Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 201938District 7CField 81267333CondensateGasSaveExport
Value, all time
$881 k
Jun 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
276
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition370 bbl$19,329
GasProduction140,639 Mcf$861,209
Total$880,537

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4699, -100.6075. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.46986, -100.60747 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,112 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,112 ft.

Completions filed
Jun 2003
1 of 1 wells

1 well

42-4353634276,112 ftJun 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (276)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

276 months

May 20260130106.413.05$396
Apr 2026012398.932.87$353
Mar 2026012989.753.15$406
Feb 2026011763.503.75$439
Jan 2026012659.138.00$1,008
Dec 2025013856.664.41$609
Nov 2025013458.593.93$526
Oct 2025013659.383.30$449
Sep 2025012962.743.08$397
Aug 2025013563.933.01$407
Jul 2025013566.743.32$448
Jun 2025013166.483.13$410
May 2025013960.553.23$449
Apr 2025013762.363.54$485
Mar 2025013867.704.27$589
Feb 2025012670.884.34$547
Jan 2025012674.324.28$539
Dec 2024012968.993.12$403
Nov 2024012469.052.20$273
Oct 2024013071.372.28$297
Sep 2024010269.612.36$241
Aug 202406575.632.06$134
Jul 202404979.932.15$105
Jun 202404378.082.63$113
May 202405278.812.20$114
Apr 202405284.451.66$86
Mar 202404580.301.55$70
Feb 202406076.091.78$107
Jan 202406273.023.30$204
Dec 202303671.262.61$94
Nov 202305577.892.81$154
Oct 202304485.443.09$136
Sep 202306189.042.74$167
Aug 202306080.522.67$160
Jul 202306874.852.64$180
Jun 202307868.962.26$176
May 202305170.622.23$114
Apr 202306378.122.24$141
Mar 202307172.852.39$170
Feb 202306275.112.47$153
Jan 202307876.533.39$264
Dec 202204076.415.73$229
Nov 202205385.005.65$299
Oct 202207887.185.86$457
Sep 202206484.888.16$522
Aug 202204794.529.13$429
Jul 2022059101.587.54$445
Jun 2022049115.097.98$391
May 2022041109.378.43$346
Apr 2022072104.226.84$492
Mar 2022072108.885.08$366
Feb 202208491.054.86$408
Jan 202207081.844.54$318
Dec 202106471.323.90$250
Nov 202105477.435.24$283
Oct 202102979.795.71$166
Sep 20210269.865.35$11
Aug 20210566.024.22$21
Jul 20210570.783.98$20
Jun 20210569.493.38$17
May 20210563.483.02$15
Apr 20210660.362.76$17
Mar 20210761.302.72$19
Feb 20210457.805.55$22
Jan 20210850.412.81$22
Dec 20200944.642.68$24
Nov 20200738.772.71$19
Oct 20200836.972.48$20
Sep 20200737.091.99$14
Aug 20200739.982.39$17
Jul 20200838.371.83$15
Jun 20200734.901.69$12
May 20200816.921.81$15
Apr 20200914.751.80$16
Mar 20200930.341.86$17
Feb 20200949.881.98$18
Jan 202001257.252.09$25
Dec 20190959.012.30$21
Nov 20190955.302.75$25
Oct 20190753.472.42$17
Sep 20190755.052.66$19
Aug 20190853.112.30$18
Jul 20190756.272.46$17
Jun 20190152.782.49$2
May 20190558.482.74$14
Apr 20190262.632.75$6
Mar 20190256.803.06$6
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160341.622.92$9
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20161026.472.06$26
Jan 201604727.352.36$111
Dec 201508532.362.00$170
Nov 201514538.792.17$136
Oct 201528543.552.43$293
Sep 2015015242.992.76$419
Aug 2015217140.162.87$572
Jul 2015016948.152.95$498
Jun 2015016456.152.88$473
May 2015013855.212.96$408
Apr 2015013549.822.71$365
Mar 2015016242.892.93$475
Feb 2015015044.662.98$446
Jan 2015016743.433.10$518
Dec 2014017554.693.59$628
Nov 2014018070.464.25$765
Oct 2014018178.303.90$706
Sep 2014017886.164.05$720
Aug 2014018489.394.04$742
Jul 2014018296.564.18$761
Jun 2014017298.164.74$815
May 2014017594.734.73$827
Apr 2014016195.944.81$774
Mar 2014014795.895.06$743
Feb 2014016497.406.19$1,015
Jan 2014018990.404.86$919
Dec 2013019191.824.35$832
Nov 2013018688.853.74$695
Oct 2013020297.423.78$763
Sep 20130198104.113.72$736
Aug 20130206104.253.52$726
Jul 20130207102.523.72$770
Jun 2013020794.403.93$814
May 2013021194.834.15$875
Apr 2013020293.964.28$865
Mar 2013021693.623.91$845
Feb 2013019891.233.42$677
Jan 2013021991.603.42$749
Dec 2012022086.773.42$752
Nov 2012021486.953.62$776
Oct 2012022489.383.40$762
Sep 2012021294.672.92$619
Aug 2012022092.662.91$640
Jul 2012022685.133.02$683
Jun 2012022579.822.52$567
May 2012021791.612.49$540
Apr 20120145101.652.00$290
Mar 20120218105.052.22$484
Feb 20120184101.102.57$473
Jan 2012021498.092.73$585
Dec 2011023696.873.24$765
Nov 2011024095.723.31$795
Oct 2011024884.983.65$905
Sep 2011023983.623.99$953
Aug 2011026383.404.15$1,091
Jul 2011027794.144.52$1,251
Jun 2011027192.904.64$1,257
May 2011027698.134.40$1,216
Apr 20110250105.964.33$1,083
Mar 2011017996.364.06$726
Feb 2011020785.644.18$865
Jan 2011025686.504.59$1,175
Dec 2010028585.734.35$1,239
Nov 2010028280.843.80$1,070
Oct 2010030378.103.51$1,063
Sep 2010030572.633.98$1,214
Aug 2010032973.684.42$1,454
Jul 2010032572.554.74$1,539
Jun 2010032170.364.91$1,576
May 2010035571.124.24$1,504
Apr 2010034681.694.12$1,426
Mar 2010035978.394.39$1,576
Feb 2010032473.585.44$1,763
Jan 2010036174.365.96$2,153
Dec 2009037771.445.48$2,067
Nov 2009037474.593.75$1,403
Oct 2009037972.544.11$1,558
Sep 2009037465.543.06$1,146
Aug 2009039467.423.22$1,268
Jul 2009041361.133.46$1,431
Jun 2009040166.163.90$1,562
May 2009043954.743.93$1,723
Apr 2009038246.773.59$1,370
Mar 2009045142.144.06$1,831
Feb 2009040632.814.63$1,881
Jan 2009045435.865.37$2,438
Dec 2008046237.105.98$2,761
Nov 2008046055.496.86$3,156
Oct 2008049975.246.92$3,454
Sep 20080392101.767.88$3,088
Aug 20080400114.228.48$3,393
Jul 20080529131.0811.39$6,025
Jun 20085544131.3313.03$7,746
May 20085547123.1711.57$6,947
Apr 20080542110.3110.45$5,667
Mar 20082594101.909.66$5,944
Feb 2008258792.538.77$5,333
Jan 2008051190.388.21$4,193
Dec 200706188.337.30$445
Nov 200727891.677.29$752
Oct 20072782.856.92$214
Sep 200748275.846.24$815
Aug 2007632769.066.39$2,503
Jul 200771,25470.906.39$8,507
Jun 200751,34762.007.55$10,478
May 200761,06558.747.85$8,709
Apr 2007111,07559.617.81$9,046
Mar 200761,29456.927.30$9,790
Feb 2007577555.108.22$6,643
Jan 200751,14250.306.73$7,934
Dec 200691,00956.656.92$7,491
Nov 200691,25654.207.62$10,055
Oct 200691,32154.906.01$8,438
Sep 200681,29460.085.04$6,999
Aug 200631,27168.717.34$9,535
Jul 2006893569.376.34$6,485
Jun 200681,17966.286.38$8,057
May 200681,29266.016.42$8,829
Apr 200631,26864.397.36$9,526
Mar 200681,01856.707.08$7,664
Feb 200681,19857.597.75$9,747
Jan 200691,28160.598.93$11,989
Dec 200551,34554.9413.42$18,318
Nov 200591,45354.6910.59$15,877
Oct 200591,68858.3413.80$23,812
Sep 200551,64061.4512.08$20,117
Aug 200561,77261.519.80$17,729
Jul 200561,89455.697.84$15,190
Jun 200531,83852.337.38$13,723
May 2005474345.226.65$5,123
Apr 200551,57049.207.36$11,802
Mar 200551,67350.377.15$12,222
Feb 200571,79745.226.31$11,659
Jan 200572,39643.166.32$15,450
Dec 200472,43239.866.75$16,698
Nov 200402,40345.286.33$15,212
Oct 2004142,54049.706.52$17,244
Sep 200472,53943.245.28$13,719
Aug 200462,65842.375.55$15,008
Jul 200402,32138.286.08$14,121
Jun 200451,90236.106.43$12,416
May 200462,09937.486.49$13,857
Apr 2004122,47434.475.86$14,907
Mar 200462,72734.365.53$15,287
Feb 200402,22132.455.51$12,237
Jan 200483,77632.036.30$24,044
Dec 200383,95930.266.30$25,190
Nov 200384,51228.804.60$20,964
Oct 2003214,14628.174.76$20,325
Sep 2003146,87426.314.75$33,015
Aug 200388,19829.765.13$42,292
Jul 200308,19029.415.17$42,349
Jun 2003060828.565.98$3,638

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  130 Mcf  × $  3.05 =       $396

────────────────────────────────────────────────────
Month total                                     $396

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well