$5,954
Dec 199602,01623.32$0
Nov 199602,28121.97$0
Oct 1996371,76023.31$862

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  112 Mcf  × $  3.05 =       $341

────────────────────────────────────────────────────
Month total                                     $341

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/160455 is the state's own key, not one this site invented.