MAYER, EDWIN S. JR. "S"

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 170676District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$429 k
Sep 1998 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
333
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111998-12-03139841
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16 bbl$819
GasProduction91,329 Mcf$428,352
Total$429,171

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6415, -100.8299. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64153, -100.82986 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,250 ft.

Completions filed
Sep 1998
1 of 1 wells

1 well

42-4353487248,250 ftSep 1998

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (333)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

333 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 202401180.301.55$17
Feb 202402076.091.78$36
Jan 202402073.023.30$66
Dec 202302171.262.61$55
Nov 202302177.892.81$59
Oct 202301985.443.09$59
Sep 202301689.042.74$44
Aug 202302080.522.67$53
Jul 202301874.852.64$48
Jun 202301668.962.26$36
May 202301670.622.23$36
Apr 202301678.122.24$36
Mar 202301872.852.39$43
Feb 202301775.112.47$42
Jan 202302176.533.39$71
Dec 202201876.415.73$103
Nov 20220885.005.65$45
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20211071.323.90$71
Nov 20210077.435.24$0
Oct 20211079.795.71$80
Sep 20210069.865.35$0
Aug 20213066.024.22$198
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20151032.362.00$32
Nov 20150038.792.17$0
Oct 20151043.552.43$44
Sep 20153042.992.76$129
Aug 20153340.162.87$129
Jul 20153948.152.95$171
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130297.423.78$8
Sep 201305104.113.72$19
Aug 2013012104.253.52$42
Jul 2013090102.523.72$335
Jun 201308994.403.93$350
May 201307794.834.15$319
Apr 2013014193.964.28$604
Mar 201305093.623.91$196
Feb 201306591.233.42$222
Jan 2013013991.603.42$475
Dec 201205586.773.42$188
Nov 201207586.953.62$272
Oct 2012012589.383.40$425
Sep 2012012894.672.92$374
Aug 2012013992.662.91$404
Jul 2012011685.133.02$350
Jun 2012012579.822.52$315
May 201208091.612.49$199
Apr 2012065101.652.00$130
Mar 2012093105.052.22$207
Feb 20120111101.102.57$285
Jan 201209698.092.73$262
Dec 201108996.873.24$288
Nov 2011010495.723.31$344
Oct 201104084.983.65$146
Sep 2011011283.623.99$446
Aug 2011010783.404.15$444
Jul 201103694.144.52$163
Jun 201103492.904.64$158
May 201106798.134.40$295
Apr 2011034105.964.33$147
Mar 201101296.364.06$49
Feb 201106885.644.18$284
Jan 201106086.504.59$275
Dec 2010011885.734.35$513
Nov 201008780.843.80$330
Oct 2010011278.103.51$393
Sep 201008672.633.98$342
Aug 2010011473.684.42$504
Jul 2010014572.554.74$687
Jun 2010012870.364.91$629
May 2010015271.124.24$644
Apr 2010011781.694.12$482
Mar 2010015178.394.39$663
Feb 2010015573.585.44$844
Jan 2010012974.365.96$769
Dec 200909271.445.48$505
Nov 200909874.593.75$368
Oct 2009023572.544.11$966
Sep 2009025365.543.06$775
Aug 2009021267.423.22$682
Jul 2009018461.133.46$637
Jun 2009014166.163.90$549
May 2009024754.743.93$970
Apr 2009023046.773.59$825
Mar 2009025742.144.06$1,043
Feb 2009024732.814.63$1,144
Jan 2009032435.865.37$1,740
Dec 2008023937.105.98$1,429
Nov 200809155.496.86$624
Oct 200807075.246.92$485
Sep 20080155101.767.88$1,221
Aug 20080261114.228.48$2,214
Jul 20080143131.0811.39$1,629
Jun 20080252131.3313.03$3,284
May 20080267123.1711.57$3,090
Apr 20080314110.3110.45$3,283
Mar 20080253101.909.66$2,445
Feb 2008028692.538.77$2,508
Jan 2008043390.388.21$3,553
Dec 2007050388.337.30$3,673
Nov 2007039491.677.29$2,873
Oct 2007041082.856.92$2,838
Sep 2007028275.846.24$1,761
Aug 2007024069.066.39$1,533
Jul 2007037870.906.39$2,415
Jun 2007039162.007.55$2,951
May 2007055358.747.85$4,339
Apr 2007048959.617.81$3,817
Mar 2007043056.927.30$3,140
Feb 2007042155.108.22$3,459
Jan 2007042450.306.73$2,852
Dec 2006030556.656.92$2,110
Nov 2006038254.207.62$2,910
Oct 2006044354.906.01$2,664
Sep 2006053960.085.04$2,715
Aug 2006045968.717.34$3,369
Jul 2006048269.376.34$3,057
Jun 2006031866.286.38$2,030
May 2006026966.016.42$1,728
Apr 2006042364.397.36$3,113
Mar 2006049356.707.08$3,492
Feb 2006047057.597.75$3,643
Jan 2006053260.598.93$4,753
Dec 2005038854.9413.42$5,205
Nov 2005049954.6910.59$5,284
Oct 2005048358.3413.80$6,663
Sep 2005047361.4512.08$5,713
Aug 2005056261.519.80$5,506
Jul 2005043855.697.84$3,436
Jun 2005031752.337.38$2,340
May 2005045045.226.65$2,993
Apr 2005030249.207.36$2,223
Mar 2005040550.377.15$2,898
Feb 2005032545.226.31$2,051
Jan 2005050143.166.32$3,167
Dec 2004054139.866.75$3,652
Nov 2004046345.286.33$2,931
Oct 2004048449.706.52$3,153
Sep 2004048843.245.28$2,579
Aug 2004051442.375.55$2,853
Jul 2004049138.286.08$2,987
Jun 2004034536.106.43$2,219
May 2004048437.486.49$3,143
Apr 2004046934.475.86$2,748
Mar 2004044034.365.53$2,433
Feb 2004051532.455.51$2,837
Jan 2004046932.036.30$2,955
Dec 2003038230.266.30$2,407
Nov 2003049328.804.60$2,265
Oct 2003054228.174.76$2,580
Sep 2003061626.314.75$2,926
Aug 2003064929.765.13$3,329
Jul 2003072529.415.17$3,749
Jun 2003048228.565.98$2,884
May 2003060926.595.97$3,637
Apr 2003043726.675.41$2,363
Mar 2003033731.146.10$2,054
Feb 2003074033.487.93$5,865
Jan 200301,06430.315.58$5,939
Dec 2002088626.914.85$4,300
Nov 2002092124.664.14$3,810
Oct 2002097426.464.23$4,119
Sep 2002092727.443.64$3,370
Aug 200201,18025.963.16$3,734
Jul 200201,18624.583.06$3,631
Jun 2002087423.733.34$2,918
May 2002019424.663.58$695
Apr 2002089023.653.51$3,126
Mar 2002095122.003.10$2,951
Feb 2002037018.222.38$879
Jan 2002095017.172.38$2,257
Dec 2001053616.932.36$1,267
Nov 2001039218.072.41$943
Oct 2001059919.782.53$1,515
Sep 2001061524.262.25$1,385
Aug 2001067424.873.05$2,058
Jul 2001060323.933.20$1,928
Jun 2001058724.563.82$2,245
May 2001084125.524.31$3,622
Apr 200101,03424.685.34$5,517
Mar 200101,12624.545.38$6,054
Feb 2001097527.755.77$5,623
Jan 200101,08527.478.40$9,113
Dec 2000091226.889.12$8,320
Nov 200001,07432.215.66$6,077
Oct 200001,09831.235.15$5,650
Sep 200001,02831.875.19$5,332
Aug 200001,20229.644.54$5,458
Jul 200001,25228.534.09$5,120
Jun 200001,24029.304.40$5,453
May 200001,34727.263.68$4,957
Apr 200001,28724.513.12$4,010
Mar 200001,38328.422.86$3,955
Feb 200001,27327.622.73$3,471
Jan 200001,22725.272.48$3,044
Dec 199901,32124.282.42$3,202
Nov 199901,31423.192.43$3,198
Oct 199901,31320.982.80$3,681
Sep 199901,01521.752.62$2,658
Aug 199901,09819.262.88$3,157
Jul 199901,22617.892.37$2,909
Jun 199901,04915.942.36$2,478
May 199901,10315.792.32$2,560
Apr 199901,06215.102.21$2,345
Mar 199901,26212.471.84$2,320
Feb 199901,1709.981.82$2,127
Jan 199901,22510.381.90$2,327
Dec 199801,3639.201.77$2,417
Nov 199801,65010.892.19$3,606
Oct 199801,92312.421.97$3,787
Sep 1998086312.592.08$1,797

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 80.30 =         $0
Gas                   11 Mcf  × $  1.55 =        $17

────────────────────────────────────────────────────
Month total                                      $17

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/170676 is the state's own key, not one this site invented.