UNION PACIFIC "C"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 39724District 7CField 67995200NGPA filingCondensateGasSaveExport
Value, all time
$398 k
Jan 1993 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12 bbl$485
GasProduction130,533 Mcf$397,156
Total$397,641

35,316 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5956, -101.2570. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.59556, -101.25695 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,577 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,577 ft.

Completions filed
Dec 1965
1 of 1 wells

1 well

42-10510663105,577 ftDec 1965

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026036106.413.05$110
Apr 202603998.932.87$112
Mar 202602389.753.15$72
Feb 202603663.503.75$135
Jan 202603959.138.00$312
Dec 2025012656.664.41$556
Nov 202508358.593.93$326
Oct 2025011359.383.30$373
Sep 2025015862.743.08$486
Aug 2025017863.933.01$537
Jul 2025033166.743.32$1,097
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250274.324.28$9
Dec 20240068.993.12$0
Nov 202403469.052.20$75
Oct 202418071.372.28$254
Sep 202408969.612.36$210
Aug 202405875.632.06$120
Jul 202408779.932.15$187
Jun 202406778.082.63$176
May 2024019578.812.20$429
Apr 2024020084.451.66$332
Mar 20240080.301.55$0
Feb 202406676.091.78$118
Jan 2024014973.023.30$491
Dec 2023012071.262.61$313
Nov 202338377.892.81$467
Oct 2023014685.443.09$451
Sep 2023019189.042.74$522
Aug 2023030480.522.67$813
Jul 202301,75574.852.64$4,636
Jun 202301,47468.962.26$3,329
May 202301,14570.622.23$2,550
Apr 2023019878.122.24$443
Mar 2023019172.852.39$457
Feb 202308975.112.47$219
Jan 2023023676.533.39$800
Dec 2022023176.415.73$1,323
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202203101.587.54$23
Jun 2022011115.097.98$88
May 20220169109.378.43$1,425
Apr 2022061104.226.84$417
Mar 2022085108.885.08$431
Feb 2022010991.054.86$530
Jan 202209681.844.54$436
Dec 202101771.323.90$66
Nov 2021010277.435.24$534
Oct 2021010279.795.71$583
Sep 2021011469.865.35$610
Aug 2021011666.024.22$490
Jul 2021014870.783.98$589
Jun 2021013769.493.38$463
May 202103463.483.02$103
Apr 2021013660.362.76$375
Mar 2021016161.302.72$437
Feb 2021012957.805.55$716
Jan 202109650.412.81$270
Dec 2020010444.642.68$278
Nov 2020014738.772.71$398
Oct 2020010336.972.48$255
Sep 202001537.091.99$30
Aug 2020012239.982.39$291
Jul 2020012838.371.83$234
Jun 2020012834.901.69$216
May 2020016216.921.81$294
Apr 2020016814.751.80$303
Mar 202003430.341.86$63
Feb 2020015449.881.98$305
Jan 202004057.252.09$84
Dec 201905659.012.30$129
Nov 201908355.302.75$228
Oct 201905153.472.42$123
Sep 2019011355.052.66$300
Aug 2019019953.112.30$459
Jul 2019013956.272.46$342
Jun 2019015852.782.49$394
May 2019019758.482.74$540
Apr 2019012662.632.75$347
Mar 2019015256.803.06$465
Feb 2019019650.852.79$547
Jan 2019012746.033.23$410
Dec 2018022146.594.19$925
Nov 201805352.934.24$225
Oct 2018017761.443.40$601
Sep 2018019859.543.11$615
Aug 2018018159.403.07$555
Jul 2018019565.142.93$572
Jun 2018018560.183.08$569
May 2018017465.382.90$505
Apr 2018021763.842.90$629
Mar 2018021161.222.79$588
Feb 2018019961.782.77$550
Jan 201807362.874.01$293
Dec 2017018357.272.92$535
Nov 2017021455.423.12$667
Oct 2017016249.292.98$483
Sep 2017016547.523.09$509
Aug 201701245.373.00$36
Jul 2017012243.873.09$377
Jun 2017010142.493.09$312
May 2017012045.373.26$392
Apr 2017019347.933.21$620
Mar 2017047846.772.98$1,426
Feb 20170050.452.95$0
Jan 201703449.413.42$116
Dec 2016013748.763.72$510
Nov 20160942.492.64$24
Oct 201602146.193.09$65
Sep 2016017141.553.10$530
Aug 20160741.442.92$20
Jul 20160841.622.92$23
Jun 201601145.352.69$30
May 201601842.521.99$36
Apr 201601736.561.99$34
Mar 201605233.011.79$93
Feb 2016011826.472.06$244
Jan 2016011227.352.36$265
Dec 2015013632.362.00$272
Nov 2015014438.792.17$312
Oct 201506643.552.43$160
Sep 2015018742.992.76$516
Aug 201502240.162.87$63
Jul 2015013848.152.95$406
Jun 2015017656.152.88$507
May 201508555.212.96$251
Apr 2015013749.822.71$371
Mar 2015015042.892.93$440
Feb 2015015444.662.98$458
Jan 2015016943.433.10$524
Dec 2014014854.693.59$532
Nov 2014011270.464.25$476
Oct 2014014778.303.90$573
Sep 2014015486.164.05$623
Aug 2014018189.394.04$730
Jul 2014013596.564.18$564
Jun 2014017398.164.74$819
May 2014016694.734.73$785
Apr 2014017995.944.81$861
Mar 2014011995.895.06$602
Feb 2014015997.406.19$985
Jan 2014016690.404.86$807
Dec 2013017791.824.35$771
Nov 2013014388.853.74$535
Oct 2013014397.423.78$540
Sep 20130137104.113.72$509
Aug 20130155104.253.52$546
Jul 20130169102.523.72$628
Jun 2013020994.403.93$822
May 201305894.834.15$241
Apr 2013016593.964.28$707
Mar 2013013293.623.91$517
Feb 2013014491.233.42$492
Jan 2013017591.603.42$598
Dec 2012016386.773.42$557
Nov 2012011886.953.62$428
Oct 2012018089.383.40$612
Sep 2012013794.672.92$400
Aug 2012020392.662.91$590
Jul 2012013585.133.02$408
Jun 2012012679.822.52$317
May 2012015991.612.49$396
Apr 20120114101.652.00$228
Mar 20120139105.052.22$309
Feb 20120128101.102.57$329
Jan 2012015098.092.73$410
Dec 2011013096.873.24$421
Nov 2011018795.723.31$619
Oct 2011019184.983.65$697
Sep 2011016383.623.99$650
Aug 2011018683.404.15$772
Jul 2011013794.144.52$619
Jun 2011016792.904.64$775
May 2011020098.134.40$881
Apr 20110180105.964.33$780
Mar 201102696.364.06$105
Feb 201105785.644.18$238
Jan 2011014986.504.59$684
Dec 2010014285.734.35$617
Nov 2010013980.843.80$528
Oct 2010012878.103.51$449
Sep 2010013172.633.98$521
Aug 2010014273.684.42$628
Jul 2010015272.554.74$720
Jun 2010013470.364.91$658
May 2010015871.124.24$669
Apr 2010013781.694.12$565
Mar 2010020878.394.39$913
Feb 201005673.585.44$305
Jan 2010016774.365.96$996
Dec 2009021771.445.48$1,190
Nov 2009016474.593.75$615
Oct 2009019372.544.11$793
Sep 2009015465.543.06$472
Aug 2009022967.423.22$737
Jul 2009024661.133.46$852
Jun 2009019266.163.90$748
May 2009015654.743.93$612
Apr 2009012446.773.59$445
Mar 2009014042.144.06$568
Feb 2009014032.814.63$649
Jan 2009018135.865.37$972
Dec 2008027237.105.98$1,626
Nov 2008014555.496.86$995
Oct 2008023175.246.92$1,599
Sep 20080124101.767.88$977
Aug 20080259114.228.48$2,197
Jul 20080193131.0811.39$2,198
Jun 20080192131.3313.03$2,502
May 20080246123.1711.57$2,847
Apr 20080251110.3110.45$2,624
Mar 20080246101.909.66$2,377
Feb 2008023292.538.77$2,035
Jan 2008017590.388.21$1,436
Dec 2007022388.337.30$1,628
Nov 2007024791.677.29$1,801
Oct 2007027982.856.92$1,931
Sep 2007022575.846.24$1,405
Aug 2007026769.066.39$1,706
Jul 2007024070.906.39$1,533
Jun 2007020662.007.55$1,555
May 2007023658.747.85$1,852
Apr 2007028359.617.81$2,209
Mar 2007027156.927.30$1,979
Feb 2007027655.108.22$2,268
Jan 2007024550.306.73$1,648
Dec 2006022056.656.92$1,522
Nov 2006029254.207.62$2,224
Oct 2006030354.906.01$1,822
Sep 2006028360.085.04$1,426
Aug 2006026068.717.34$1,908
Jul 2006025469.376.34$1,611
Jun 2006032166.286.38$2,049
May 2006033466.016.42$2,146
Apr 2006037464.397.36$2,753
Mar 2006029656.707.08$2,097
Feb 2006033757.597.75$2,612
Jan 2006041260.598.93$3,681
Dec 2005042054.9413.42$5,634
Nov 2005035554.6910.59$3,759
Oct 2005039458.3413.80$5,436
Sep 2005038061.4512.08$4,590
Aug 2005042961.519.80$4,203
Jul 2005043255.697.84$3,388
Jun 2005034052.337.38$2,510
May 2005033645.226.65$2,235
Apr 2005039349.207.36$2,893
Mar 2005041250.377.15$2,948
Feb 2005034945.226.31$2,203
Jan 2005031843.166.32$2,010
Dec 2004035839.866.75$2,417
Nov 2004039845.286.33$2,520
Oct 2004041849.706.52$2,723
Sep 2004036543.245.28$1,929
Aug 2004043942.375.55$2,437
Jul 2004053938.286.08$3,279
Jun 2004041636.106.43$2,676
May 2004042037.486.49$2,728
Apr 2004036334.475.86$2,127
Mar 2004039134.365.53$2,162
Feb 2004035532.455.51$1,956
Jan 2004046332.036.30$2,917
Dec 2003050930.266.30$3,208
Nov 2003045928.804.60$2,109
Oct 2003034728.174.76$1,652
Sep 2003041826.314.75$1,985
Aug 2003044929.765.13$2,303
Jul 2003040829.415.17$2,110
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 2003045926.675.41$2,482
Mar 2003043431.146.10$2,646
Feb 2003044333.487.93$3,511
Jan 2003055030.315.58$3,070
Dec 2002041626.914.85$2,019
Nov 2002057724.664.14$2,387
Oct 2002052226.464.23$2,208
Sep 2002056027.443.64$2,036
Aug 2002050025.963.16$1,582
Jul 2002046624.583.06$1,427
Jun 2002061423.733.34$2,050
May 2002046624.663.58$1,670
Apr 2002066023.653.51$2,318
Mar 2002054922.003.10$1,703
Feb 2002055418.222.38$1,316
Jan 2002050517.172.38$1,200
Dec 2001045316.932.36$1,071
Nov 2001058118.072.41$1,398
Oct 2001058719.782.53$1,484
Sep 2001063724.262.25$1,434
Aug 2001058424.873.05$1,783
Jul 2001062023.933.20$1,982
Jun 2001059924.563.82$2,291
May 2001058825.524.31$2,533
Apr 2001057324.685.34$3,057
Mar 2001056024.545.38$3,011
Feb 20010027.755.77$0
Jan 2001054727.478.40$4,594
Dec 2000054726.889.12$4,990
Nov 2000049332.215.66$2,789
Oct 2000055931.235.15$2,876
Sep 2000058131.875.19$3,013
Aug 2000056229.644.54$2,552
Jul 2000060728.534.09$2,482
Jun 2000057029.304.40$2,506
May 2000087427.263.68$3,216
Apr 2000082924.513.12$2,583
Mar 2000049028.422.86$1,401
Feb 2000051827.622.73$1,412
Jan 2000065725.272.48$1,630
Dec 1999054924.282.42$1,331
Nov 1999048223.192.43$1,173
Oct 1999056320.982.80$1,578
Sep 1999063621.752.62$1,666
Aug 1999070119.262.88$2,016
Jul 1999067117.892.37$1,592
Jun 1999061115.942.36$1,443
May 1999068115.792.32$1,581
Apr 1999055715.102.21$1,230
Mar 1999057612.471.84$1,059
Feb 199905519.981.82$1,002
Jan 1999055710.381.90$1,058
Dec 199806019.201.77$1,066
Nov 1998058610.892.19$1,281
Oct 1998063712.421.97$1,254
Sep 1998056012.592.08$1,166
Aug 1998064211.301.91$1,225
Jul 1998050611.742.24$1,132
Jun 1998062911.242.24$1,407
May 1998055512.622.21$1,225
Apr 1998059713.042.51$1,496
Mar 1998061412.802.31$1,418
Feb 1998051813.952.30$1,191
Jan 1998067814.702.15$1,461
Dec 1997071216.322.41$1,717
Nov 1997076818.193.09$2,372
Oct 1997066619.253.15$2,098
Sep 1997053217.742.95$1,572
Aug 1997066117.862.55$1,689
Jul 1997065917.582.25$1,481
Jun 1997058217.242.26$1,314
May 1997056818.972.31$1,311
Apr 1997053317.882.08$1,110
Mar 1997068818.951.94$1,334
Feb 1997055120.492.21$1,215
Jan 1997063123.483.54$2,234
Dec 1996067123.32$0
Nov 1996560221.97$110
Oct 1996368523.31$70
Sep 1996065122.22$0
Aug 1996071020.26$0
Jul 1996067219.55$0
Jun 1996063618.73$0
May 1996065119.43$0
Apr 1996077021.51$0
Mar 1996068719.38$0
Feb 1996056416.98$0
Jan 1996072317.07$0
Dec 1995060717.19$0
Nov 1995061116.00$0
Oct 1995063515.43$0
Sep 1995037916.18$0
Aug 1995053415.92$0
Jul 1995050015.24$0
Jun 1995060316.41$0
May 1995046617.56$0
Apr 1995053217.73$0
Mar 1995063416.44$0
Feb 1995068016.58$0
Jan 1995078615.92$0
Dec 1994087115.03$0
Nov 1994084915.90$0
Oct 199401,01015.58$0
Sep 1994094615.29$0
Aug 1994086416.13$0
Jul 1994099317.56$0
Jun 199401,09717.09$0
May 1994070815.88$0
Apr 1994087314.14$0
Mar 1994075612.46$0
Feb 1994049912.50$0
Jan 1994053312.66$0
Dec 1993068212.33$0
Nov 1993099714.49$0
Oct 199301,00015.85$0
Sep 1993064615.03$0
Aug 1993079015.66$0
Jul 1993087215.46$0
Jun 1993092516.79$0
May 1993062817.68$0
Apr 1993087318.05$0
Mar 1993091418.14$0
Feb 1993093217.90$0
Jan 199301,06916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   36 Mcf  × $  3.05 =       $110

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/39724 is the state's own key, not one this site invented.