CARTER, R. L.

Operated by O'DELL, MITCHELL (P-5 618480) in the MILLERSVIEW, SW. (CAMAR SD.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204390District 7CField 61576075CondensateGasSaveExport
Value, all time
$388 k
May 2004 – May 2026
Value, last 12 filed months
$45
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 10 wells, and the rule below applies to all of them.

Discovered
2000-02-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 10/01/2004.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition523 bbl$28,135
GasProduction57,482 Mcf$359,459
Total$387,594

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4060, -99.7990. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.40604, -99.79898 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,024 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,024 ft.

Completions filed
May 2004
1 of 1 wells
Plug dates filed
Jan 2003
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0953202043,024 ftMay 2004Jan 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

May 202601106.413.05$3
Apr 20260198.932.87$3
Mar 20260189.753.15$3
Feb 20260163.503.75$4
Jan 20260159.138.00$8
Dec 20250156.664.41$4
Nov 20250158.593.93$4
Oct 20250159.383.30$3
Sep 20250162.743.08$3
Aug 20250163.933.01$3
Jul 20250166.743.32$3
Jun 20250166.483.13$3
May 20250160.553.23$3
Apr 20250162.363.54$4
Mar 20250167.704.27$4
Feb 20250170.884.34$4
Jan 20250174.324.28$4
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240278.812.20$4
Apr 20240284.451.66$3
Mar 20240280.301.55$3
Feb 20240276.091.78$4
Jan 20240273.023.30$7
Dec 20230271.262.61$5
Nov 20230277.892.81$6
Oct 20230285.443.09$6
Sep 20230289.042.74$5
Aug 20230280.522.67$5
Jul 20230274.852.64$5
Jun 20230268.962.26$5
May 20230270.622.23$4
Apr 20230278.122.24$4
Mar 20230272.852.39$5
Feb 20230275.112.47$5
Jan 20230276.533.39$7
Dec 20220276.415.73$11
Nov 20220285.005.65$11
Oct 20220287.185.86$12
Sep 20220284.888.16$16
Aug 20220294.529.13$18
Jul 202202101.587.54$15
Jun 202202115.097.98$16
May 202202109.378.43$17
Apr 202202104.226.84$14
Mar 202202108.885.08$10
Feb 20220291.054.86$10
Jan 20220281.844.54$9
Dec 20210271.323.90$8
Nov 20210277.435.24$10
Oct 20210279.795.71$11
Sep 20210269.865.35$11
Aug 20210266.024.22$8
Jul 20210270.783.98$8
Jun 20210269.493.38$7
May 20210263.483.02$6
Apr 20210260.362.76$6
Mar 20210261.302.72$5
Feb 20210257.805.55$11
Jan 20210250.412.81$6
Dec 20200244.642.68$5
Nov 20200238.772.71$5
Oct 20200236.972.48$5
Sep 20200237.091.99$4
Aug 20200239.982.39$5
Jul 20200038.371.83$0
Jun 20200234.901.69$3
May 20200216.921.81$4
Apr 20200614.751.80$11
Mar 20200630.341.86$11
Feb 20200649.881.98$12
Jan 20200657.252.09$13
Dec 20190659.012.30$14
Nov 20190655.302.75$17
Oct 20190653.472.42$15
Sep 20190755.052.66$19
Aug 20190753.112.30$16
Jul 20190756.272.46$17
Jun 20190752.782.49$17
May 20190758.482.74$19
Apr 20190762.632.75$19
Mar 20190856.803.06$25
Feb 20190850.852.79$22
Jan 20190946.033.23$29
Dec 20180946.594.19$38
Nov 20180952.934.24$38
Oct 20180961.443.40$31
Sep 20180959.543.11$28
Aug 20180959.403.07$28
Jul 20180965.142.93$26
Jun 20180960.183.08$28
May 201801065.382.90$29
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180261.782.77$6
Jan 20180262.874.01$8
Dec 20170257.272.92$6
Nov 20170255.423.12$6
Oct 20170049.292.98$0
Sep 20170447.523.09$12
Aug 20170445.373.00$12
Jul 20170443.873.09$12
Jun 20170042.493.09$0
May 20170245.373.26$7
Apr 201701547.933.21$48
Mar 201704746.772.98$140
Feb 201703850.452.95$112
Jan 201704549.413.42$154
Dec 201603548.763.72$130
Nov 201604242.492.64$111
Oct 201604446.193.09$136
Sep 201604741.553.10$146
Aug 201605041.442.92$146
Jul 201606641.622.92$193
Jun 20160345.352.69$8
May 20160442.521.99$8
Apr 201603536.561.99$70
Mar 201604333.011.79$77
Feb 201604326.472.06$89
Jan 201604327.352.36$102
Dec 201503832.362.00$76
Nov 201502938.792.17$63
Oct 201504243.552.43$102
Sep 201504942.992.76$135
Aug 201505940.162.87$169
Jul 201509548.152.95$280
Jun 2015011556.152.88$332
May 2015014055.212.96$414
Apr 2015012749.822.71$344
Mar 2015011842.892.93$346
Feb 201509444.662.98$280
Jan 2015011043.433.10$341
Dec 2014011354.693.59$406
Nov 2014013470.464.25$570
Oct 2014013278.303.90$515
Sep 2014011386.164.05$457
Aug 2014014389.394.04$577
Jul 2014015496.564.18$644
Jun 2014012498.164.74$587
May 2014014094.734.73$662
Apr 2014014895.944.81$712
Mar 2014013795.895.06$693
Feb 2014014497.406.19$892
Jan 2014014390.404.86$695
Dec 2013011391.824.35$492
Nov 2013014488.853.74$538
Oct 2013013497.423.78$506
Sep 20130111104.113.72$413
Aug 2013032104.253.52$113
Jul 20130135102.523.72$502
Jun 2013012794.403.93$500
May 2013015594.834.15$643
Apr 2013015193.964.28$647
Mar 2013016993.623.91$661
Feb 2013015491.233.42$527
Jan 2013015591.603.42$530
Dec 2012015786.773.42$537
Nov 2012017986.953.62$649
Oct 2012017089.383.40$578
Sep 2012018194.672.92$528
Aug 2012023292.662.91$675
Jul 2012026885.133.02$810
Jun 2012024579.822.52$617
May 2012028291.612.49$702
Apr 20120220101.652.00$439
Mar 20120315105.052.22$700
Feb 20120241101.102.57$619
Jan 2012024198.092.73$659
Dec 2011024196.873.24$781
Nov 2011025595.723.31$844
Oct 2011029284.983.65$1,065
Sep 2011028683.623.99$1,140
Aug 2011031083.404.15$1,286
Jul 2011026294.144.52$1,184
Jun 2011032592.904.64$1,508
May 2011034198.134.40$1,502
Apr 20110292105.964.33$1,265
Mar 2011029096.364.06$1,177
Feb 2011026485.644.18$1,104
Jan 2011029786.504.59$1,363
Dec 2010032185.734.35$1,396
Nov 2010033480.843.80$1,268
Oct 2010020878.103.51$730
Sep 2010027872.633.98$1,106
Aug 2010034373.684.42$1,516
Jul 2010033272.554.74$1,573
Jun 2010032970.364.91$1,616
May 2010039871.124.24$1,686
Apr 2010039781.694.12$1,637
Mar 2010043878.394.39$1,922
Feb 2010034773.585.44$1,889
Jan 2010031574.365.96$1,879
Dec 2009029871.445.48$1,634
Nov 2009034074.593.75$1,276
Oct 2009035472.544.11$1,455
Sep 2009037165.543.06$1,137
Aug 2009044867.423.22$1,442
Jul 2009046861.133.46$1,621
Jun 2009049366.163.90$1,920
May 200912750954.743.93$8,950
Apr 2009051446.773.59$1,844
Mar 2009052342.144.06$2,123
Feb 2009033732.814.63$1,561
Jan 2009034435.865.37$1,848
Dec 2008049037.105.98$2,929
Nov 2008035755.496.86$2,449
Oct 2008020875.246.92$1,440
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 20080261131.0811.39$2,973
Jun 20080261131.3313.03$3,402
May 20080478123.1711.57$5,533
Apr 20080326110.3110.45$3,408
Mar 20080765101.909.66$7,393
Feb 2008037792.538.77$3,307
Jan 2008027890.388.21$2,281
Dec 2007052088.337.30$3,797
Nov 2007048891.677.29$3,558
Oct 2007047182.856.92$3,260
Sep 2007062275.846.24$3,884
Aug 2007045069.066.39$2,875
Jul 2007040470.906.39$2,581
Jun 2007038762.007.55$2,921
May 2007036858.747.85$2,887
Apr 2007051759.617.81$4,035
Mar 2007054156.927.30$3,950
Feb 200717536855.108.22$12,666
Jan 2007052950.306.73$3,559
Dec 2006032856.656.92$2,269
Nov 2006047854.207.62$3,641
Oct 2006055454.906.01$3,332
Sep 2006055760.085.04$2,806
Aug 2006059668.717.34$4,375
Jul 2006046069.376.34$2,918
Jun 2006037466.286.38$2,388
May 2006021966.016.42$1,407
Apr 2006044264.397.36$3,253
Mar 20068946156.707.08$8,312
Feb 2006052857.597.75$4,093
Jan 200601,00660.598.93$8,987
Dec 200501,04454.9413.42$14,006
Nov 2005045954.6910.59$4,860
Oct 2005088458.3413.80$12,195
Sep 200501,04061.4512.08$12,562
Aug 2005051761.519.80$5,065
Jul 2005079055.697.84$6,196
Jun 2005027552.337.38$2,030
May 2005069245.226.65$4,603
Apr 20051321,21149.207.36$15,408
Mar 200501,06250.377.15$7,598
Feb 200501,09245.226.31$6,893
Jan 200501,20643.166.32$7,625
Dec 2004090339.866.75$6,096
Nov 2004098145.286.33$6,210
Oct 200401,34249.706.52$8,743
Sep 200401,24443.245.28$6,573
Aug 200401,49442.375.55$8,293
Jul 200402,41738.286.08$14,705
Jun 200402,99036.106.43$19,235
May 20040037.486.49$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/204390 is the state's own key, not one this site invented.