FIELDS 19

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 191026District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$326 k
Mar 2002 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
291
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-10-29149458
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition95 bbl$5,956
GasProduction55,210 Mcf$319,855
Total$325,812

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5207, -100.6419. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52074, -100.64186 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,200 ft.

Completions filed
Mar 2002
1 of 1 wells

1 well

42-4353579596,200 ftMar 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (291)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

291 months

May 2026025106.413.05$76
Apr 202602198.932.87$60
Mar 202603189.753.15$98
Feb 202603063.503.75$113
Jan 202602859.138.00$224
Dec 202502656.664.41$115
Nov 202502958.593.93$114
Oct 202503159.383.30$102
Sep 202501462.743.08$43
Aug 20250663.933.01$18
Jul 20250566.743.32$17
Jun 202502566.483.13$78
May 202501660.553.23$52
Apr 20250562.363.54$18
Mar 202501467.704.27$60
Feb 20250970.884.34$39
Jan 202501774.324.28$73
Dec 20240868.993.12$25
Nov 20240969.052.20$20
Oct 20240571.372.28$11
Sep 20240669.612.36$14
Aug 20240175.632.06$2
Jul 20240779.932.15$15
Jun 20240178.082.63$3
May 202401078.812.20$22
Apr 202401384.451.66$22
Mar 202401680.301.55$25
Feb 202401676.091.78$29
Jan 202402073.023.30$66
Dec 202303671.262.61$94
Nov 20230077.892.81$0
Oct 202301685.443.09$49
Sep 202304589.042.74$123
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 202304568.962.26$102
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 202202085.005.65$113
Oct 202201087.185.86$59
Sep 20220784.888.16$57
Aug 20220094.529.13$0
Jul 2022013101.587.54$98
Jun 2022019115.097.98$152
May 2022017109.378.43$143
Apr 2022032104.226.84$219
Mar 2022025108.885.08$127
Feb 202202291.054.86$107
Jan 202205981.844.54$268
Dec 202102471.323.90$94
Nov 202102677.435.24$136
Oct 202102879.795.71$160
Sep 202103269.865.35$171
Aug 202102566.024.22$106
Jul 202102970.783.98$115
Jun 202103769.493.38$125
May 202103363.483.02$100
Apr 202102160.362.76$58
Mar 202102061.302.72$54
Feb 202102157.805.55$117
Jan 202102950.412.81$82
Dec 202004144.642.68$110
Nov 202002238.772.71$60
Oct 202003236.972.48$79
Sep 202003337.091.99$66
Aug 202002639.982.39$62
Jul 202002138.371.83$38
Jun 202005134.901.69$86
May 202003016.921.81$54
Apr 202002214.751.80$40
Mar 202003730.341.86$69
Feb 202007249.881.98$143
Jan 20200157.252.09$2
Dec 201903759.012.30$85
Nov 201905355.302.75$146
Oct 201904653.472.42$111
Sep 20190055.052.66$0
Aug 201904153.112.30$94
Jul 201906256.272.46$153
Jun 201905652.782.49$140
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201903056.803.06$92
Feb 201905650.852.79$156
Jan 201901446.033.23$45
Dec 20180046.594.19$0
Nov 201803552.934.24$148
Oct 201803761.443.40$126
Sep 201801759.543.11$53
Aug 201803859.403.07$117
Jul 201801465.142.93$41
Jun 201805160.183.08$157
May 201802165.382.90$61
Apr 201804763.842.90$136
Mar 201805861.222.79$162
Feb 20180061.782.77$0
Jan 20180462.874.01$16
Dec 201703157.272.92$91
Nov 20170155.423.12$3
Oct 201704449.292.98$131
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 201703842.493.09$117
May 20170045.373.26$0
Apr 201702647.933.21$84
Mar 201702846.772.98$84
Feb 201705550.452.95$162
Jan 201701649.413.42$55
Dec 201603348.763.72$123
Nov 201603142.492.64$82
Oct 201605046.193.09$155
Sep 201604341.553.10$133
Aug 201605241.442.92$152
Jul 201602441.622.92$70
Jun 201604445.352.69$118
May 201603142.521.99$62
Apr 201604336.561.99$86
Mar 201603033.011.79$54
Feb 201603826.472.06$78
Jan 201603327.352.36$78
Dec 201504332.362.00$86
Nov 201503838.792.17$82
Oct 201504243.552.43$102
Sep 201503042.992.76$83
Aug 201501740.162.87$49
Jul 201502548.152.95$74
Jun 201502856.152.88$81
May 201502855.212.96$83
Apr 201501949.822.71$51
Mar 201501042.892.93$29
Feb 201502544.662.98$74
Jan 201503043.433.10$93
Dec 201404354.693.59$154
Nov 20140670.464.25$26
Oct 201401878.303.90$70
Sep 201405486.164.05$218
Aug 201405989.394.04$238
Jul 201404196.564.18$171
Jun 201405398.164.74$251
May 201405094.734.73$236
Apr 201403995.944.81$188
Mar 201402695.895.06$131
Feb 201401197.406.19$68
Jan 201403190.404.86$151
Dec 201304291.824.35$183
Nov 201305088.853.74$187
Oct 201304797.423.78$178
Sep 2013061104.113.72$227
Aug 2013060104.253.52$211
Jul 2013057102.523.72$212
Jun 201306194.403.93$240
May 201306594.834.15$270
Apr 201305993.964.28$253
Mar 201306193.623.91$239
Feb 201305991.233.42$202
Jan 201306091.603.42$205
Dec 201206986.773.42$236
Nov 201207186.953.62$257
Oct 201204989.383.40$167
Sep 20120394.672.92$9
Aug 20120892.662.91$23
Jul 20120885.133.02$24
Jun 20120979.822.52$23
May 201204391.612.49$107
Apr 2012052101.652.00$104
Mar 2012053105.052.22$118
Feb 2012050101.102.57$129
Jan 201205498.092.73$148
Dec 201105096.873.24$162
Nov 201105295.723.31$172
Oct 201105584.983.65$201
Sep 201105383.623.99$211
Aug 201106183.404.15$253
Jul 201106194.144.52$276
Jun 201105692.904.64$260
May 201104798.134.40$207
Apr 2011045105.964.33$195
Mar 201104596.364.06$183
Feb 201103185.644.18$130
Jan 201103886.504.59$174
Dec 201003885.734.35$165
Nov 201004080.843.80$152
Oct 201004478.103.51$154
Sep 201005072.633.98$199
Aug 201005673.684.42$247
Jul 201005772.554.74$270
Jun 201005570.364.91$270
May 201005471.124.24$229
Apr 201004781.694.12$194
Mar 201004378.394.39$189
Feb 201003573.585.44$190
Jan 201004174.365.96$245
Dec 200904771.445.48$258
Nov 2009015574.593.75$581
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200908067.423.22$257
Jul 200908261.133.46$284
Jun 200908066.163.90$312
May 200908354.743.93$326
Apr 200907246.773.59$258
Mar 200908142.144.06$329
Feb 200907232.814.63$334
Jan 200908335.865.37$446
Dec 200808937.105.98$532
Nov 200808955.496.86$611
Oct 2008010175.246.92$699
Sep 2008071101.767.88$559
Aug 20080118114.228.48$1,001
Jul 20080118131.0811.39$1,344
Jun 20084120131.3313.03$2,089
May 20084104123.1711.57$1,696
Apr 200881,132110.3110.45$12,717
Mar 20081511101.909.66$5,040
Feb 2008137192.538.77$3,346
Jan 2008237090.388.21$3,217
Dec 2007232588.337.30$2,550
Nov 2007127991.677.29$2,126
Oct 2007122082.856.92$1,606
Sep 2007123275.846.24$1,524
Aug 2007123769.066.39$1,583
Jul 2007027370.906.39$1,744
Jun 2007232362.007.55$2,562
May 2007269958.747.85$5,602
Apr 2007269359.617.81$5,528
Mar 2007275856.927.30$5,649
Feb 2007367155.108.22$5,678
Jan 2007067450.306.73$4,534
Dec 200621,03856.656.92$7,295
Nov 200611,28854.207.62$9,866
Oct 2006132554.906.01$2,009
Sep 2006013060.085.04$655
Aug 2006113468.717.34$1,052
Jul 2006121969.376.34$1,458
Jun 2006219166.286.38$1,352
May 2006128566.016.42$1,897
Apr 2006229064.397.36$2,263
Mar 2006032456.707.08$2,295
Feb 2006133257.597.75$2,631
Jan 2006044560.598.93$3,975
Dec 2005144254.9413.42$5,985
Nov 2005459754.6910.59$6,540
Oct 2005084358.3413.80$11,630
Sep 2005270661.4512.08$8,651
Aug 2005288061.519.80$8,744
Jul 2005089355.697.84$7,004
Jun 2005260052.337.38$4,533
May 200531,01445.226.65$6,880
Apr 200531,02849.207.36$7,714
Mar 200531,07450.377.15$7,835
Feb 2005070245.226.31$4,431
Jan 2005054243.166.32$3,427
Dec 2004049439.866.75$3,335
Nov 2004036945.286.33$2,336
Oct 2004144549.706.52$2,949
Sep 2004283543.245.28$4,499
Aug 2004019942.375.55$1,105
Jul 2004014038.286.08$852
Jun 2004015836.106.43$1,016
May 2004018337.486.49$1,189
Apr 2004019534.475.86$1,142
Mar 2004019934.365.53$1,101
Feb 2004019032.455.51$1,047
Jan 2004020432.036.30$1,285
Dec 2003021430.266.30$1,349
Nov 2003022028.804.60$1,011
Oct 2003018728.174.76$890
Sep 2003021926.314.75$1,040
Aug 2003012829.765.13$657
Jul 2003038929.415.17$2,011
Jun 2003028628.565.98$1,711
May 2003024826.595.97$1,481
Apr 2003133926.675.41$1,860
Mar 2003147131.146.10$2,902
Feb 2003240633.487.93$3,285
Jan 2003167230.315.58$3,781
Dec 2002157826.914.85$2,832
Nov 2002249424.664.14$2,093
Oct 2002273226.464.23$3,149
Sep 2002296227.443.64$3,552
Aug 200221,78625.963.16$5,703
Jul 200201,49824.583.06$4,587
Jun 200261,73123.733.34$5,921
May 200203,55124.663.58$12,727
Apr 200235,72023.653.51$20,161
Mar 200201,02822.003.10$3,190

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   25 Mcf  × $  3.05 =        $76

────────────────────────────────────────────────────
Month total                                      $76

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/191026 is the state's own key, not one this site invented.