VANDERSTUCKEN 70

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193335District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$653 k
Dec 2002 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
282
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-04-08150593
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition235 bbl$11,862
GasProduction117,419 Mcf$640,641
Total$652,503

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4660, -100.6072. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46601, -100.60717 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,150 ft.

Completions filed
Dec 2002
1 of 1 wells

1 well

42-4353606366,150 ftDec 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (282)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

282 months

May 2026053106.413.05$161
Apr 202604498.932.87$126
Mar 202603889.753.15$120
Feb 202603363.503.75$124
Jan 2026010859.138.00$864
Dec 2025011256.664.41$494
Nov 202509958.593.93$389
Oct 202507659.383.30$251
Sep 202503062.743.08$92
Aug 202503063.933.01$90
Jul 202504066.743.32$133
Jun 202503766.483.13$116
May 202503660.553.23$116
Apr 202502962.363.54$103
Mar 202504467.704.27$188
Feb 202505570.884.34$239
Jan 202506574.324.28$278
Dec 202405968.993.12$184
Nov 202405069.052.20$110
Oct 202403871.372.28$87
Sep 202403169.612.36$73
Aug 202402875.632.06$58
Jul 202403079.932.15$64
Jun 202404378.082.63$113
May 202405678.812.20$123
Apr 202405084.451.66$83
Mar 202404880.301.55$74
Feb 202404676.091.78$82
Jan 202406173.023.30$201
Dec 202305071.262.61$131
Nov 202304977.892.81$138
Oct 202303985.443.09$120
Sep 202302589.042.74$68
Aug 202302580.522.67$67
Jul 202306174.852.64$161
Jun 2023013668.962.26$307
May 2023014870.622.23$330
Apr 2023014578.122.24$324
Mar 2023015672.852.39$373
Feb 2023014975.112.47$367
Jan 2023015776.533.39$532
Dec 2022016176.415.73$922
Nov 2022016685.005.65$937
Oct 2022016387.185.86$956
Sep 2022014784.888.16$1,200
Aug 2022015194.529.13$1,378
Jul 20220112101.587.54$845
Jun 20220107115.097.98$854
May 20220113109.378.43$953
Apr 20220108104.226.84$738
Mar 20220112108.885.08$569
Feb 2022010191.054.86$491
Jan 2022011381.844.54$513
Dec 2021011571.323.90$448
Nov 2021011077.435.24$576
Oct 2021011479.795.71$651
Sep 2021011069.865.35$589
Aug 2021011166.024.22$468
Jul 2021010970.783.98$434
Jun 2021010569.493.38$355
May 2021010863.483.02$326
Apr 2021010460.362.76$287
Mar 2021010561.302.72$285
Feb 2021014857.805.55$821
Jan 2021019450.412.81$545
Dec 2020018444.642.68$492
Nov 2020016338.772.71$441
Oct 2020015936.972.48$394
Sep 2020013837.091.99$275
Aug 2020012939.982.39$308
Jul 2020013538.371.83$246
Jun 2020014034.901.69$237
May 2020014916.921.81$270
Apr 2020014714.751.80$265
Mar 2020015430.341.86$286
Feb 2020013049.881.98$257
Jan 2020012957.252.09$270
Dec 2019012959.012.30$297
Nov 2019012855.302.75$352
Oct 2019016053.472.42$387
Sep 2019014255.052.66$377
Aug 2019014553.112.30$334
Jul 2019013956.272.46$342
Jun 2019014252.782.49$354
May 2019017358.482.74$474
Apr 2019018662.632.75$512
Mar 2019024656.803.06$753
Feb 2019130950.852.79$914
Jan 2019046246.033.23$1,491
Dec 2018048046.594.19$2,009
Nov 2018237252.934.24$1,682
Oct 2018050661.443.40$1,719
Sep 2018948259.543.11$2,034
Aug 2018044159.403.07$1,352
Jul 20183144065.142.93$3,309
Jun 2018040760.183.08$1,252
May 2018015265.382.90$441
Apr 2018015463.842.90$447
Mar 2018016061.222.79$446
Feb 2018014961.782.77$412
Jan 2018018062.874.01$722
Dec 2017016857.272.92$491
Nov 2017014955.423.12$465
Oct 2017015249.292.98$454
Sep 2017010147.523.09$312
Aug 201709845.373.00$294
Jul 201709843.873.09$303
Jun 201709942.493.09$306
May 2017010945.373.26$356
Apr 2017010447.933.21$334
Mar 2017012546.772.98$373
Feb 2017012250.452.95$360
Jan 2017014149.413.42$482
Dec 2016013648.763.72$506
Nov 2016011642.492.64$307
Oct 2016011346.193.09$349
Sep 2016010041.553.10$310
Aug 2016010441.442.92$304
Jul 2016010641.622.92$310
Jun 2016011245.352.69$301
May 2016010942.521.99$217
Apr 201609936.561.99$197
Mar 2016011033.011.79$197
Feb 201609526.472.06$196
Jan 2016011927.352.36$281
Dec 2015012032.362.00$240
Nov 2015010038.792.17$217
Oct 201509943.552.43$240
Sep 201508642.992.76$237
Aug 201508940.162.87$256
Jul 201505048.152.95$147
Jun 201506156.152.88$176
May 201505755.212.96$168
Apr 201505949.822.71$160
Mar 201507042.892.93$205
Feb 201506744.662.98$199
Jan 201507643.433.10$236
Dec 2014013154.693.59$470
Nov 2014015270.464.25$646
Oct 2014012778.303.90$495
Sep 2014015086.164.05$607
Aug 2014022489.394.04$904
Jul 2014029796.564.18$1,241
Jun 2014020998.164.74$990
May 2014022194.734.73$1,045
Apr 2014026295.944.81$1,260
Mar 2014025295.895.06$1,274
Feb 2014034597.406.19$2,136
Jan 2014041390.404.86$2,007
Dec 2013044791.824.35$1,946
Nov 2013049188.853.74$1,836
Oct 2013049497.423.78$1,867
Sep 20130476104.113.72$1,770
Aug 20130489104.253.52$1,723
Jul 20130522102.523.72$1,941
Jun 2013060694.403.93$2,384
May 2013045094.834.15$1,867
Apr 201305793.964.28$244
Mar 201305993.623.91$231
Feb 201306791.233.42$229
Jan 201307991.603.42$270
Dec 201207786.773.42$263
Nov 201207386.953.62$265
Oct 201208689.383.40$292
Sep 201206694.672.92$193
Aug 201207992.662.91$230
Jul 2012013885.133.02$417
Jun 2012019079.822.52$479
May 2012026291.612.49$652
Apr 20120323101.652.00$645
Mar 20120344105.052.22$764
Feb 20121476101.102.57$1,325
Jan 2012045098.092.73$1,230
Dec 2011053996.873.24$1,746
Nov 2011060995.723.31$2,017
Oct 2011058584.983.65$2,134
Sep 2011048583.623.99$1,933
Aug 2011013283.404.15$548
Jul 2011019494.144.52$876
Jun 2011037792.904.64$1,749
May 2011034698.134.40$1,524
Apr 20110368105.964.33$1,595
Mar 2011040796.364.06$1,651
Feb 2011039985.644.18$1,668
Jan 2011060386.504.59$2,767
Dec 2010073685.734.35$3,200
Nov 2010073480.843.80$2,786
Oct 2010065378.103.51$2,291
Sep 2010088672.633.98$3,526
Aug 2010065973.684.42$2,912
Jul 201007072.554.74$332
Jun 201007870.364.91$383
May 201006271.124.24$263
Apr 2010010781.694.12$441
Mar 201005778.394.39$250
Feb 201003673.585.44$196
Jan 2010012374.365.96$734
Dec 2009032371.445.48$1,771
Nov 2009082574.593.75$3,095
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 2009070567.423.22$2,269
Jul 2009071961.133.46$2,491
Jun 2009083966.163.90$3,268
May 200901,03554.743.93$4,063
Apr 2009086746.773.59$3,110
Mar 2009088242.144.06$3,580
Feb 200905732.814.63$264
Jan 2009015135.865.37$811
Dec 2008014737.105.98$879
Nov 200805755.496.86$391
Oct 200807375.246.92$505
Sep 20080143101.767.88$1,126
Aug 20080146114.228.48$1,239
Jul 20080154131.0811.39$1,754
Jun 20082155131.3313.03$2,283
May 20082168123.1711.57$2,191
Apr 20080168110.3110.45$1,756
Mar 20081175101.909.66$1,793
Feb 2008217992.538.77$1,755
Jan 2008019490.388.21$1,592
Dec 2007018688.337.30$1,358
Nov 2007217591.677.29$1,459
Oct 2007117582.856.92$1,294
Sep 2007114975.846.24$1,006
Aug 2007115969.066.39$1,085
Jul 2007110670.906.39$748
Jun 2007111462.007.55$923
May 2007124358.747.85$1,965
Apr 2007216459.617.81$1,399
Mar 2007130756.927.30$2,299
Feb 2007118755.108.22$1,591
Jan 2007125550.306.73$1,766
Dec 2006226256.656.92$1,926
Nov 2006232854.207.62$2,607
Oct 2006335454.906.01$2,294
Sep 2006333060.085.04$1,843
Aug 2006133868.717.34$2,550
Jul 2006134569.376.34$2,258
Jun 2006219866.286.38$1,397
May 2006427966.016.42$2,057
Apr 2006267164.397.36$5,068
Mar 2006580256.707.08$5,964
Feb 2006574957.597.75$6,094
Jan 2006583360.598.93$7,744
Dec 2005385754.9413.42$11,662
Nov 2005583954.6910.59$9,157
Oct 2005585458.3413.80$12,073
Sep 2005383161.4512.08$10,222
Aug 2005388661.519.80$8,865
Jul 2005388455.697.84$7,101
Jun 2005385552.337.38$6,468
May 2005377345.226.65$5,277
Apr 2005393149.207.36$7,000
Mar 2005398150.377.15$7,170
Feb 2005389145.226.31$5,760
Jan 200531,07243.166.32$6,907
Dec 200431,08939.866.75$7,472
Nov 200401,08345.286.33$6,856
Oct 200471,13749.706.52$7,756
Sep 200431,13743.245.28$6,138
Aug 200431,19142.375.55$6,738
Jul 200401,16838.286.08$7,106
Jun 200431,15736.106.43$7,551
May 200431,22237.486.49$8,049
Apr 200461,21634.475.86$7,331
Mar 200431,27934.365.53$7,176
Feb 200401,46132.455.51$8,050
Jan 200431,28732.036.30$8,204
Dec 200331,89530.266.30$12,032
Nov 200331,43628.804.60$6,685
Oct 200341,31628.174.76$6,376
Sep 2003393426.314.75$4,515
Aug 200331,50729.765.13$7,820
Jul 200302,22329.415.17$11,495
Jun 200342,77528.565.98$16,717
May 200373,09326.595.97$18,660
Apr 2003163,44226.675.41$19,039
Mar 200395,01731.146.10$30,864
Feb 200373,86633.487.93$30,876
Jan 200335,55830.315.58$31,116
Dec 200207,22026.914.85$35,044

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   53 Mcf  × $  3.05 =       $161

────────────────────────────────────────────────────
Month total                                     $161

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/193335 is the state's own key, not one this site invented.