CARTER R. L.

Operated by O'DELL, MITCHELL (P-5 618480) in the MILLERSVIEW, SW. (CAMAR SD.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212290District 7CField 61576075GasSaveExport
Value, all time
$120 k
Jul 2005 – May 2026
Value, last 12 filed months
$45
at the published price for each month
Months reported
251
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 10 wells, and the rule below applies to all of them.

Discovered
2000-02-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 10/01/2004.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction17,892 Mcf$119,732
Total$119,732

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4012, -99.8009. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.40123, -99.80092 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,043 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,043 ft.

Completions filed
Jul 2005
1 of 1 wells

1 well

42-0953211783,043 ftJul 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (251)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

251 months

May 20261106.413.05$3
Apr 2026198.932.87$3
Mar 2026189.753.15$3
Feb 2026163.503.75$4
Jan 2026159.138.00$8
Dec 2025156.664.41$4
Nov 2025158.593.93$4
Oct 2025159.383.30$3
Sep 2025162.743.08$3
Aug 2025163.933.01$3
Jul 2025166.743.32$3
Jun 2025166.483.13$3
May 2025160.553.23$3
Apr 2025162.363.54$4
Mar 2025167.704.27$4
Feb 2025170.884.34$4
Jan 2025174.324.28$4
Dec 2024168.993.12$3
Nov 2024169.052.20$2
Oct 2024171.372.28$2
Sep 2024169.612.36$2
Aug 2024175.632.06$2
Jul 2024179.932.15$2
Jun 2024178.082.63$3
May 2024178.812.20$2
Apr 2024184.451.66$2
Mar 2024180.301.55$2
Feb 2024176.091.78$2
Jan 2024173.023.30$3
Dec 2023171.262.61$3
Nov 2023177.892.81$3
Oct 2023185.443.09$3
Sep 2023189.042.74$3
Aug 2023180.522.67$3
Jul 2023174.852.64$3
Jun 2023168.962.26$2
May 2023170.622.23$2
Apr 2023178.122.24$2
Mar 2023172.852.39$2
Feb 2023175.112.47$2
Jan 2023176.533.39$3
Dec 2022176.415.73$6
Nov 2022185.005.65$6
Oct 2022187.185.86$6
Sep 2022184.888.16$8
Aug 2022194.529.13$9
Jul 20221101.587.54$8
Jun 20221115.097.98$8
May 20221109.378.43$8
Apr 20221104.226.84$7
Mar 20221108.885.08$5
Feb 2022191.054.86$5
Jan 2022181.844.54$5
Dec 2021171.323.90$4
Nov 2021177.435.24$5
Oct 2021179.795.71$6
Sep 2021169.865.35$5
Aug 2021166.024.22$4
Jul 2021170.783.98$4
Jun 2021169.493.38$3
May 2021163.483.02$3
Apr 2021260.362.76$6
Mar 2021261.302.72$5
Feb 2021257.805.55$11
Jan 2021250.412.81$6
Dec 2020244.642.68$5
Nov 2020238.772.71$5
Oct 2020236.972.48$5
Sep 2020237.091.99$4
Aug 2020239.982.39$5
Jul 2020038.371.83$0
Jun 2020234.901.69$3
May 2020216.921.81$4
Apr 2020214.751.80$4
Mar 2020230.341.86$4
Feb 2020249.881.98$4
Jan 2020257.252.09$4
Dec 2019259.012.30$5
Nov 2019255.302.75$6
Oct 2019253.472.42$5
Sep 2019255.052.66$5
Aug 2019253.112.30$5
Jul 2019256.272.46$5
Jun 2019252.782.49$5
May 2019258.482.74$5
Apr 2019862.632.75$22
Mar 2019956.803.06$28
Feb 2019950.852.79$25
Jan 20191046.033.23$32
Dec 20181046.594.19$42
Nov 20181052.934.24$42
Oct 20181061.443.40$34
Sep 20181059.543.11$31
Aug 20181059.403.07$31
Jul 20181065.142.93$29
Jun 20181060.183.08$31
May 20181365.382.90$38
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018261.782.77$6
Jan 2018262.874.01$8
Dec 2017257.272.92$6
Nov 2017255.423.12$6
Oct 2017049.292.98$0
Sep 2017247.523.09$6
Aug 2017345.373.00$9
Jul 2017343.873.09$9
Jun 2017042.493.09$0
May 2017245.373.26$7
Apr 2017647.933.21$19
Mar 20171846.772.98$54
Feb 20171550.452.95$44
Jan 20171849.413.42$62
Dec 20161448.763.72$52
Nov 20161742.492.64$45
Oct 20161746.193.09$53
Sep 20161941.553.10$59
Aug 20162041.442.92$58
Jul 20162641.622.92$76
Jun 2016145.352.69$3
May 2016242.521.99$4
Apr 20161436.561.99$28
Mar 20161733.011.79$31
Feb 20161726.472.06$35
Jan 20161727.352.36$40
Dec 20151532.362.00$30
Nov 20151138.792.17$24
Oct 20151743.552.43$41
Sep 20152042.992.76$55
Aug 20152340.162.87$66
Jul 20153848.152.95$112
Jun 20154556.152.88$130
May 20155655.212.96$166
Apr 20155049.822.71$135
Mar 20154742.892.93$138
Feb 20153744.662.98$110
Jan 20154443.433.10$136
Dec 20144554.693.59$162
Nov 20145370.464.25$225
Oct 20145278.303.90$203
Sep 20144586.164.05$182
Aug 20145789.394.04$230
Jul 20146796.564.18$280
Jun 20144998.164.74$232
May 20145594.734.73$260
Apr 20145995.944.81$284
Mar 20145495.895.06$273
Feb 20145797.406.19$353
Jan 20145790.404.86$277
Dec 20134591.824.35$196
Nov 20135788.853.74$213
Oct 20135397.423.78$200
Sep 201344104.113.72$164
Aug 201313104.253.52$46
Jul 201354102.523.72$201
Jun 20135094.403.93$197
May 20136194.834.15$253
Apr 20135993.964.28$253
Mar 20136793.623.91$262
Feb 20136191.233.42$209
Jan 20136291.603.42$212
Dec 20126286.773.42$212
Nov 20127186.953.62$257
Oct 20126789.383.40$228
Sep 20127294.672.92$210
Aug 20129292.662.91$268
Jul 201210685.133.02$320
Jun 20129779.822.52$244
May 201211291.612.49$279
Apr 201287101.652.00$174
Mar 2012125105.052.22$278
Feb 201296101.102.57$247
Jan 20129698.092.73$262
Dec 20119596.873.24$308
Nov 201110195.723.31$334
Oct 201111684.983.65$423
Sep 201111383.623.99$450
Aug 201112383.404.15$510
Jul 201110494.144.52$470
Jun 201112992.904.64$599
May 201113598.134.40$595
Apr 2011116105.964.33$503
Mar 201111596.364.06$467
Feb 201110585.644.18$439
Jan 201111786.504.59$537
Dec 201012785.734.35$552
Nov 201013280.843.80$501
Oct 20108278.103.51$288
Sep 201011072.633.98$438
Aug 201013673.684.42$601
Jul 201013272.554.74$625
Jun 201013070.364.91$638
May 201015871.124.24$669
Apr 201015781.694.12$647
Mar 201017378.394.39$759
Feb 201013873.585.44$751
Jan 201012574.365.96$746
Dec 200911871.445.48$647
Nov 200913574.593.75$506
Oct 200914072.544.11$575
Sep 200914765.543.06$451
Aug 200917767.423.22$570
Jul 200918661.133.46$644
Jun 200919566.163.90$760
May 200920254.743.93$793
Apr 200920346.773.59$728
Mar 200920742.144.06$840
Feb 200912632.814.63$584
Jan 200915735.865.37$843
Dec 200818237.105.98$1,088
Nov 20088855.496.86$604
Oct 200811575.246.92$796
Sep 2008141101.767.88$1,111
Aug 2008168114.228.48$1,425
Jul 2008327131.0811.39$3,724
Jun 2008262131.3313.03$3,415
May 2008249123.1711.57$2,882
Apr 2008251110.3110.45$2,624
Mar 2008120101.909.66$1,160
Feb 20082692.538.77$228
Jan 20086790.388.21$550
Dec 200713488.337.30$978
Nov 200713991.677.29$1,014
Oct 200717482.856.92$1,204
Sep 200723075.846.24$1,436
Aug 200715469.066.39$984
Jul 200719670.906.39$1,252
Jun 200719662.007.55$1,480
May 200731358.747.85$2,456
Apr 200723559.617.81$1,834
Mar 200725456.927.30$1,855
Feb 200716955.108.22$1,389
Jan 200710450.306.73$700
Dec 200635356.656.92$2,442
Nov 200629954.207.62$2,278
Oct 200632354.906.01$1,942
Sep 2006060.085.04$0
Aug 200614568.717.34$1,064
Jul 200611469.376.34$723
Jun 200610466.286.38$664
May 200611966.016.42$765
Apr 200633764.397.36$2,480
Mar 200621856.707.08$1,544
Feb 200631157.597.75$2,411
Jan 200643360.598.93$3,868
Dec 200551554.9413.42$6,909
Nov 200553054.6910.59$5,612
Oct 200543658.3413.80$6,015
Sep 200577961.4512.08$9,410
Aug 200537661.519.80$3,684
Jul 2005055.697.84$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                    1 Mcf  × $  3.05 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/212290 is the state's own key, not one this site invented.