FIELDS 19

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 191035District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Jun 2002 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
288
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-10-29149454
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition346 bbl$16,884
GasProduction186,003 Mcf$1,020,035
Total$1,036,919

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5233, -100.6407. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52325, -100.64070 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,220 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,220 ft.

Completions filed
Jun 2002
1 of 1 wells

1 well

42-43535893166,220 ftJun 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (288)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

288 months

May 2026026106.413.05$79
Apr 202602998.932.87$83
Mar 202602889.753.15$88
Feb 202602163.503.75$79
Jan 202602859.138.00$224
Dec 202502856.664.41$124
Nov 202502758.593.93$106
Oct 202502459.383.30$79
Sep 202502862.743.08$86
Aug 202502163.933.01$63
Jul 202502666.743.32$86
Jun 202502766.483.13$84
May 202502760.553.23$87
Apr 202502062.363.54$71
Mar 202502667.704.27$111
Feb 202501670.884.34$69
Jan 202501274.324.28$51
Dec 202401768.993.12$53
Nov 20240069.052.20$0
Oct 202401871.372.28$41
Sep 202402369.612.36$54
Aug 20240375.632.06$6
Jul 202401579.932.15$32
Jun 202402778.082.63$71
May 20240578.812.20$11
Apr 20240084.451.66$0
Mar 20240180.301.55$2
Feb 20240876.091.78$14
Jan 202401473.023.30$46
Dec 20230771.262.61$18
Nov 202302177.892.81$59
Oct 202301785.443.09$52
Sep 202301989.042.74$52
Aug 202303180.522.67$83
Jul 202301174.852.64$29
Jun 202302768.962.26$61
May 202302770.622.23$60
Apr 202302678.122.24$58
Mar 202301872.852.39$43
Feb 202303875.112.47$94
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220585.005.65$28
Oct 202202487.185.86$141
Sep 202203684.888.16$294
Aug 202202694.529.13$237
Jul 2022018101.587.54$136
Jun 2022027115.097.98$215
May 2022030109.378.43$253
Apr 2022036104.226.84$246
Mar 2022029108.885.08$147
Feb 202202891.054.86$136
Jan 202202881.844.54$127
Dec 202103071.323.90$117
Nov 202102577.435.24$131
Oct 202103079.795.71$171
Sep 202103069.865.35$161
Aug 202103166.024.22$131
Jul 202104570.783.98$179
Jun 202102569.493.38$85
May 202103063.483.02$91
Apr 202102260.362.76$61
Mar 202103061.302.72$82
Feb 202102857.805.55$155
Jan 202103450.412.81$96
Dec 202003444.642.68$91
Nov 202002838.772.71$76
Oct 202003836.972.48$94
Sep 202003037.091.99$60
Aug 202002539.982.39$60
Jul 202003038.371.83$55
Jun 202003734.901.69$63
May 202003116.921.81$56
Apr 202002814.751.80$51
Mar 202002730.341.86$50
Feb 202003549.881.98$69
Jan 202002857.252.09$59
Dec 201902359.012.30$53
Nov 201903455.302.75$94
Oct 201902753.472.42$65
Sep 201902455.052.66$64
Aug 201903253.112.30$74
Jul 201901956.272.46$47
Jun 201903152.782.49$77
May 201902558.482.74$69
Apr 201902262.632.75$61
Mar 201903556.803.06$107
Feb 201903550.852.79$98
Jan 201903646.033.23$116
Dec 201802346.594.19$96
Nov 201802552.934.24$106
Oct 201804861.443.40$163
Sep 20180059.543.11$0
Aug 201802159.403.07$64
Jul 201802165.142.93$62
Jun 201802360.183.08$71
May 201805565.382.90$160
Apr 20180063.842.90$0
Mar 201803861.222.79$106
Feb 201804361.782.77$119
Jan 201801662.874.01$64
Dec 201703457.272.92$99
Nov 201702355.423.12$72
Oct 201703549.292.98$104
Sep 201703447.523.09$105
Aug 201703745.373.00$111
Jul 201703443.873.09$105
Jun 201703342.493.09$102
May 201703345.373.26$108
Apr 201703647.933.21$116
Mar 201703246.772.98$95
Feb 201703450.452.95$100
Jan 201703949.413.42$133
Dec 201604148.763.72$153
Nov 201603342.492.64$87
Oct 201604246.193.09$130
Sep 201603041.553.10$93
Aug 201604341.442.92$126
Jul 201604241.622.92$123
Jun 201603245.352.69$86
May 201603442.521.99$68
Apr 201604636.561.99$92
Mar 201602333.011.79$41
Feb 201603726.472.06$76
Jan 201603327.352.36$78
Dec 201506432.362.00$128
Nov 201503738.792.17$80
Oct 201504143.552.43$99
Sep 201502242.992.76$61
Aug 201502340.162.87$66
Jul 201503448.152.95$100
Jun 201503856.152.88$110
May 201504155.212.96$121
Apr 201503049.822.71$81
Mar 201502642.892.93$76
Feb 201502844.662.98$83
Jan 201502443.433.10$74
Dec 201402954.693.59$104
Nov 20140870.464.25$34
Oct 201401878.303.90$70
Sep 201403286.164.05$129
Aug 201403589.394.04$141
Jul 201402896.564.18$117
Jun 201402898.164.74$133
May 201403194.734.73$147
Apr 201403495.944.81$164
Mar 201403795.895.06$187
Feb 201403197.406.19$192
Jan 201403390.404.86$160
Dec 201303591.824.35$152
Nov 201303588.853.74$131
Oct 201303497.423.78$129
Sep 2013038104.113.72$141
Aug 2013038104.253.52$134
Jul 2013040102.523.72$149
Jun 201303994.403.93$153
May 201304194.834.15$170
Apr 201304293.964.28$180
Mar 201304593.623.91$176
Feb 201304191.233.42$140
Jan 201304391.603.42$147
Dec 201205286.773.42$178
Nov 201207286.953.62$261
Oct 201207589.383.40$255
Sep 201207194.672.92$207
Aug 201207692.662.91$221
Jul 201207685.133.02$230
Jun 201207979.822.52$199
May 201208691.612.49$214
Apr 2012086101.652.00$172
Mar 2012060105.052.22$133
Feb 2012098101.102.57$252
Jan 2012011598.092.73$314
Dec 2011019396.873.24$625
Nov 2011020195.723.31$666
Oct 201105984.983.65$215
Sep 2011030183.623.99$1,200
Aug 2011049883.404.15$2,066
Jul 2011049094.144.52$2,213
Jun 2011050892.904.64$2,357
May 2011055798.134.40$2,453
Apr 20110544105.964.33$2,357
Mar 2011056996.364.06$2,309
Feb 2011044985.644.18$1,877
Jan 2011054786.504.59$2,510
Dec 2010045685.734.35$1,983
Nov 2010037380.843.80$1,416
Oct 2010032778.103.51$1,147
Sep 2010078672.633.98$3,128
Aug 2010091673.684.42$4,048
Jul 2010085972.554.74$4,069
Jun 2010088570.364.91$4,346
May 2010096971.124.24$4,104
Apr 2010096981.694.12$3,995
Mar 201001,11478.394.39$4,889
Feb 2010088373.585.44$4,806
Jan 2010069474.365.96$4,139
Dec 2009079971.445.48$4,382
Nov 200901,08374.593.75$4,063
Oct 200901,08872.544.11$4,472
Sep 200901,08265.543.06$3,316
Aug 200901,09567.423.22$3,524
Jul 2009039361.133.46$1,362
Jun 2009046666.163.90$1,815
May 2009093054.743.93$3,651
Apr 2009087846.773.59$3,150
Mar 2009099542.144.06$4,039
Feb 2009096332.814.63$4,462
Jan 2009079935.865.37$4,291
Dec 2008070237.105.98$4,196
Nov 2008092555.496.86$6,346
Oct 2008086175.246.92$5,960
Sep 20080377101.767.88$2,970
Aug 20080659114.228.48$5,590
Jul 20080916131.0811.39$10,433
Jun 200810995131.3313.03$14,281
May 200841,074123.1711.57$12,923
Apr 2008121,075110.3110.45$12,563
Mar 200841,197101.909.66$11,975
Feb 200851,16792.538.77$10,698
Jan 200871,37390.388.21$11,899
Dec 2007796188.337.30$7,636
Nov 2007496991.677.29$7,432
Oct 200731,22282.856.92$8,707
Sep 200721,10175.846.24$7,027
Aug 2007190369.066.39$5,837
Jul 2007044070.906.39$2,811
Jun 2007212662.007.55$1,075
May 2007264958.747.85$5,210
Apr 2007264259.617.81$5,130
Mar 2007266756.927.30$4,984
Feb 2007259155.108.22$4,966
Jan 2007056150.306.73$3,774
Dec 2006257056.656.92$4,057
Nov 2006273554.207.62$5,707
Oct 2006284354.906.01$5,179
Sep 2006280460.085.04$4,170
Aug 2006282568.717.34$6,193
Jul 2006277269.376.34$5,035
Jun 2006677966.286.38$5,371
May 2006384666.016.42$5,634
Apr 2006692964.397.36$7,224
Mar 2006094456.707.08$6,686
Feb 2006386757.597.75$6,893
Jan 2006091060.598.93$8,129
Dec 2005391054.9413.42$12,373
Nov 2005589154.6910.59$9,708
Oct 2005092958.3413.80$12,816
Sep 2005386861.4512.08$10,669
Aug 200531,08661.519.80$10,824
Jul 200501,08155.697.84$8,479
Jun 200531,08652.337.38$8,173
May 200531,22545.226.65$8,283
Apr 200531,23149.207.36$9,208
Mar 2005696950.377.15$7,235
Feb 2005090445.226.31$5,706
Jan 200511,02043.166.32$6,492
Dec 200401,28039.866.75$8,641
Nov 200441,65145.286.33$10,633
Oct 200441,55749.706.52$10,343
Sep 200481,52743.245.28$8,414
Aug 200401,60242.375.55$8,892
Jul 200451,99438.286.08$12,323
Jun 200452,06036.106.43$13,433
May 200452,14337.486.49$14,105
Apr 200492,04734.475.86$12,303
Mar 200452,10334.365.53$11,802
Feb 200462,12832.455.51$11,919
Jan 200473,24732.036.30$20,679
Dec 2003143,46230.266.30$22,240
Nov 200373,72328.804.60$17,309
Oct 200392,71728.174.76$13,185
Sep 200332,01226.314.75$9,635
Aug 200332,12929.765.13$11,010
Jul 200342,07629.415.17$10,852
Jun 200332,03628.565.98$12,267
May 200322,21326.595.97$13,271
Apr 2003122,24426.675.41$12,454
Mar 200394,96631.146.10$30,553
Feb 2003213,36433.487.93$27,366
Jan 2003156,15630.315.58$34,818
Dec 2002157,05326.914.85$34,637
Nov 2002167,31624.664.14$30,661
Oct 2002147,64126.464.23$32,685
Sep 200267,36527.443.64$26,938
Aug 200267,57825.963.16$24,134
Jul 2002011,15624.583.06$34,157
Jun 200205,09023.733.34$16,992

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   26 Mcf  × $  3.05 =        $79

────────────────────────────────────────────────────
Month total                                      $79

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/191035 is the state's own key, not one this site invented.