DAVIS "C"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192382District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$664 k
Jul 2002 – May 2026
Value, last 12 filed months
$642
at the published price for each month
Months reported
287
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-03-10150365
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition11 bbl$710
GasProduction124,482 Mcf$663,506
Total$664,216

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6634, -100.6649. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66340, -100.66494 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Jul 2002
1 of 1 wells

1 well

42-43535919296,300 ftJul 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (287)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

287 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 202601263.503.75$45
Jan 20260059.138.00$0
Dec 202501156.664.41$49
Nov 20250558.593.93$20
Oct 202502759.383.30$89
Sep 202503662.743.08$111
Aug 202502863.933.01$84
Jul 202503666.743.32$119
Jun 202504066.483.13$125
May 202504160.553.23$133
Apr 202504162.363.54$145
Mar 202503967.704.27$166
Feb 202503470.884.34$148
Jan 202503874.324.28$163
Dec 202404168.993.12$128
Nov 202404369.052.20$95
Oct 202414871.372.28$181
Sep 202404569.612.36$106
Aug 202404975.632.06$101
Jul 202404979.932.15$105
Jun 202404878.082.63$126
May 202405478.812.20$119
Apr 202405384.451.66$88
Mar 202405280.301.55$80
Feb 202405276.091.78$93
Jan 202405373.023.30$175
Dec 202305571.262.61$144
Nov 202305477.892.81$152
Oct 202305685.443.09$173
Sep 202305489.042.74$148
Aug 202306080.522.67$160
Jul 202306274.852.64$164
Jun 202306768.962.26$151
May 2023010570.622.23$234
Apr 202301878.122.24$40
Mar 202302772.852.39$65
Feb 202302275.112.47$54
Jan 202307976.533.39$268
Dec 202207476.415.73$424
Nov 202203485.005.65$192
Oct 202207087.185.86$410
Sep 20220284.888.16$16
Aug 20220694.529.13$55
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202205109.378.43$42
Apr 202204104.226.84$27
Mar 202205108.885.08$25
Feb 20220491.054.86$19
Jan 20220381.844.54$14
Dec 20210671.323.90$23
Nov 20210877.435.24$42
Oct 20210979.795.71$51
Sep 20210769.865.35$37
Aug 202101566.024.22$63
Jul 202101170.783.98$44
Jun 202102269.493.38$74
May 202102863.483.02$84
Apr 202104360.362.76$119
Mar 202106461.302.72$174
Feb 202105357.805.55$294
Jan 202106250.412.81$174
Dec 202007244.642.68$193
Nov 202006938.772.71$187
Oct 202007236.972.48$178
Sep 202006837.091.99$135
Aug 202007139.982.39$169
Jul 202008038.371.83$146
Jun 202006834.901.69$115
May 202008116.921.81$147
Apr 202007314.751.80$132
Mar 202009030.341.86$167
Feb 202008349.881.98$164
Jan 2020011857.252.09$247
Dec 2019017159.012.30$394
Nov 20190455.302.75$11
Oct 20190253.472.42$5
Sep 20190055.052.66$0
Aug 201901653.112.30$37
Jul 201903156.272.46$76
Jun 201905052.782.49$125
May 2019010058.482.74$274
Apr 201908062.632.75$220
Mar 201903956.803.06$119
Feb 201906250.852.79$173
Jan 2019010646.033.23$342
Dec 2018010846.594.19$452
Nov 2018010352.934.24$436
Oct 2018010961.443.40$370
Sep 2018010159.543.11$314
Aug 2018010059.403.07$307
Jul 2018011465.142.93$334
Jun 2018011660.183.08$357
May 2018012065.382.90$348
Apr 2018011663.842.90$336
Mar 2018012061.222.79$334
Feb 2018010761.782.77$296
Jan 2018012062.874.01$481
Dec 2017012357.272.92$359
Nov 2017045155.423.12$1,406
Oct 2017015749.292.98$468
Sep 2017018247.523.09$562
Aug 201709445.373.00$282
Jul 2017018543.873.09$571
Jun 2017019742.493.09$608
May 2017020145.373.26$656
Apr 2017019747.933.21$633
Mar 2017020546.772.98$612
Feb 2017018850.452.95$555
Jan 2017020549.413.42$701
Dec 2016215848.763.72$686
Nov 2016014342.492.64$378
Oct 2016018346.193.09$566
Sep 2016019641.553.10$608
Aug 2016020741.442.92$605
Jul 2016020741.622.92$605
Jun 2016020245.352.69$543
May 2016020842.521.99$414
Apr 2016019836.561.99$394
Mar 2016020733.011.79$371
Feb 2016019426.472.06$400
Jan 2016019927.352.36$471
Dec 2015020532.362.00$410
Nov 2015019338.792.17$418
Oct 2015019743.552.43$478
Sep 2015016742.992.76$461
Aug 2015014940.162.87$428
Jul 2015019148.152.95$563
Jun 2015016456.152.88$473
May 2015017555.212.96$517
Apr 2015014449.822.71$390
Mar 2015018942.892.93$555
Feb 2015010344.662.98$307
Jan 2015023143.433.10$716
Dec 2014218854.693.59$785
Nov 2014011070.464.25$468
Oct 2014013278.303.90$515
Sep 201403586.164.05$142
Aug 201407289.394.04$291
Jul 2014028396.564.18$1,183
Jun 2014026498.164.74$1,251
May 2014020194.734.73$950
Apr 201405695.944.81$269
Mar 201401795.895.06$86
Feb 2014020897.406.19$1,288
Jan 2014026890.404.86$1,303
Dec 2013026991.824.35$1,171
Nov 2013020088.853.74$748
Oct 201304597.423.78$170
Sep 2013065104.113.72$242
Aug 201305104.253.52$18
Jul 20130169102.523.72$628
Jun 2013018694.403.93$732
May 2013016894.834.15$697
Apr 2013019893.964.28$848
Mar 2013018393.623.91$716
Feb 2013019091.233.42$650
Jan 2013018991.603.42$646
Dec 2012013186.773.42$448
Nov 2012016686.953.62$602
Oct 2012023889.383.40$809
Sep 2012024194.672.92$703
Aug 2012020392.662.91$590
Jul 2012025785.133.02$776
Jun 2012022379.822.52$562
May 2012019591.612.49$485
Apr 20120249101.652.00$497
Mar 20120252105.052.22$560
Feb 20120255101.102.57$655
Jan 2012025498.092.73$694
Dec 2011025296.873.24$816
Nov 2011023395.723.31$772
Oct 2011018584.983.65$675
Sep 2011015783.623.99$626
Aug 2011013683.404.15$564
Jul 2011017194.144.52$772
Jun 2011024392.904.64$1,127
May 2011025298.134.40$1,110
Apr 20110216105.964.33$936
Mar 2011030696.364.06$1,242
Feb 2011027485.644.18$1,145
Jan 2011031086.504.59$1,423
Dec 2010030885.734.35$1,339
Nov 2010030380.843.80$1,150
Oct 2010031278.103.51$1,095
Sep 2010029972.633.98$1,190
Aug 2010230773.684.42$1,504
Jul 2010031372.554.74$1,483
Jun 2010027870.364.91$1,365
May 2010432071.124.24$1,640
Apr 2010033181.694.12$1,365
Mar 2010035078.394.39$1,536
Feb 2010028173.585.44$1,529
Jan 2010026174.365.96$1,557
Dec 2009026471.445.48$1,448
Nov 2009026774.593.75$1,002
Oct 2009028272.544.11$1,159
Sep 2009027265.543.06$834
Aug 2009028067.423.22$901
Jul 2009028561.133.46$987
Jun 2009027866.163.90$1,083
May 2009029354.743.93$1,150
Apr 2009028346.773.59$1,015
Mar 2009028142.144.06$1,141
Feb 2009024832.814.63$1,149
Jan 2009029735.865.37$1,595
Dec 2008035937.105.98$2,146
Nov 2008038255.496.86$2,621
Oct 2008036975.246.92$2,554
Sep 20080273101.767.88$2,150
Aug 20080321114.228.48$2,723
Jul 20080414131.0811.39$4,715
Jun 20080399131.3313.03$5,200
May 20080417123.1711.57$4,826
Apr 20080391110.3110.45$4,088
Mar 20080414101.909.66$4,001
Feb 2008038892.538.77$3,403
Jan 2008043090.388.21$3,528
Dec 2007043488.337.30$3,169
Nov 2007042691.677.29$3,106
Oct 2007044582.856.92$3,080
Sep 2007031975.846.24$1,992
Aug 2007041169.066.39$2,625
Jul 2007040270.906.39$2,568
Jun 2007039562.007.55$2,982
May 2007041158.747.85$3,225
Apr 2007034659.617.81$2,701
Mar 2007034756.927.30$2,534
Feb 2007032655.108.22$2,678
Jan 2007032150.306.73$2,159
Dec 2006040856.656.92$2,823
Nov 2006043054.207.62$3,276
Oct 2006050754.906.01$3,049
Sep 2006038560.085.04$1,939
Aug 2006042968.717.34$3,149
Jul 2006053369.376.34$3,381
Jun 2006053666.286.38$3,422
May 2006054966.016.42$3,527
Apr 2006053464.397.36$3,931
Mar 2006056856.707.08$4,023
Feb 2006051157.597.75$3,961
Jan 2006059460.598.93$5,306
Dec 2005058854.9413.42$7,888
Nov 2005078154.6910.59$8,270
Oct 2005081458.3413.80$11,230
Sep 2005070961.4512.08$8,564
Aug 2005071561.519.80$7,005
Jul 200501,03055.697.84$8,079
Jun 2005093052.337.38$6,864
May 2005072345.226.65$4,809
Apr 200501,67649.207.36$12,336
Mar 200501,24750.377.15$8,922
Feb 200501,37045.226.31$8,647
Jan 200501,78043.166.32$11,254
Dec 200401,31339.866.75$8,864
Nov 200401,45645.286.33$9,217
Oct 200401,61149.706.52$10,496
Sep 200401,38843.245.28$7,334
Aug 200401,66442.375.55$9,236
Jul 200401,48438.286.08$9,029
Jun 200401,36136.106.43$8,755
May 200401,53937.486.49$9,995
Apr 200401,08134.475.86$6,333
Mar 200401,78934.365.53$9,893
Feb 200401,43032.455.51$7,879
Jan 200401,68932.036.30$10,640
Dec 200301,87230.266.30$11,797
Nov 200302,03728.804.60$9,360
Oct 200301,59828.174.76$7,606
Sep 200302,02226.314.75$9,603
Aug 200301,49029.765.13$7,643
Jul 200301,82929.415.17$9,457
Jun 200301,48728.565.98$8,897
May 200302,42326.595.97$14,472
Apr 200302,09726.675.41$11,339
Mar 200301,91131.146.10$11,650
Feb 200302,37433.487.93$18,816
Jan 200303,07830.315.58$17,182
Dec 200203,70626.914.85$17,988
Nov 20020024.664.14$0
Oct 200205,41626.464.23$22,905
Sep 200204,98427.443.64$18,118
Aug 2002010,09725.963.16$31,949
Jul 200202,77224.583.06$8,487

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 63.50 =         $0
Gas                   12 Mcf  × $  3.75 =        $45

────────────────────────────────────────────────────
Month total                                      $45

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/192382 is the state's own key, not one this site invented.