MAYER RANCH N 13

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 243947District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
May 2007 – May 2026
Value, last 12 filed months
$472
at the published price for each month
Months reported
229
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-24179271
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition68 bbl$3,443
GasProduction224,454 Mcf$1,228,413
Total$1,231,855

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6422, -100.8337. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.64218, -100.83365 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,125 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,125 ft.

Completions filed
May 2007
1 of 1 wells

1 well

42-4353845938,125 ftMay 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (229)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

229 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250156.664.41$4
Nov 20250158.593.93$4
Oct 202501359.383.30$43
Sep 202502062.743.08$62
Aug 202503063.933.01$90
Jul 202503466.743.32$113
Jun 202505066.483.13$156
May 2025016360.553.23$527
Apr 2025023062.363.54$815
Mar 2025023367.704.27$995
Feb 2025020770.884.34$899
Jan 2025023474.324.28$1,001
Dec 2024023668.993.12$737
Nov 2024022369.052.20$490
Oct 2024023771.372.28$541
Sep 2024023569.612.36$556
Aug 2024025175.632.06$518
Jul 2024025679.932.15$550
Jun 2024025378.082.63$666
May 2024026678.812.20$585
Apr 2024027084.451.66$448
Mar 2024027780.301.55$428
Feb 2024027876.091.78$496
Jan 2024030773.023.30$1,012
Dec 2023031771.262.61$828
Nov 2023032177.892.81$901
Oct 2023034885.443.09$1,074
Sep 2023035389.042.74$965
Aug 2023036680.522.67$978
Jul 2023037774.852.64$996
Jun 2023037568.962.26$847
May 2023039670.622.23$882
Apr 2023039478.122.24$882
Mar 2023041972.852.39$1,003
Feb 2023038775.112.47$954
Jan 2023044576.533.39$1,508
Dec 2022046776.415.73$2,675
Nov 2022048185.005.65$2,716
Oct 2022053587.185.86$3,137
Sep 2022053584.888.16$4,368
Aug 2022060894.529.13$5,549
Jul 20220641101.587.54$4,834
Jun 20220664115.097.98$5,297
May 20220628109.378.43$5,296
Apr 20220145104.226.84$991
Mar 20220152108.885.08$772
Feb 2022014191.054.86$685
Jan 2022015981.844.54$721
Dec 2021016671.323.90$647
Nov 2021016777.435.24$875
Oct 2021016779.795.71$954
Sep 2021016669.865.35$888
Aug 2021017466.024.22$734
Jul 2021018070.783.98$717
Jun 2021017569.493.38$592
May 2021119463.483.02$649
Apr 2021017360.362.76$477
Mar 2021017861.302.72$484
Feb 2021014757.805.55$816
Jan 2021018750.412.81$526
Dec 2020018944.642.68$506
Nov 2020019138.772.71$517
Oct 2020019436.972.48$481
Sep 2020019037.091.99$378
Aug 2020019739.982.39$470
Jul 2020020638.371.83$376
Jun 2020019734.901.69$333
May 2020020716.921.81$376
Apr 2020020614.751.80$372
Mar 2020021430.341.86$397
Feb 2020020949.881.98$414
Jan 2020021957.252.09$459
Dec 2019022459.012.30$516
Nov 2019021755.302.75$597
Oct 2019023253.472.42$561
Sep 2019025655.052.66$680
Aug 2019020253.112.30$465
Jul 2019020856.272.46$512
Jun 2019020952.782.49$521
May 2019024258.482.74$663
Apr 2019023862.632.75$655
Mar 2019024556.803.06$750
Feb 2019022950.852.79$639
Jan 2019025246.033.23$814
Dec 2018023246.594.19$971
Nov 2018022952.934.24$970
Oct 2018021261.443.40$720
Sep 2018023359.543.11$724
Aug 2018025459.403.07$779
Jul 2018023765.142.93$695
Jun 2018024860.183.08$763
May 2018127165.382.90$852
Apr 2018029463.842.90$853
Mar 2018030461.222.79$847
Feb 2018127261.782.77$814
Jan 2018029962.874.01$1,199
Dec 2017130957.272.92$960
Nov 2017130355.423.12$1,000
Oct 2017232649.292.98$1,071
Sep 2017131947.523.09$1,032
Aug 2017133845.373.00$1,061
Jul 2017134243.873.09$1,100
Jun 2017134642.493.09$1,111
May 2017234345.373.26$1,210
Apr 2017134547.933.21$1,156
Mar 2017137246.772.98$1,157
Feb 2017234550.452.95$1,120
Jan 2017238549.413.42$1,415
Dec 2016140348.763.72$1,549
Nov 2016239142.492.64$1,119
Oct 2016141546.193.09$1,329
Sep 2016140741.553.10$1,304
Aug 2016143141.442.92$1,302
Jul 2016245141.622.92$1,402
Jun 2016246245.352.69$1,332
May 2016248842.521.99$1,057
Apr 2016349136.561.99$1,087
Mar 2016350833.011.79$1,010
Feb 2016350326.472.06$1,117
Jan 2016255227.352.36$1,360
Dec 2015255132.362.00$1,168
Nov 2015255038.792.17$1,270
Oct 2015257743.552.43$1,487
Sep 2015358242.992.76$1,734
Aug 2015159940.162.87$1,761
Jul 2015364948.152.95$2,056
Jun 2015065256.152.88$1,880
May 2015063655.212.96$1,880
Apr 2015055349.822.71$1,497
Mar 2015040142.892.93$1,177
Feb 2015261644.662.98$1,923
Jan 2015079443.433.10$2,462
Dec 2014080354.693.59$2,884
Nov 2014081370.464.25$3,457
Oct 2014088078.303.90$3,433
Sep 2014085886.164.05$3,471
Aug 2014095189.394.04$3,837
Jul 2014096996.564.18$4,050
Jun 2014076198.164.74$3,605
May 2014099794.734.73$4,712
Apr 201401,00695.944.81$4,838
Mar 2014096795.895.06$4,890
Feb 2014090297.406.19$5,585
Jan 201401,02990.404.86$5,002
Dec 2013096691.824.35$4,206
Nov 201301,00188.853.74$3,742
Oct 201301,08297.423.78$4,089
Sep 201301,053104.113.72$3,915
Aug 201301,056104.253.52$3,720
Jul 20130974102.523.72$3,621
Jun 201301,02894.403.93$4,044
May 2013098994.834.15$4,103
Apr 2013057793.964.28$2,471
Mar 2013089193.623.91$3,486
Feb 2013085791.233.42$2,931
Jan 201331,01091.603.42$3,729
Dec 201201,04086.773.42$3,557
Nov 201201,00186.953.62$3,629
Oct 201201,02889.383.40$3,495
Sep 2012091494.672.92$2,667
Aug 2012093992.662.91$2,731
Jul 201201,06885.133.02$3,226
Jun 2012092779.822.52$2,335
May 201201,12891.612.49$2,807
Apr 201201,202101.652.00$2,400
Mar 201201,370105.052.22$3,044
Feb 201201,291101.102.57$3,318
Jan 201201,20098.092.73$3,281
Dec 201101,20496.873.24$3,901
Nov 201101,26395.723.31$4,182
Oct 201101,17384.983.65$4,280
Sep 201121,17383.623.99$4,843
Aug 201101,35783.404.15$5,631
Jul 201101,43794.144.52$6,491
Jun 201151,41792.904.64$7,039
May 201101,56098.134.40$6,872
Apr 201101,451105.964.33$6,288
Mar 201101,80496.364.06$7,319
Feb 2011083085.644.18$3,469
Jan 2011094086.504.59$4,313
Dec 201001,01785.734.35$4,422
Nov 201001,07380.843.80$4,072
Oct 201001,27678.103.51$4,477
Sep 201011,51272.633.98$6,090
Aug 201001,30573.684.42$5,767
Jul 201001,51272.554.74$7,162
Jun 201001,28470.364.91$6,305
May 201001,55871.124.24$6,598
Apr 201001,90181.694.12$7,837
Mar 201001,89078.394.39$8,295
Feb 201001,75773.585.44$9,562
Jan 201002,01274.365.96$12,000
Dec 200901,87371.445.48$10,271
Nov 200901,97474.593.75$7,405
Oct 200902,11972.544.11$8,710
Sep 200902,00865.543.06$6,154
Aug 200902,07267.423.22$6,669
Jul 200902,29661.133.46$7,954
Jun 200902,25866.163.90$8,795
May 200902,34254.743.93$9,194
Apr 200902,42246.773.59$8,689
Mar 200902,57142.144.06$10,436
Feb 200902,53832.814.63$11,759
Jan 200902,77135.865.37$14,883
Dec 200802,91337.105.98$17,411
Nov 200802,95855.496.86$20,293
Oct 200802,99675.246.92$20,738
Sep 200803,025101.767.88$23,828
Aug 200803,353114.228.48$28,444
Jul 200803,616131.0811.39$41,184
Jun 200803,701131.3313.03$48,234
May 200804,266123.1711.57$49,376
Apr 200804,788110.3110.45$50,058
Mar 200803,220101.909.66$31,118
Feb 200803,35992.538.77$29,460
Jan 200803,85390.388.21$31,617
Dec 200703,91188.337.30$28,558
Nov 200704,31091.677.29$31,427
Oct 200704,94382.856.92$34,215
Sep 200705,63175.846.24$35,161
Aug 200706,17869.066.39$39,465
Jul 200707,49670.906.39$47,884
Jun 200709,59562.007.55$72,427
May 200702,83858.747.85$22,268

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 56.66 =         $0
Gas                    1 Mcf  × $  4.41 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well