UNION PACIFIC 'C"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 193755District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$724 k
Jan 2003 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
281
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-06-02151178
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition46 bbl$1,582
GasProduction131,416 Mcf$722,183
Total$723,765

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5903, -101.2567. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.59028, -101.25672 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,950 ft.

Completions filed
Jan 2003
1 of 1 wells

1 well

42-10538909386,950 ftJan 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (281)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

281 months

May 2026078106.413.05$238
Apr 202607298.932.87$207
Mar 202608089.753.15$252
Feb 202606763.503.75$251
Jan 202607459.138.00$592
Dec 202508156.664.41$357
Nov 202508158.593.93$318
Oct 202508359.383.30$274
Sep 202508062.743.08$246
Aug 202508763.933.01$262
Jul 202506566.743.32$215
Jun 202507766.483.13$241
May 202507960.553.23$255
Apr 202507462.363.54$262
Mar 202508067.704.27$341
Feb 202507370.884.34$317
Jan 202508174.324.28$347
Dec 202408768.993.12$272
Nov 202409069.052.20$198
Oct 202409771.372.28$221
Sep 202407869.612.36$184
Aug 202409975.632.06$204
Jul 202409979.932.15$213
Jun 202409778.082.63$256
May 2024010778.812.20$235
Apr 202409984.451.66$164
Mar 2024011280.301.55$173
Feb 202418676.091.78$229
Jan 20240573.023.30$16
Dec 20230071.262.61$0
Nov 20230477.892.81$11
Oct 202303085.443.09$93
Sep 2023032789.042.74$894
Aug 2023034880.522.67$930
Jul 2023034674.852.64$914
Jun 2023037468.962.26$845
May 2023049370.622.23$1,098
Apr 2023041678.122.24$931
Mar 2023019472.852.39$464
Feb 2023416375.112.47$702
Jan 2023019076.533.39$644
Dec 2022017676.415.73$1,008
Nov 2022017385.005.65$977
Oct 2022018487.185.86$1,079
Sep 2022019984.888.16$1,625
Aug 2022018394.529.13$1,670
Jul 20220196101.587.54$1,478
Jun 20220192115.097.98$1,532
May 20220210109.378.43$1,771
Apr 20220193104.226.84$1,320
Mar 20220219108.885.08$1,112
Feb 2022017991.054.86$870
Jan 2022022381.844.54$1,012
Dec 2021020071.323.90$780
Nov 2021020577.435.24$1,074
Oct 2021017979.795.71$1,023
Sep 2021020669.865.35$1,102
Aug 2021021566.024.22$907
Jul 2021021070.783.98$836
Jun 2021022369.493.38$754
May 2021018663.483.02$561
Apr 2021023760.362.76$654
Mar 2021022561.302.72$611
Feb 2021016257.805.55$899
Jan 2021023050.412.81$646
Dec 2020025944.642.68$693
Nov 2020020938.772.71$566
Oct 2020030036.972.48$744
Sep 2020026637.091.99$530
Aug 2020029239.982.39$696
Jul 2020027338.371.83$498
Jun 2020028434.901.69$480
May 2020014616.921.81$265
Apr 2020021114.751.80$381
Mar 2020029030.341.86$538
Feb 2020029849.881.98$590
Jan 2020031557.252.09$660
Dec 2019031759.012.30$730
Nov 2019031255.302.75$858
Oct 2019031453.472.42$759
Sep 2019031155.052.66$826
Aug 2019031953.112.30$735
Jul 2019032256.272.46$792
Jun 2019031352.782.49$780
May 2019032458.482.74$888
Apr 2019026962.632.75$740
Mar 2019030756.803.06$940
Feb 2019028150.852.79$785
Jan 2019032146.033.23$1,036
Dec 2018034146.594.19$1,427
Nov 2018029952.934.24$1,267
Oct 2018026461.443.40$897
Sep 2018029859.543.11$926
Aug 2018036659.403.07$1,122
Jul 2018033165.142.93$970
Jun 2018033460.183.08$1,028
May 2018030465.382.90$882
Apr 2018032163.842.90$931
Mar 2018034761.222.79$967
Feb 2018027361.782.77$755
Jan 2018032762.874.01$1,311
Dec 2017031657.272.92$923
Nov 2017032055.423.12$998
Oct 2017031149.292.98$928
Sep 2017029947.523.09$923
Aug 2017030145.373.00$904
Jul 2017032543.873.09$1,003
Jun 2017030142.493.09$929
May 2017034145.373.26$1,113
Apr 2017035347.933.21$1,134
Mar 2017070446.772.98$2,101
Feb 2017033650.452.95$992
Jan 2017035149.413.42$1,200
Dec 2016034448.763.72$1,281
Nov 2016035442.492.64$936
Oct 2016035246.193.09$1,088
Sep 2016034141.553.10$1,057
Aug 2016031241.442.92$912
Jul 2016029641.622.92$866
Jun 2016030645.352.69$822
May 2016031842.521.99$633
Apr 2016031136.561.99$619
Mar 2016033133.011.79$594
Feb 2016026326.472.06$543
Jan 2016024527.352.36$579
Dec 2015022932.362.00$458
Nov 2015024238.792.17$524
Oct 2015027743.552.43$672
Sep 2015027042.992.76$745
Aug 2015028340.162.87$813
Jul 2015034448.152.95$1,013
Jun 2015037356.152.88$1,075
May 2015028555.212.96$842
Apr 2015032649.822.71$882
Mar 2015038042.892.93$1,115
Feb 2015034444.662.98$1,024
Jan 2015038243.433.10$1,184
Dec 2014038754.693.59$1,390
Nov 2014036770.464.25$1,560
Oct 2014039678.303.90$1,545
Sep 2014038486.164.05$1,553
Aug 2014038589.394.04$1,554
Jul 2014038896.564.18$1,622
Jun 2014037898.164.74$1,791
May 2014039294.734.73$1,853
Apr 2014038895.944.81$1,866
Mar 2014039995.895.06$2,018
Feb 2014036097.406.19$2,229
Jan 2014040090.404.86$1,944
Dec 2013039691.824.35$1,724
Nov 2013040088.853.74$1,495
Oct 2013041997.423.78$1,584
Sep 20130381104.113.72$1,416
Aug 20130259104.253.52$912
Jul 20130377102.523.72$1,402
Jun 2013042494.403.93$1,668
May 2013041794.834.15$1,730
Apr 2013040393.964.28$1,726
Mar 2013039793.623.91$1,553
Feb 2013039291.233.42$1,341
Jan 2013042991.603.42$1,467
Dec 2012044386.773.42$1,515
Nov 2012043386.953.62$1,570
Oct 2012044789.383.40$1,520
Sep 2012044494.672.92$1,296
Aug 2012032392.662.91$939
Jul 2012037085.133.02$1,118
Jun 2012040379.822.52$1,015
May 2012035891.612.49$891
Apr 20120420101.652.00$839
Mar 20120449105.052.22$998
Feb 20120413101.102.57$1,062
Jan 2012044298.092.73$1,208
Dec 2011044496.873.24$1,438
Nov 2011043395.723.31$1,434
Oct 2011045984.983.65$1,675
Sep 2011045683.623.99$1,818
Aug 2011048783.404.15$2,021
Jul 2011044194.144.52$1,992
Jun 2011045892.904.64$2,125
May 2011053898.134.40$2,370
Apr 20110329105.964.33$1,426
Mar 2011047696.364.06$1,931
Feb 2011043685.644.18$1,822
Jan 2011048586.504.59$2,226
Dec 2010049385.734.35$2,143
Nov 2010049280.843.80$1,867
Oct 2010054278.103.51$1,902
Sep 2010034472.633.98$1,369
Aug 2010049673.684.42$2,192
Jul 2010050572.554.74$2,392
Jun 2010049470.364.91$2,426
May 2010053171.124.24$2,249
Apr 2010052181.694.12$2,148
Mar 2010051678.394.39$2,265
Feb 2010046873.585.44$2,547
Jan 2010053174.365.96$3,167
Dec 2009051771.445.48$2,835
Nov 2009058074.593.75$2,176
Oct 2009053572.544.11$2,199
Sep 2009055265.543.06$1,692
Aug 2009055067.423.22$1,770
Jul 2009047161.133.46$1,632
Jun 2009047066.163.90$1,831
May 2009048654.743.93$1,908
Apr 2009039946.773.59$1,431
Mar 2009044442.144.06$1,802
Feb 2009039932.814.63$1,849
Jan 2009046435.865.37$2,492
Dec 2008045437.105.98$2,714
Nov 2008044455.496.86$3,046
Oct 2008047275.246.92$3,267
Sep 20080252101.767.88$1,985
Aug 20080761114.228.48$6,456
Jul 20080675131.0811.39$7,688
Jun 20080707131.3313.03$9,214
May 200801,475123.1711.57$17,072
Apr 200801,266110.3110.45$13,236
Mar 200801,598101.909.66$15,443
Feb 200801,28792.538.77$11,288
Jan 200801,24090.388.21$10,175
Dec 200701,37888.337.30$10,062
Nov 200701,04391.677.29$7,605
Oct 2007050082.856.92$3,461
Sep 2007046975.846.24$2,929
Aug 2007065269.066.39$4,165
Jul 2007067170.906.39$4,286
Jun 2007079362.007.55$5,986
May 2007082758.747.85$6,489
Apr 2007062759.617.81$4,894
Mar 2007064156.927.30$4,681
Feb 2007056455.108.22$4,634
Jan 2007064050.306.73$4,305
Dec 2006051556.656.92$3,563
Nov 2006073254.207.62$5,576
Oct 2006070254.906.01$4,222
Sep 2006066060.085.04$3,325
Aug 2006053068.717.34$3,890
Jul 2006064369.376.34$4,078
Jun 2006063066.286.38$4,022
May 2006058166.016.42$3,733
Apr 2006066564.397.36$4,895
Mar 2006074256.707.08$5,256
Feb 2006069357.597.75$5,372
Jan 2006079660.598.93$7,111
Dec 200501,15854.9413.42$15,535
Nov 200501,25854.6910.59$13,320
Oct 200501,14858.3413.80$15,838
Sep 2005065861.4512.08$7,948
Aug 2005071061.519.80$6,956
Jul 2005061055.697.84$4,785
Jun 2005087552.337.38$6,458
May 2005081345.226.65$5,407
Apr 2005078649.207.36$5,785
Mar 2005083850.377.15$5,996
Feb 2005076845.226.31$4,848
Jan 2005094743.166.32$5,987
Dec 200401,04139.866.75$7,028
Nov 200401,11545.286.33$7,058
Oct 2004094949.706.52$6,183
Sep 2004087743.245.28$4,634
Aug 2004098842.375.55$5,484
Jul 200401,02338.286.08$6,224
Jun 200401,28036.106.43$8,234
May 200401,41837.486.49$9,209
Apr 200401,08634.475.86$6,362
Mar 200401,39434.365.53$7,709
Feb 200401,29232.455.51$7,118
Jan 200401,22832.036.30$7,736
Dec 200301,40930.266.30$8,879
Nov 200301,56228.804.60$7,178
Oct 2003085428.174.76$4,065
Sep 200301,53526.314.75$7,290
Aug 2003094629.765.13$4,853
Jul 2003411,29929.415.17$7,923
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 200302,24226.675.41$12,123
Mar 200303,33631.146.10$20,336
Feb 200302,66133.487.93$21,091
Jan 20030030.315.58$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   78 Mcf  × $  3.05 =       $238

────────────────────────────────────────────────────
Month total                                     $238

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/193755 is the state's own key, not one this site invented.