DAVIS "C"

Operated by UPP OPERATING, LLC (P-5 875310) in the SONORA (CANYON UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192418District 7CField 846465002 tax incentive programmesCondensateGasSaveExport
Value, all time
$590 k
Nov 2002 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
283
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 959 leases and 959 wells, and the rule below applies to all of them.

Discovered
1954-05-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1993-09-13.

The Commission's schedule remark for this field reads: EFFECTIVE JAN 1; ANNUAL TESTING. ALL WELLS EXEMPT FROM SIWHP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-03-10150361
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$185
GasProduction98,912 Mcf$589,716
Total$589,901

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6605, -100.6615. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66047, -100.66147 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,106 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,106 ft.

Completions filed
Nov 2002
1 of 1 wells

1 well

42-43536040386,106 ftNov 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (283)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

283 months

May 2026034106.413.05$104
Apr 202603498.932.87$98
Mar 202603589.753.15$110
Feb 202603563.503.75$131
Jan 202603359.138.00$264
Dec 202503756.664.41$163
Nov 202503858.593.93$149
Oct 202503759.383.30$122
Sep 202503562.743.08$108
Aug 202503663.933.01$109
Jul 202503566.743.32$116
Jun 202504066.483.13$125
May 202502960.553.23$94
Apr 202503662.363.54$128
Mar 202503867.704.27$162
Feb 202503570.884.34$152
Jan 202503874.324.28$163
Dec 202403568.993.12$109
Nov 202403369.052.20$73
Oct 202423471.372.28$220
Sep 202403369.612.36$78
Aug 202403575.632.06$72
Jul 202403679.932.15$77
Jun 202403578.082.63$92
May 202403578.812.20$77
Apr 202403384.451.66$55
Mar 202402880.301.55$43
Feb 202402976.091.78$52
Jan 202403073.023.30$99
Dec 202303371.262.61$86
Nov 202303477.892.81$95
Oct 202303385.443.09$102
Sep 202303289.042.74$88
Aug 202303180.522.67$83
Jul 202303274.852.64$85
Jun 202303168.962.26$70
May 202303270.622.23$71
Apr 202303378.122.24$74
Mar 202303372.852.39$79
Feb 202303175.112.47$76
Jan 202303576.533.39$119
Dec 202203476.415.73$195
Nov 202204185.005.65$231
Oct 202202987.185.86$170
Sep 202203184.888.16$253
Aug 202203194.529.13$283
Jul 2022032101.587.54$241
Jun 2022029115.097.98$231
May 2022034109.378.43$287
Apr 2022041104.226.84$280
Mar 2022039108.885.08$198
Feb 202203591.054.86$170
Jan 202203681.844.54$163
Dec 202103671.323.90$140
Nov 202103477.435.24$178
Oct 202103579.795.71$200
Sep 202103369.865.35$177
Aug 202103466.024.22$144
Jul 202103470.783.98$135
Jun 202103369.493.38$112
May 202103563.483.02$106
Apr 202103560.362.76$97
Mar 202103761.302.72$101
Feb 202103157.805.55$172
Jan 202103750.412.81$104
Dec 202003544.642.68$94
Nov 202003538.772.71$95
Oct 202003536.972.48$87
Sep 202003337.091.99$66
Aug 202003339.982.39$79
Jul 202003338.371.83$60
Jun 202003334.901.69$56
May 202003516.921.81$64
Apr 202003514.751.80$63
Mar 202003730.341.86$69
Feb 202003549.881.98$69
Jan 202003857.252.09$80
Dec 201903759.012.30$85
Nov 201903555.302.75$96
Oct 201903553.472.42$85
Sep 201903255.052.66$85
Aug 201903253.112.30$74
Jul 201903356.272.46$81
Jun 201903352.782.49$82
May 201903758.482.74$101
Apr 201903662.632.75$99
Mar 201903956.803.06$119
Feb 201903550.852.79$98
Jan 201903846.033.23$123
Dec 201803946.594.19$163
Nov 201803852.934.24$161
Oct 201804461.443.40$150
Sep 201801559.543.11$47
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180265.382.90$6
Apr 201805163.842.90$148
Mar 201808861.222.79$245
Feb 201804061.782.77$111
Jan 201802962.874.01$116
Dec 201701657.272.92$47
Nov 20170555.423.12$16
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 201701242.493.09$37
May 201701945.373.26$62
Apr 201701947.933.21$61
Mar 201702846.772.98$84
Feb 201702550.452.95$74
Jan 201702949.413.42$99
Dec 201603248.763.72$119
Nov 201613042.492.64$122
Oct 201603146.193.09$96
Sep 201602941.553.10$90
Aug 201602941.442.92$85
Jul 201602541.622.92$73
Jun 201602045.352.69$54
May 201602242.521.99$44
Apr 201601936.561.99$38
Mar 201602533.011.79$45
Feb 201602626.472.06$54
Jan 201602727.352.36$64
Dec 201503332.362.00$66
Nov 201503238.792.17$69
Oct 201503443.552.43$83
Sep 201503242.992.76$88
Aug 201503340.162.87$95
Jul 201503948.152.95$115
Jun 201503056.152.88$86
May 201504155.212.96$121
Apr 201503549.822.71$95
Mar 201504742.892.93$138
Feb 201504044.662.98$119
Jan 201503343.433.10$102
Dec 201405354.693.59$190
Nov 20140770.464.25$30
Oct 201403778.303.90$144
Sep 201404086.164.05$162
Aug 201404089.394.04$161
Jul 201404196.564.18$171
Jun 201403998.164.74$185
May 201404294.734.73$199
Apr 201404195.944.81$197
Mar 201403095.895.06$152
Feb 201401597.406.19$93
Jan 201401890.404.86$87
Dec 201301091.824.35$44
Nov 201301488.853.74$52
Oct 201301897.423.78$68
Sep 2013046104.113.72$171
Aug 2013042104.253.52$148
Jul 2013043102.523.72$160
Jun 201304594.403.93$177
May 201304794.834.15$195
Apr 201304793.964.28$201
Mar 201304693.623.91$180
Feb 201304291.233.42$144
Jan 201304791.603.42$161
Dec 201205186.773.42$174
Nov 201205086.953.62$181
Oct 201205189.383.40$173
Sep 201204794.672.92$137
Aug 201204792.662.91$137
Jul 201204985.133.02$148
Jun 201204779.822.52$118
May 201205291.612.49$129
Apr 2012049101.652.00$98
Mar 2012050105.052.22$111
Feb 2012046101.102.57$118
Jan 201204798.092.73$129
Dec 201104896.873.24$156
Nov 201104795.723.31$156
Oct 201107284.983.65$263
Sep 201102683.623.99$104
Aug 201105483.404.15$224
Jul 201105594.144.52$248
Jun 201105692.904.64$260
May 201105798.134.40$251
Apr 2011056105.964.33$243
Mar 201106096.364.06$243
Feb 201105385.644.18$222
Jan 201105986.504.59$271
Dec 201005985.734.35$257
Nov 201005980.843.80$224
Oct 201006078.103.51$211
Sep 201005972.633.98$235
Aug 201006173.684.42$270
Jul 201006172.554.74$289
Jun 201006070.364.91$295
May 201006271.124.24$263
Apr 201006281.694.12$256
Mar 201006478.394.39$281
Feb 201005873.585.44$316
Jan 201006874.365.96$406
Dec 200908271.445.48$450
Nov 2009015074.593.75$563
Oct 200901672.544.11$66
Sep 20090065.543.06$0
Aug 200904067.423.22$129
Jul 200902861.133.46$97
Jun 200905066.163.90$195
May 200906754.743.93$263
Apr 200906546.773.59$233
Mar 200906942.144.06$280
Feb 200906132.814.63$283
Jan 200906735.865.37$360
Dec 200806637.105.98$394
Nov 200806455.496.86$439
Oct 200806575.246.92$450
Sep 2008063101.767.88$496
Aug 2008064114.228.48$543
Jul 2008062131.0811.39$706
Jun 2008060131.3313.03$782
May 2008062123.1711.57$718
Apr 2008060110.3110.45$627
Mar 2008063101.909.66$609
Feb 200805892.538.77$509
Jan 200806690.388.21$542
Dec 200706588.337.30$475
Nov 200706091.677.29$438
Oct 200706282.856.92$429
Sep 200706075.846.24$375
Aug 200706269.066.39$396
Jul 200706570.906.39$415
Jun 200706262.007.55$468
May 200706258.747.85$486
Apr 200706059.617.81$468
Mar 200706256.927.30$453
Feb 200705655.108.22$460
Jan 200706250.306.73$417
Dec 200606356.656.92$436
Nov 200606254.207.62$472
Oct 200606254.906.01$373
Sep 200606360.085.04$317
Aug 200607168.717.34$521
Jul 200607669.376.34$482
Jun 200607866.286.38$498
May 200608766.016.42$559
Apr 200609064.397.36$662
Mar 2006010056.707.08$708
Feb 2006010257.597.75$791
Jan 2006011260.598.93$1,001
Dec 2005010654.9413.42$1,422
Nov 2005080254.6910.59$8,492
Oct 200501,20158.3413.80$16,569
Sep 2005075361.4512.08$9,095
Aug 2005056061.519.80$5,486
Jul 200501,16455.697.84$9,130
Jun 200501,53852.337.38$11,352
May 2005064845.226.65$4,310
Apr 200501,65449.207.36$12,174
Mar 200501,43250.377.15$10,246
Feb 200501,53445.226.31$9,682
Jan 200501,49943.166.32$9,477
Dec 200401,61839.866.75$10,923
Nov 200402,02445.286.33$12,813
Oct 200401,94549.706.52$12,672
Sep 200401,79443.245.28$9,479
Aug 200401,69842.375.55$9,425
Jul 200401,79838.286.08$10,939
Jun 200401,44036.106.43$9,264
May 200401,00337.486.49$6,514
Apr 200401,96434.475.86$11,506
Mar 200402,35534.365.53$13,023
Feb 200402,35532.455.51$12,975
Jan 200402,03232.036.30$12,801
Dec 200302,09330.266.30$13,189
Nov 200302,49828.804.60$11,479
Oct 200301,56328.174.76$7,439
Sep 200302,99626.314.75$14,229
Aug 200302,41429.765.13$12,383
Jul 200303,10729.415.17$16,066
Jun 200301,70528.565.98$10,201
May 200305,76426.595.97$34,427
Apr 200302,38326.675.41$12,886
Mar 200304,55031.146.10$27,737
Feb 200305,48233.487.93$43,450
Jan 200308,56130.315.58$47,788
Dec 2002010,61626.914.85$51,528
Nov 20020024.664.14$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   34 Mcf  × $  3.05 =       $104

────────────────────────────────────────────────────
Month total                                     $104

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/192418 is the state's own key, not one this site invented.