DUKE WILSON 187

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204495District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.7 M
May 2003 – May 2026
Value, last 12 filed months
$90 k
at the published price for each month
Months reported
277
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-03-11152796
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition358 bbl$25,160
GasProduction732,409 Mcf$3,680,516
Total$3,705,676

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4229, -100.7788. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42289, -100.77878 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,650 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,650 ft.

Completions filed
May 2003
1 of 1 wells

1 well

42-43536230118,650 ftMay 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (277)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

277 months

May 202671,833106.413.05$6,328
Apr 2026171,79198.932.87$6,821
Mar 2026181,81189.753.15$7,319
Feb 2026171,67363.503.75$7,354
Jan 202601,80459.138.00$14,428
Dec 2025251,91656.664.41$9,873
Nov 202571,76758.593.93$7,348
Oct 2025161,86359.383.30$7,107
Sep 202501,79862.743.08$5,532
Aug 2025151,76563.933.01$6,280
Jul 202571,75666.743.32$6,289
Jun 202501,63466.483.13$5,112
May 202571,86560.553.23$6,452
Apr 2025251,88462.363.54$8,234
Mar 2025151,84467.704.27$8,886
Feb 202581,60270.884.34$7,521
Jan 2025101,79174.324.28$8,406
Dec 202461,79768.993.12$6,023
Nov 202461,73769.052.20$4,233
Oct 202481,79171.372.28$4,657
Sep 2024141,72369.612.36$5,048
Aug 202461,79075.632.06$4,148
Jul 2024131,77079.932.15$4,839
Jun 202451,70078.082.63$4,868
May 202461,77678.812.20$4,377
Apr 2024191,70684.451.66$4,435
Mar 202451,75780.301.55$3,116
Feb 2024121,66376.091.78$3,879
Jan 2024121,74773.023.30$6,637
Dec 2023121,75471.262.61$5,434
Nov 202351,70377.892.81$5,171
Oct 202341,80085.443.09$5,899
Sep 202301,69889.042.74$4,644
Aug 202301,63780.522.67$4,376
Jul 20230074.852.64$0
Jun 2023015668.962.26$352
May 2023072470.622.23$1,613
Apr 202301,23978.122.24$2,773
Mar 202301,21672.852.39$2,910
Feb 202301,51275.112.47$3,728
Jan 202301,85576.533.39$6,284
Dec 202201,90076.415.73$10,885
Nov 202201,80685.005.65$10,197
Oct 202201,88087.185.86$11,024
Sep 202201,81584.888.16$14,817
Aug 202201,90794.529.13$17,405
Jul 202201,920101.587.54$14,481
Jun 202201,814115.097.98$14,471
May 202201,913109.378.43$16,132
Apr 202201,860104.226.84$12,718
Mar 202201,956108.885.08$9,929
Feb 202201,76191.054.86$8,556
Jan 202201,93781.844.54$8,789
Dec 202101,93871.323.90$7,556
Nov 202101,86777.435.24$9,777
Oct 202101,93379.795.71$11,045
Sep 202101,86169.865.35$9,958
Aug 202101,91966.024.22$8,099
Jul 202101,85870.783.98$7,399
Jun 202101,96569.493.38$6,643
May 202101,95463.483.02$5,897
Apr 202101,62960.362.76$4,493
Mar 202101,97061.302.72$5,352
Feb 202101,60057.805.55$8,877
Jan 202101,84350.412.81$5,179
Dec 202001,89344.642.68$5,065
Nov 202001,82838.772.71$4,948
Oct 202001,92436.972.48$4,769
Sep 202001,85237.091.99$3,687
Aug 202001,85739.982.39$4,429
Jul 202001,89738.371.83$3,462
Jun 202001,85034.901.69$3,127
May 202001,88316.921.81$3,417
Apr 202001,79814.751.80$3,244
Mar 202001,87730.341.86$3,484
Feb 202001,70649.881.98$3,379
Jan 202001,87357.252.09$3,923
Dec 201901,95859.012.30$4,512
Nov 201901,97155.302.75$5,422
Oct 201901,95853.472.42$4,736
Sep 201902,00755.052.66$5,333
Aug 201901,94553.112.30$4,482
Jul 201902,10656.272.46$5,181
Jun 201902,07352.782.49$5,164
May 201902,14558.482.74$5,878
Apr 201902,08162.632.75$5,724
Mar 201902,17256.803.06$6,651
Feb 201902,01050.852.79$5,612
Jan 201902,25046.033.23$7,263
Dec 201801,61546.594.19$6,759
Nov 201802,07952.934.24$8,809
Oct 201811,93961.443.40$6,650
Sep 201801,55259.543.11$4,824
Aug 201801,23559.403.07$3,787
Jul 201801,59865.142.93$4,685
Jun 201801,59860.183.08$4,917
May 201801,68065.382.90$4,873
Apr 201801,60963.842.90$4,667
Mar 201801,58561.222.79$4,417
Feb 201801,41561.782.77$3,914
Jan 201801,78562.874.01$7,157
Dec 201701,81357.272.92$5,297
Nov 201711,74655.423.12$5,500
Oct 201711,84249.292.98$5,545
Sep 201711,60947.523.09$5,015
Aug 201722,05245.373.00$6,256
Jul 201702,06343.873.09$6,369
Jun 201731,97942.493.09$6,237
May 201712,07945.373.26$6,830
Apr 201712,09447.933.21$6,773
Mar 201711,10046.772.98$3,329
Feb 2017283250.452.95$2,557
Jan 201711,53549.413.42$5,297
Dec 201611,94548.763.72$7,290
Nov 201612,22442.492.64$5,924
Oct 201612,25246.193.09$7,005
Sep 201602,19841.553.10$6,815
Aug 201612,30841.442.92$6,791
Jul 201602,39641.622.92$7,007
Jun 201612,09645.352.69$5,675
May 201602,17642.521.99$4,333
Apr 201602,20436.561.99$4,388
Mar 201632,32633.011.79$4,272
Feb 201602,01626.472.06$4,160
Jan 201612,47527.352.36$5,879
Dec 201512,26532.362.00$4,566
Nov 201512,08038.792.17$4,547
Oct 201511,80243.552.43$4,416
Sep 201511,79942.992.76$5,005
Aug 201512,13240.162.87$6,164
Jul 201512,06948.152.95$6,142
Jun 201501,75056.152.88$5,045
May 201501,89355.212.96$5,595
Apr 201501,81649.822.71$4,915
Mar 201501,69142.892.93$4,963
Feb 201501,81244.662.98$5,393
Jan 201502,45443.433.10$7,609
Dec 201402,31454.693.59$8,310
Nov 201402,20570.464.25$9,375
Oct 201401,89278.303.90$7,381
Sep 201401,61786.164.05$6,541
Aug 201402,06189.394.04$8,316
Jul 201412,49496.564.18$10,520
Jun 201402,31398.164.74$10,956
May 201402,27594.734.73$10,753
Apr 201402,54895.944.81$12,254
Mar 201402,63395.895.06$13,315
Feb 201402,36197.406.19$14,619
Jan 201402,68890.404.86$13,066
Dec 201302,58791.824.35$11,265
Nov 201302,50188.853.74$9,349
Oct 2013037597.423.78$1,417
Sep 201301,980104.113.72$7,361
Aug 201301,971104.253.52$6,943
Jul 201302,434102.523.72$9,049
Jun 201302,40594.403.93$9,460
May 201302,57194.834.15$10,667
Apr 201302,52893.964.28$10,826
Mar 201302,63193.623.91$10,295
Feb 201302,37291.233.42$8,112
Jan 201302,65091.603.42$9,063
Dec 201202,66386.773.42$9,108
Nov 201202,40586.953.62$8,718
Oct 201202,30489.383.40$7,833
Sep 201202,39494.672.92$6,987
Aug 201202,55892.662.91$7,439
Jul 201202,61885.133.02$7,908
Jun 201202,49479.822.52$6,282
May 201202,64991.612.49$6,592
Apr 201202,527101.652.00$5,046
Mar 201202,576105.052.22$5,724
Feb 201202,490101.102.57$6,400
Jan 201202,60598.092.73$7,122
Dec 201102,77996.873.24$9,003
Nov 201102,72095.723.31$9,007
Oct 201102,51384.983.65$9,169
Sep 201102,40783.623.99$9,594
Aug 201102,78283.404.15$11,543
Jul 201102,65894.144.52$12,007
Jun 201102,56692.904.64$11,906
May 201102,93998.134.40$12,946
Apr 201102,394105.964.33$10,374
Mar 201102,41396.364.06$9,790
Feb 201102,24685.644.18$9,388
Jan 201102,80086.504.59$12,849
Dec 201002,84785.734.35$12,378
Nov 201002,81980.843.80$10,699
Oct 201002,93578.103.51$10,299
Sep 201002,88572.633.98$11,481
Aug 201003,04273.684.42$13,444
Jul 201003,09172.554.74$14,640
Jun 201003,04470.364.91$14,947
May 201003,19471.124.24$13,527
Apr 201003,14381.694.12$12,958
Mar 201003,06778.394.39$13,460
Feb 201002,30273.585.44$12,528
Jan 201002,67574.365.96$15,954
Dec 200903,12471.445.48$17,131
Nov 200903,05874.593.75$11,472
Oct 200903,13472.544.11$12,882
Sep 200903,07265.543.06$9,415
Aug 200903,17067.423.22$10,203
Jul 200903,16561.133.46$10,965
Jun 200903,11266.163.90$12,121
May 200903,28754.743.93$12,904
Apr 200903,18446.773.59$11,423
Mar 200903,32342.144.06$13,488
Feb 200903,10532.814.63$14,385
Jan 200903,40935.865.37$18,310
Dec 200803,49937.105.98$20,914
Nov 200803,37855.496.86$23,174
Oct 200803,50775.246.92$24,275
Sep 200803,444101.767.88$27,129
Aug 200803,661114.228.48$31,056
Jul 200803,750131.0811.39$42,710
Jun 200803,721131.3313.03$48,494
May 200803,707123.1711.57$42,906
Apr 200803,291110.3110.45$34,407
Mar 200803,456101.909.66$33,399
Feb 200803,36092.538.77$29,469
Jan 200803,47590.388.21$28,515
Dec 200703,50888.337.30$25,615
Nov 200704,01991.677.29$29,305
Oct 200703,92082.856.92$27,134
Sep 200703,44875.846.24$21,530
Aug 200703,60069.066.39$22,997
Jul 200703,71470.906.39$23,725
Jun 200703,59362.007.55$27,122
May 200703,68758.747.85$28,929
Apr 200703,54959.617.81$27,701
Mar 200703,36756.927.30$24,586
Feb 200702,81155.108.22$23,095
Jan 200702,94350.306.73$19,797
Dec 200603,70156.656.92$25,605
Nov 200603,73854.207.62$28,474
Oct 200603,93854.906.01$23,682
Sep 200603,98460.085.04$20,068
Aug 200603,73268.717.34$27,393
Jul 200603,77969.376.34$23,969
Jun 200603,76866.286.38$24,054
May 200603,93566.016.42$25,282
Apr 200603,69364.397.36$27,182
Mar 200603,80856.707.08$26,972
Feb 200603,61357.597.75$28,005
Jan 200604,10960.598.93$36,707
Dec 200503,97654.9413.42$53,340
Nov 200503,80354.6910.59$40,268
Oct 200503,98858.3413.80$55,017
Sep 200503,88561.4512.08$46,927
Aug 200502,96561.519.80$29,048
Jul 200505,03255.697.84$39,469
Jun 200504,70052.337.38$34,691
May 200504,48345.226.65$29,817
Apr 200504,90349.207.36$36,088
Mar 200504,94950.377.15$35,410
Feb 200504,60045.226.31$29,035
Jan 200505,16443.166.32$32,648
Dec 200406,11739.866.75$41,296
Nov 200405,09845.286.33$32,272
Oct 200405,40549.706.52$35,214
Sep 200404,99943.245.28$26,414
Aug 200405,60142.375.55$31,089
Jul 200404,59938.286.08$27,981
Jun 200404,86636.106.43$31,303
May 200404,93537.486.49$32,051
Apr 200404,92534.475.86$28,853
Mar 200405,32834.365.53$29,465
Feb 200404,77132.455.51$26,286
Jan 200405,83132.036.30$36,733
Dec 200305,49730.266.30$34,640
Nov 200305,46928.804.60$25,131
Oct 200306,48528.174.76$30,866
Sep 200306,55026.314.75$31,108
Aug 200306,82229.765.13$34,995
Jul 200307,07729.415.17$36,594
Jun 200307,96128.565.98$47,630
May 200303,34526.595.97$19,979

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             7 bbl  × $106.41 =       $745
Gas                1,833 Mcf  × $  3.05 =     $5,583

────────────────────────────────────────────────────
Month total                                   $6,328

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/204495 is the state's own key, not one this site invented.