CHILDRESS "8D"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 163276District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$744 k
Mar 1997 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
351
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-07-18136827
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition13 bbl$828
GasProduction191,827 Mcf$742,852
Total$743,680

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4181, -101.4224. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41811, -101.42237 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,916 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,916 ft.

Completions filed
Mar 1997
1 of 1 wells

1 well

42-1053756116,916 ftMar 1997

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (351)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

351 months

May 20260118106.413.05$359
Apr 2026013698.932.87$390
Mar 20260089.753.15$0
Feb 2026110663.503.75$461
Jan 2026112359.138.00$1,043
Dec 2025110356.664.41$511
Nov 2025111758.593.93$518
Oct 2025111659.383.30$443
Sep 2025011762.743.08$360
Aug 2025112163.933.01$429
Jul 2025112766.743.32$488
Jun 202508766.483.13$272
May 202518760.553.23$342
Apr 2025111162.363.54$456
Mar 2025213067.704.27$690
Feb 2025211470.884.34$637
Jan 20250074.324.28$0
Dec 2024012668.993.12$393
Nov 2024012669.052.20$277
Oct 2024012171.372.28$276
Sep 2024012469.612.36$293
Aug 2024013375.632.06$274
Jul 2024013679.932.15$292
Jun 2024013178.082.63$345
May 2024013278.812.20$290
Apr 2024012884.451.66$212
Mar 2024013580.301.55$209
Feb 2024012976.091.78$230
Jan 2024013873.023.30$455
Dec 2023013571.262.61$352
Nov 2023013777.892.81$385
Oct 2023014185.443.09$435
Sep 2023013889.042.74$377
Aug 2023015080.522.67$401
Jul 2023014974.852.64$394
Jun 2023015868.962.26$357
May 2023015570.622.23$345
Apr 2023011478.122.24$255
Mar 2023011472.852.39$273
Feb 2023010275.112.47$252
Jan 2023011476.533.39$386
Dec 2022011076.415.73$630
Nov 2022011085.005.65$621
Oct 2022011387.185.86$663
Sep 2022011084.888.16$898
Aug 2022012294.529.13$1,114
Jul 20220123101.587.54$928
Jun 20220118115.097.98$941
May 20220127109.378.43$1,071
Apr 20220102104.226.84$697
Mar 20220107108.885.08$543
Feb 202209691.054.86$466
Jan 2022010581.844.54$476
Dec 2021010471.323.90$406
Nov 2021010077.435.24$524
Oct 2021010579.795.71$600
Sep 2021010669.865.35$567
Aug 2021011266.024.22$473
Jul 2021011470.783.98$454
Jun 2021011769.493.38$396
May 2021010663.483.02$320
Apr 2021011860.362.76$325
Mar 2021010161.302.72$274
Feb 2021011957.805.55$660
Jan 2021013850.412.81$388
Dec 2020010744.642.68$286
Nov 2020011538.772.71$311
Oct 2020012236.972.48$302
Sep 2020010437.091.99$207
Aug 2020011439.982.39$272
Jul 2020011638.371.83$212
Jun 2020011634.901.69$196
May 2020012216.921.81$221
Apr 2020013614.751.80$245
Mar 2020013830.341.86$256
Feb 2020013349.881.98$263
Jan 2020014357.252.09$300
Dec 2019015059.012.30$346
Nov 2019015055.302.75$413
Oct 2019011653.472.42$281
Sep 2019014955.052.66$396
Aug 2019015753.112.30$362
Jul 2019014656.272.46$359
Jun 2019015752.782.49$391
May 2019014458.482.74$395
Apr 2019012762.632.75$349
Mar 2019010456.803.06$318
Feb 2019012750.852.79$355
Jan 201908746.033.23$281
Dec 2018013146.594.19$548
Nov 2018012652.934.24$534
Oct 2018014261.443.40$483
Sep 2018016859.543.11$522
Aug 201809959.403.07$304
Jul 2018014265.142.93$416
Jun 2018013960.183.08$428
May 2018014465.382.90$418
Apr 2018014163.842.90$409
Mar 2018014661.222.79$407
Feb 2018013661.782.77$376
Jan 2018016062.874.01$641
Dec 2017018157.272.92$529
Nov 2017015155.423.12$471
Oct 2017015349.292.98$457
Sep 2017015847.523.09$488
Aug 2017014045.373.00$421
Jul 2017016343.873.09$503
Jun 2017014042.493.09$432
May 2017012845.373.26$418
Apr 2017014547.933.21$466
Mar 2017014246.772.98$424
Feb 2017013950.452.95$410
Jan 2017015549.413.42$530
Dec 2016015548.763.72$577
Nov 2016015142.492.64$399
Oct 2016015846.193.09$488
Sep 2016015441.553.10$478
Aug 2016015641.442.92$456
Jul 2016017041.622.92$497
Jun 2016010245.352.69$274
May 2016015342.521.99$305
Apr 2016014336.561.99$285
Mar 2016015533.011.79$278
Feb 2016014726.472.06$303
Jan 2016015027.352.36$355
Dec 2015014632.362.00$292
Nov 2015014938.792.17$323
Oct 2015015443.552.43$374
Sep 2015014542.992.76$400
Aug 2015015540.162.87$445
Jul 2015017148.152.95$504
Jun 2015016956.152.88$487
May 2015017255.212.96$508
Apr 2015016749.822.71$452
Mar 2015017642.892.93$517
Feb 2015016144.662.98$479
Jan 2015018543.433.10$574
Dec 2014017254.693.59$618
Nov 2014017270.464.25$731
Oct 2014017278.303.90$671
Sep 2014016386.164.05$659
Aug 2014017289.394.04$694
Jul 2014017196.564.18$715
Jun 2014016798.164.74$791
May 2014017694.734.73$832
Apr 2014016695.944.81$798
Mar 2014017695.895.06$890
Feb 2014016297.406.19$1,003
Jan 2014018690.404.86$904
Dec 2013017991.824.35$779
Nov 2013016788.853.74$624
Oct 2013019697.423.78$741
Sep 20130174104.113.72$647
Aug 20130182104.253.52$641
Jul 20130186102.523.72$692
Jun 2013020294.403.93$795
May 2013018994.834.15$784
Apr 2013018393.964.28$784
Mar 2013020793.623.91$810
Feb 2013018791.233.42$640
Jan 2013021791.603.42$742
Dec 2012028586.773.42$975
Nov 201202286.953.62$80
Oct 2012015289.383.40$517
Sep 2012014594.672.92$423
Aug 2012015192.662.91$439
Jul 2012015185.133.02$456
Jun 2012014179.822.52$355
May 2012014791.612.49$366
Apr 20120147101.652.00$294
Mar 20120157105.052.22$349
Feb 20120175101.102.57$450
Jan 2012019198.092.73$522
Dec 2011018996.873.24$612
Nov 2011019295.723.31$636
Oct 2011019084.983.65$693
Sep 2011019483.623.99$773
Aug 2011020383.404.15$842
Jul 2011019294.144.52$867
Jun 2011019992.904.64$923
May 2011016698.134.40$731
Apr 20110175105.964.33$758
Mar 2011016796.364.06$678
Feb 2011018385.644.18$765
Jan 2011021386.504.59$977
Dec 2010019785.734.35$857
Nov 2010019180.843.80$725
Oct 2010018278.103.51$639
Sep 2010023872.633.98$947
Aug 2010027173.684.42$1,198
Jul 2010023272.554.74$1,099
Jun 2010021070.364.91$1,031
May 2010023271.124.24$983
Apr 2010022981.694.12$944
Mar 2010031178.394.39$1,365
Feb 2010028873.585.44$1,567
Jan 2010053174.365.96$3,167
Dec 2009033271.445.48$1,821
Nov 2009035174.593.75$1,317
Oct 2009029172.544.11$1,196
Sep 2009019265.543.06$588
Aug 2009020367.423.22$653
Jul 2009020861.133.46$721
Jun 2009020566.163.90$798
May 2009021654.743.93$848
Apr 2009021246.773.59$761
Mar 2009021542.144.06$873
Feb 2009031232.814.63$1,446
Jan 2009032435.865.37$1,740
Dec 2008036037.105.98$2,152
Nov 2008027655.496.86$1,893
Oct 2008036675.246.92$2,533
Sep 20080272101.767.88$2,143
Aug 20080304114.228.48$2,579
Jul 20080316131.0811.39$3,599
Jun 20080348131.3313.03$4,535
May 20080382123.1711.57$4,421
Apr 20080331110.3110.45$3,461
Mar 20080362101.909.66$3,498
Feb 2008033192.538.77$2,903
Jan 2008034490.388.21$2,823
Dec 2007022488.337.30$1,636
Nov 2007029891.677.29$2,173
Oct 2007035582.856.92$2,457
Sep 2007034675.846.24$2,160
Aug 2007034969.066.39$2,229
Jul 2007040370.906.39$2,574
Jun 2007038462.007.55$2,899
May 2007044458.747.85$3,484
Apr 2007041259.617.81$3,216
Mar 2007041656.927.30$3,038
Feb 2007052255.108.22$4,289
Jan 2007055850.306.73$3,754
Dec 2006071056.656.92$4,912
Nov 2006046654.207.62$3,550
Oct 2006065154.906.01$3,915
Sep 2006075960.085.04$3,823
Aug 2006080968.717.34$5,938
Jul 2006067269.376.34$4,262
Jun 2006050366.286.38$3,211
May 2006049866.016.42$3,200
Apr 2006058564.397.36$4,306
Mar 2006055756.707.08$3,945
Feb 2006053357.597.75$4,131
Jan 2006037660.598.93$3,359
Dec 2005043954.9413.42$5,889
Nov 2005049054.6910.59$5,188
Oct 2005060158.3413.80$8,291
Sep 2005055561.4512.08$6,704
Aug 2005074161.519.80$7,259
Jul 2005058855.697.84$4,612
Jun 2005051952.337.38$3,831
May 2005059645.226.65$3,964
Apr 2005048249.207.36$3,548
Mar 2005056850.377.15$4,064
Feb 2005058445.226.31$3,686
Jan 2005038443.166.32$2,428
Dec 2004033439.866.75$2,255
Nov 2004071045.286.33$4,495
Oct 2004036049.706.52$2,345
Sep 2004055043.245.28$2,906
Aug 2004069742.375.55$3,869
Jul 2004065138.286.08$3,961
Jun 2004081736.106.43$5,256
May 2004075037.486.49$4,871
Apr 2004045734.475.86$2,677
Mar 2004046634.365.53$2,577
Feb 2004066032.455.51$3,636
Jan 2004076732.036.30$4,832
Dec 2003059830.266.30$3,768
Nov 2003053128.804.60$2,440
Oct 2003064828.174.76$3,084
Sep 2003068526.314.75$3,253
Aug 2003071429.765.13$3,663
Jul 2003063529.415.17$3,283
Jun 2003064528.565.98$3,859
May 2003061026.595.97$3,643
Apr 2003077826.675.41$4,207
Mar 2003073731.146.10$4,493
Feb 2003072333.487.93$5,730
Jan 200301,02630.315.58$5,727
Dec 2002085226.914.85$4,135
Nov 2002087824.664.14$3,632
Oct 2002084926.464.23$3,591
Sep 2002086127.443.64$3,130
Aug 200201,00525.963.16$3,180
Jul 200201,00324.583.06$3,071
Jun 2002093723.733.34$3,128
May 2002094424.663.58$3,383
Apr 2002092823.653.51$3,259
Mar 2002093222.003.10$2,892
Feb 2002086118.222.38$2,045
Jan 2002092817.172.38$2,205
Dec 200101,03416.932.36$2,445
Nov 200101,01818.072.41$2,449
Oct 2001093719.782.53$2,370
Sep 2001093624.262.25$2,107
Aug 2001095924.873.05$2,928
Jul 2001090723.933.20$2,900
Jun 2001089824.563.82$3,434
May 200101,02325.524.31$4,406
Apr 200101,05524.685.34$5,629
Mar 200101,08924.545.38$5,855
Feb 200101,05727.755.77$6,096
Jan 200101,26227.478.40$10,599
Dec 200001,19726.889.12$10,920
Nov 200001,22432.215.66$6,925
Oct 200001,51431.235.15$7,790
Sep 200001,45931.875.19$7,567
Aug 200001,61629.644.54$7,338
Jul 200001,51528.534.09$6,196
Jun 200001,49129.304.40$6,556
May 200001,81427.263.68$6,675
Apr 200001,90924.513.12$5,948
Mar 200001,96928.422.86$5,631
Feb 200001,79527.622.73$4,894
Jan 200001,93925.272.48$4,810
Dec 199901,99124.282.42$4,826
Nov 199901,77223.192.43$4,313
Oct 199901,86020.982.80$5,215
Sep 199901,76821.752.62$4,630
Aug 199901,94419.262.88$5,590
Jul 199901,59117.892.37$3,774
Jun 199901,61915.942.36$3,824
May 199901,85015.792.32$4,294
Apr 199901,50415.102.21$3,321
Mar 199901,63912.471.84$3,013
Feb 199901,5779.981.82$2,867
Jan 199901,91010.381.90$3,629
Dec 199801,9939.201.77$3,534
Nov 199802,09510.892.19$4,579
Oct 199802,24112.421.97$4,413
Sep 199802,00912.592.08$4,184
Aug 199802,01511.301.91$3,843
Jul 199802,10111.742.24$4,701
Jun 199802,15111.242.24$4,812
May 199802,34512.622.21$5,174
Apr 199802,19513.042.51$5,499
Mar 199802,84912.802.31$6,580
Feb 199802,86813.952.30$6,594
Jan 199802,94314.702.15$6,342
Dec 199702,91016.322.41$7,016
Nov 199703,06918.193.09$9,478
Oct 199703,24619.253.15$10,224
Sep 199703,19517.742.95$9,441
Aug 199704,13517.862.55$10,564
Jul 199704,94117.582.25$11,102
Jun 199706,19617.242.26$13,986
May 199701,51718.972.31$3,502
Apr 1997079617.882.08$1,658
Mar 19970018.951.94$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  118 Mcf  × $  3.05 =       $359

────────────────────────────────────────────────────
Month total                                     $359

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/163276 is the state's own key, not one this site invented.