MILLSPAUGH, AUSTIN C. "A4"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 161044District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$650 k
Oct 1996 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
356
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-04-01135946
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$185
GasProduction196,880 Mcf$649,619
Total$649,804

13,521 Mcf of this lease's gas, across 2 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5026, -101.5356. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.50261, -101.53561 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,350 ft.

Completions filed
Oct 1996
1 of 1 wells

1 well

42-1053737870037,350 ftOct 1996

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (356)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

356 months

May 2026036106.413.05$110
Apr 202604898.932.87$138
Mar 20260089.753.15$0
Feb 202604863.503.75$180
Jan 202605659.138.00$448
Dec 202515456.664.41$295
Nov 202505358.593.93$208
Oct 202505659.383.30$185
Sep 202505662.743.08$172
Aug 202503863.933.01$115
Jul 202503866.743.32$126
Jun 202504366.483.13$135
May 202514360.553.23$200
Apr 202504162.363.54$145
Mar 202514367.704.27$251
Feb 202503170.884.34$135
Jan 20250074.324.28$0
Dec 202403868.993.12$119
Nov 202403969.052.20$86
Oct 202404371.372.28$98
Sep 202404269.612.36$99
Aug 202404075.632.06$83
Jul 202403979.932.15$84
Jun 202403878.082.63$100
May 202403578.812.20$77
Apr 202403884.451.66$63
Mar 202403980.301.55$60
Feb 202403576.091.78$62
Jan 202403773.023.30$122
Dec 202303871.262.61$99
Nov 202303977.892.81$109
Oct 202303785.443.09$114
Sep 202303589.042.74$96
Aug 202303680.522.67$96
Jul 202304074.852.64$106
Jun 202304168.962.26$93
May 202304170.622.23$91
Apr 202303078.122.24$67
Mar 202303172.852.39$74
Feb 202303775.112.47$91
Jan 202303276.533.39$108
Dec 202203076.415.73$172
Nov 202202285.005.65$124
Oct 202203787.185.86$217
Sep 202204184.888.16$335
Aug 202204194.529.13$374
Jul 2022039101.587.54$294
Jun 2022038115.097.98$303
May 2022040109.378.43$337
Apr 2022039104.226.84$267
Mar 2022039108.885.08$198
Feb 202203791.054.86$180
Jan 202204081.844.54$182
Dec 202104171.323.90$160
Nov 202104077.435.24$209
Oct 202104379.795.71$246
Sep 202104469.865.35$235
Aug 202104766.024.22$198
Jul 202104970.783.98$195
Jun 202104769.493.38$159
May 202105363.483.02$160
Apr 202105560.362.76$152
Mar 202105961.302.72$160
Feb 202104957.805.55$272
Jan 202106250.412.81$174
Dec 202004644.642.68$123
Nov 202005038.772.71$135
Oct 202005236.972.48$129
Sep 202004537.091.99$90
Aug 202004939.982.39$117
Jul 202005038.371.83$91
Jun 202005034.901.69$85
May 202005316.921.81$96
Apr 202005914.751.80$106
Mar 202006130.341.86$113
Feb 202005649.881.98$111
Jan 202006757.252.09$140
Dec 201906059.012.30$138
Nov 201906755.302.75$184
Oct 201905553.472.42$133
Sep 201906055.052.66$159
Aug 201906253.112.30$143
Jul 201906856.272.46$167
Jun 201907252.782.49$179
May 201907758.482.74$211
Apr 201907862.632.75$215
Mar 201908056.803.06$245
Feb 201907550.852.79$209
Jan 201907546.033.23$242
Dec 201807946.594.19$331
Nov 201807552.934.24$318
Oct 201807961.443.40$268
Sep 201807259.543.11$224
Aug 201806159.403.07$187
Jul 201805465.142.93$158
Jun 201804760.183.08$145
May 201804665.382.90$133
Apr 201804963.842.90$142
Mar 201805761.222.79$159
Feb 201804961.782.77$136
Jan 201805262.874.01$208
Dec 201706357.272.92$184
Nov 201704555.423.12$140
Oct 201704849.292.98$143
Sep 20170347.523.09$9
Aug 20170045.373.00$0
Jul 20170943.873.09$28
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170950.452.95$27
Jan 20170549.413.42$17
Dec 201601348.763.72$48
Nov 201603242.492.64$85
Oct 201606646.193.09$204
Sep 201607041.553.10$217
Aug 201607741.442.92$225
Jul 201606441.622.92$187
Jun 201605545.352.69$148
May 201603442.521.99$68
Apr 201602936.561.99$58
Mar 201604333.011.79$77
Feb 201605526.472.06$114
Jan 201606627.352.36$156
Dec 201506732.362.00$134
Nov 201506438.792.17$139
Oct 201506643.552.43$160
Sep 201506242.992.76$171
Aug 201506640.162.87$190
Jul 201507148.152.95$209
Jun 201506956.152.88$199
May 201507155.212.96$210
Apr 201506849.822.71$184
Mar 201507142.892.93$208
Feb 201506444.662.98$190
Jan 201507643.433.10$236
Dec 201407154.693.59$255
Nov 201406970.464.25$293
Oct 201407278.303.90$281
Sep 201407086.164.05$283
Aug 201407489.394.04$299
Jul 201407496.564.18$309
Jun 201407198.164.74$336
May 201407394.734.73$345
Apr 201407695.944.81$365
Mar 201404295.895.06$212
Feb 201406997.406.19$427
Jan 201407290.404.86$350
Dec 201306991.824.35$300
Nov 201306688.853.74$247
Oct 201306697.423.78$249
Sep 2013064104.113.72$238
Aug 2013067104.253.52$236
Jul 2013074102.523.72$275
Jun 201307094.403.93$275
May 201304494.834.15$183
Apr 201307693.964.28$325
Mar 201305493.623.91$211
Feb 201306691.233.42$226
Jan 201307791.603.42$263
Dec 201207886.773.42$267
Nov 201207786.953.62$279
Oct 201208189.383.40$275
Sep 201208194.672.92$236
Aug 201208492.662.91$244
Jul 201208585.133.02$257
Jun 201208279.822.52$207
May 201208591.612.49$212
Apr 2012083101.652.00$166
Mar 2012072105.052.22$160
Feb 2012073101.102.57$188
Jan 2012011198.092.73$303
Dec 201108596.873.24$275
Nov 201109495.723.31$311
Oct 2011010084.983.65$365
Sep 201109883.623.99$391
Aug 201109283.404.15$382
Jul 201108894.144.52$398
Jun 201108392.904.64$385
May 201108698.134.40$379
Apr 2011060105.964.33$260
Mar 201107296.364.06$292
Feb 201107185.644.18$297
Jan 201109286.504.59$422
Dec 2010010085.734.35$435
Nov 201009080.843.80$342
Oct 201009978.103.51$347
Sep 201007172.633.98$283
Aug 201009473.684.42$415
Jul 2010010272.554.74$483
Jun 201009970.364.91$486
May 201006871.124.24$288
Apr 201007581.694.12$309
Mar 201008878.394.39$386
Feb 201007373.585.44$397
Jan 201008974.365.96$531
Dec 200907971.445.48$433
Nov 200907674.593.75$285
Oct 200907972.544.11$325
Sep 200907665.543.06$233
Aug 2009010667.423.22$341
Jul 2009014561.133.46$502
Jun 2009015366.163.90$596
May 2009014954.743.93$585
Apr 2009015146.773.59$542
Mar 2009017242.144.06$698
Feb 2009013832.814.63$639
Jan 2009013935.865.37$747
Dec 2008011437.105.98$681
Nov 2008010555.496.86$720
Oct 200808075.246.92$554
Sep 2008041101.767.88$323
Aug 2008043114.228.48$365
Jul 2008089131.0811.39$1,014
Jun 2008097131.3313.03$1,264
May 20080174123.1711.57$2,014
Apr 20080575110.3110.45$6,012
Mar 20080795101.909.66$7,683
Feb 2008028592.538.77$2,500
Jan 2008027390.388.21$2,240
Dec 2007027588.337.30$2,008
Nov 2007034291.677.29$2,494
Oct 2007040082.856.92$2,769
Sep 2007046275.846.24$2,885
Aug 2007015169.066.39$965
Jul 2007076770.906.39$4,900
Jun 2007040762.007.55$3,072
May 2007024858.747.85$1,946
Apr 2007044759.617.81$3,489
Mar 2007045256.927.30$3,300
Feb 2007046555.108.22$3,820
Jan 2007017050.306.73$1,144
Dec 2006014456.656.92$996
Nov 2006014454.207.62$1,097
Oct 2006013154.906.01$788
Sep 2006036060.085.04$1,813
Aug 2006027368.717.34$2,004
Jul 200608969.376.34$565
Jun 2006033966.286.38$2,164
May 2006081466.016.42$5,230
Apr 2006055264.397.36$4,063
Mar 2006026456.707.08$1,870
Feb 2006044057.597.75$3,410
Jan 2006047260.598.93$4,217
Dec 2005036054.9413.42$4,830
Nov 2005014554.6910.59$1,535
Oct 2005033558.3413.80$4,622
Sep 2005037761.4512.08$4,554
Aug 2005044861.519.80$4,389
Jul 2005048555.697.84$3,804
Jun 2005055252.337.38$4,074
May 2005039045.226.65$2,594
Apr 2005051849.207.36$3,813
Mar 2005052950.377.15$3,785
Feb 2005028245.226.31$1,780
Jan 2005013643.166.32$860
Dec 2004020739.866.75$1,397
Nov 2004019945.286.33$1,260
Oct 2004036149.706.52$2,352
Sep 2004059443.245.28$3,139
Aug 2004066142.375.55$3,669
Jul 2004066038.286.08$4,016
Jun 2004067036.106.43$4,310
May 2004068837.486.49$4,468
Apr 2004068934.475.86$4,036
Mar 2004075034.365.53$4,148
Feb 2004058632.455.51$3,229
Jan 2004066932.036.30$4,214
Dec 2003066630.266.30$4,197
Nov 2003062828.804.60$2,886
Oct 2003069128.174.76$3,289
Sep 2003072826.314.75$3,458
Aug 2003082129.765.13$4,212
Jul 2003082329.415.17$4,256
Jun 2003046228.565.98$2,764
May 2003053326.595.97$3,183
Apr 2003064326.675.41$3,477
Mar 2003074131.146.10$4,517
Feb 2003066433.487.93$5,263
Jan 2003092230.315.58$5,147
Dec 2002044526.914.85$2,160
Nov 2002048024.664.14$1,986
Oct 2002090726.464.23$3,836
Sep 2002090327.443.64$3,283
Aug 2002098425.963.16$3,114
Jul 2002086124.583.06$2,636
Jun 2002084423.733.34$2,817
May 2002089524.663.58$3,208
Apr 2002087123.653.51$3,059
Mar 2002093522.003.10$2,901
Feb 2002091218.222.38$2,167
Jan 200201,02217.172.38$2,428
Dec 200101,10016.932.36$2,601
Nov 200101,02018.072.41$2,454
Oct 2001016219.782.53$410
Sep 2001027324.262.25$615
Aug 2001030624.873.05$934
Jul 2001079123.933.20$2,529
Jun 2001087224.563.82$3,335
May 2001083325.524.31$3,588
Apr 2001081424.685.34$4,343
Mar 2001091124.545.38$4,898
Feb 2001096327.755.77$5,554
Jan 200101,19627.478.40$10,045
Dec 200001,08426.889.12$9,889
Nov 200001,07932.215.66$6,105
Oct 200001,20531.235.15$6,200
Sep 2000094531.875.19$4,901
Aug 2000094129.644.54$4,273
Jul 200001,01028.534.09$4,131
Jun 200001,04729.304.40$4,604
May 200001,04327.263.68$3,838
Apr 200001,05824.513.12$3,297
Mar 200001,12328.422.86$3,212
Feb 200001,10827.622.73$3,021
Jan 200001,23725.272.48$3,068
Dec 199901,08924.282.42$2,639
Nov 199901,08423.192.43$2,638
Oct 199901,14220.982.80$3,202
Sep 199901,13421.752.62$2,970
Aug 199901,17219.262.88$3,370
Jul 199901,36817.892.37$3,245
Jun 199901,32715.942.36$3,135
May 199901,48115.792.32$3,437
Apr 199901,23915.102.21$2,736
Mar 199901,70212.471.84$3,129
Feb 199901,4979.981.82$2,721
Jan 199901,37210.381.90$2,607
Dec 199801,5439.201.77$2,736
Nov 199801,64010.892.19$3,585
Oct 199802,32812.421.97$4,584
Sep 199802,64712.592.08$5,513
Aug 199803,12511.301.91$5,960
Jul 199803,36911.742.24$7,537
Jun 199803,59911.242.24$8,052
May 199803,24012.622.21$7,149
Apr 199803,02313.042.51$7,574
Mar 199803,69912.802.31$8,543
Feb 199803,42113.952.30$7,865
Jan 199803,94014.702.15$8,490
Dec 199703,87916.322.41$9,353
Nov 199703,93118.193.09$12,140
Oct 199704,05119.253.15$12,760
Sep 199704,19617.742.95$12,399
Aug 199704,52017.862.55$11,547
Jul 199704,65517.582.25$10,460
Jun 199704,14617.242.26$9,358
May 199704,23718.972.31$9,781
Apr 199703,74817.882.08$7,806
Mar 199705,74218.951.94$11,135
Feb 199706,24720.492.21$13,780
Jan 199707,20023.483.54$25,486
Dec 199607,67323.32$0
Nov 199605,84821.97$0
Oct 19960023.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   36 Mcf  × $  3.05 =       $110

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/161044 is the state's own key, not one this site invented.