BAILEY

Operated by ZARVONA ENERGY LLC (P-5 950523) in the OZONA, NE. (CANYON 7520) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205643District 7CField 679985002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
May 2004 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 592 leases and 641 wells, and the rule below applies to all of them.

Discovered
1966-01-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-10-22.

The Commission's schedule remark for this field reads: PER DOCKET 01-0299858, THIS FIELD HAS BEEN DESIGNATED AS A UFT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-05-06161464
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,545 bbl$202,001
GasProduction250,639 Mcf$1,489,575
Total$1,691,576

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.8150, -100.9912. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.81504, -100.99122 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,500 ft.

Completions filed
May 2004
1 of 1 wells

1 well

42-105392581028,500 ftMay 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

May 2026017106.413.05$52
Apr 20260298.932.87$6
Mar 202602189.753.15$66
Feb 2026012363.503.75$461
Jan 2026016459.138.00$1,312
Dec 2025013756.664.41$605
Nov 2025016858.593.93$660
Oct 20255316459.383.30$3,689
Sep 2025016462.743.08$505
Aug 2025015763.933.01$473
Jul 2025016966.743.32$560
Jun 2025016966.483.13$529
May 2025017860.553.23$575
Apr 202501962.363.54$67
Mar 2025017267.704.27$734
Feb 2025011970.884.34$517
Jan 2025017474.324.28$744
Dec 2024017468.993.12$543
Nov 2024016469.052.20$361
Oct 2024017971.372.28$408
Sep 2024017269.612.36$407
Aug 2024016375.632.06$336
Jul 2024016779.932.15$358
Jun 2024015078.082.63$395
May 2024017978.812.20$394
Apr 2024016584.451.66$274
Mar 2024017780.301.55$273
Feb 2024016276.091.78$289
Jan 2024017173.023.30$564
Dec 2023019071.262.61$496
Nov 2023018277.892.81$511
Oct 2023018185.443.09$559
Sep 2023018489.042.74$503
Aug 2023016280.522.67$433
Jul 2023017674.852.64$465
Jun 2023016968.962.26$382
May 2023016070.622.23$356
Apr 2023020678.122.24$461
Mar 2023016372.852.39$390
Feb 2023018375.112.47$451
Jan 2023019776.533.39$667
Dec 2022020476.415.73$1,169
Nov 2022022085.005.65$1,242
Oct 2022014687.185.86$856
Sep 2022018084.888.16$1,469
Aug 2022019294.529.13$1,752
Jul 20220188101.587.54$1,418
Jun 20220157115.097.98$1,252
May 20220224109.378.43$1,889
Apr 20220217104.226.84$1,484
Mar 20220216108.885.08$1,097
Feb 2022018891.054.86$913
Jan 2022021181.844.54$957
Dec 2021021471.323.90$834
Nov 2021020277.435.24$1,058
Oct 2021021279.795.71$1,211
Sep 2021021969.865.35$1,172
Aug 2021022366.024.22$941
Jul 2021022970.783.98$912
Jun 2021022969.493.38$774
May 2021024463.483.02$736
Apr 2021025460.362.76$701
Mar 2021026661.302.72$723
Feb 2021021057.805.55$1,165
Jan 2021026550.412.81$745
Dec 2020027144.642.68$725
Nov 2020026638.772.71$720
Oct 2020027136.972.48$672
Sep 2020027837.091.99$554
Aug 2020036939.982.39$880
Jul 2020029438.371.83$537
Jun 2020028834.901.69$487
May 2020030216.921.81$548
Apr 2020029214.751.80$527
Mar 2020030330.341.86$562
Feb 2020029049.881.98$574
Jan 2020031857.252.09$666
Dec 2019030559.012.30$703
Nov 2019030655.302.75$842
Oct 2019031353.472.42$757
Sep 2019033555.052.66$890
Aug 2019035353.112.30$813
Jul 2019035556.272.46$873
Jun 2019033552.782.49$835
May 2019036158.482.74$989
Apr 2019035362.632.75$971
Mar 2019035756.803.06$1,093
Feb 2019034650.852.79$966
Jan 2019037846.033.23$1,220
Dec 2018038746.594.19$1,620
Nov 2018036452.934.24$1,542
Oct 2018039461.443.40$1,339
Sep 2018041159.543.11$1,277
Aug 2018040759.403.07$1,248
Jul 2018042565.142.93$1,246
Jun 20183841160.183.08$3,551
May 2018041765.382.90$1,210
Apr 2018039663.842.90$1,149
Mar 2018041761.222.79$1,162
Feb 2018037361.782.77$1,032
Jan 2018041462.874.01$1,660
Dec 2017042557.272.92$1,242
Nov 2017042355.423.12$1,319
Oct 2017044349.292.98$1,322
Sep 2017039247.523.09$1,210
Aug 2017041345.373.00$1,241
Jul 20175043243.873.09$3,527
Jun 2017043342.493.09$1,337
May 2017044445.373.26$1,449
Apr 2017042947.933.21$1,378
Mar 2017045646.772.98$1,361
Feb 2017040250.452.95$1,187
Jan 2017046149.413.42$1,576
Dec 2016047748.763.72$1,776
Nov 2016046642.492.64$1,232
Oct 2016047646.193.09$1,471
Sep 2016046241.553.10$1,432
Aug 2016048741.442.92$1,424
Jul 2016049141.622.92$1,436
Jun 2016045845.352.69$1,230
May 2016050942.521.99$1,013
Apr 2016146936.561.99$970
Mar 2016045933.011.79$823
Feb 2016040626.472.06$838
Jan 2016043127.352.36$1,019
Dec 2015046232.362.00$925
Nov 2015044638.792.17$967
Oct 2015046643.552.43$1,131
Sep 2015045442.992.76$1,252
Aug 2015046740.162.87$1,341
Jul 2015049448.152.95$1,455
Jun 20155849256.152.88$4,675
May 2015040955.212.96$1,209
Apr 2015048249.822.71$1,305
Mar 2015052542.892.93$1,541
Feb 2015047644.662.98$1,417
Jan 2015151443.433.10$1,637
Dec 2014054154.693.59$1,943
Nov 2014051570.464.25$2,190
Oct 2014048978.303.90$1,908
Sep 2014054386.164.05$2,197
Aug 2014052289.394.04$2,106
Jul 2014055796.564.18$2,328
Jun 2014051398.164.74$2,430
May 20143646394.734.73$5,599
Apr 2014050795.944.81$2,438
Mar 2014043295.895.06$2,185
Feb 2014046197.406.19$2,855
Jan 2014047090.404.86$2,285
Dec 2013041991.824.35$1,825
Nov 2013045388.853.74$1,693
Oct 20134549097.423.78$6,236
Sep 20130403104.113.72$1,498
Aug 20130351104.253.52$1,236
Jul 20130229102.523.72$851
Jun 2013042994.403.93$1,687
May 2013043594.834.15$1,805
Apr 2013049793.964.28$2,128
Mar 2013029093.623.91$1,135
Feb 2013053991.233.42$1,843
Jan 2013047891.603.42$1,635
Dec 201206686.773.42$226
Nov 2012047586.953.62$1,722
Oct 2012344989.383.40$1,795
Sep 2012043594.672.92$1,270
Aug 2012050792.662.91$1,474
Jul 2012052585.133.02$1,586
Jun 2012049479.822.52$1,244
May 2012049091.612.49$1,219
Apr 201259561101.652.00$7,118
Mar 20120618105.052.22$1,373
Feb 20120607101.102.57$1,560
Jan 2012068098.092.73$1,859
Dec 2011070596.873.24$2,284
Nov 2011069295.723.31$2,291
Oct 2011072884.983.65$2,656
Sep 2011072583.623.99$2,890
Aug 2011065383.404.15$2,710
Jul 2011069194.144.52$3,121
Jun 2011067192.904.64$3,113
May 2011078998.134.40$3,475
Apr 20110556105.964.33$2,409
Mar 20116277196.364.06$9,103
Feb 2011065785.644.18$2,746
Jan 2011076486.504.59$3,506
Dec 2010059485.734.35$2,583
Nov 2010061280.843.80$2,323
Oct 2010075578.103.51$2,649
Sep 2010072872.633.98$2,897
Aug 2010070873.684.42$3,129
Jul 20106464972.554.74$7,717
Jun 2010072270.364.91$3,545
May 2010167671.124.24$2,934
Apr 2010078281.694.12$3,224
Mar 2010086678.394.39$3,801
Feb 2010079173.585.44$4,305
Jan 2010086974.365.96$5,183
Dec 2009083771.445.48$4,590
Nov 20092684074.593.75$5,091
Oct 2009086472.544.11$3,551
Sep 200910184865.543.06$9,218
Aug 2009086067.423.22$2,768
Jul 2009084261.133.46$2,917
Jun 2009081566.163.90$3,174
May 2009069154.743.93$2,713
Apr 2009081246.773.59$2,913
Mar 2009082942.144.06$3,365
Feb 2009072732.814.63$3,368
Jan 2009033535.865.37$1,799
Dec 2008071637.105.98$4,280
Nov 2008077755.496.86$5,331
Oct 20084091075.246.92$9,309
Sep 20080308101.767.88$2,426
Aug 20080765114.228.48$6,490
Jul 20080928131.0811.39$10,569
Jun 20080929131.3313.03$12,107
May 20081931,024123.1711.57$35,624
Apr 20080996110.3110.45$10,413
Mar 200801,095101.909.66$10,582
Feb 200801,07792.538.77$9,446
Jan 200801,19790.388.21$9,822
Dec 200701,21388.337.30$8,857
Nov 200701,21591.677.29$8,859
Oct 200701,32182.856.92$9,144
Sep 200701,37175.846.24$8,561
Aug 200701,44369.066.39$9,218
Jul 200701,47770.906.39$9,435
Jun 20071681,41562.007.55$21,097
May 200701,62058.747.85$12,711
Apr 200701,58359.617.81$12,356
Mar 200701,71456.927.30$12,516
Feb 200701,55055.108.22$12,735
Jan 200701,82150.306.73$12,250
Dec 200601,86556.656.92$12,903
Nov 200601,88254.207.62$14,336
Oct 200601,95254.906.01$11,739
Sep 20061732,01660.085.04$20,549
Aug 200602,14568.717.34$15,744
Jul 200602,10469.376.34$13,345
Jun 200602,13466.286.38$13,623
May 200602,38466.016.42$15,317
Apr 20061572,25764.397.36$26,722
Mar 200602,41856.707.08$17,127
Feb 200602,16757.597.75$16,797
Jan 200602,48960.598.93$22,235
Dec 20051602,58754.9413.42$43,496
Nov 200502,59654.6910.59$27,487
Oct 200502,27658.3413.80$31,399
Sep 200502,45561.4512.08$29,654
Aug 20051572,65161.519.80$35,628
Jul 200503,01755.697.84$23,664
Jun 20051463,10552.337.38$30,558
May 200503,34145.226.65$22,222
Apr 200503,54449.207.36$26,086
Mar 20051595,76650.377.15$49,264
Feb 200503,87345.226.31$24,446
Jan 20051806,02843.166.32$45,879
Dec 200407,34239.866.75$49,566
Nov 20041815,55645.286.33$43,367
Oct 20041797,82949.706.52$59,903
Sep 200408,92443.245.28$47,154
Aug 200435912,02842.375.55$81,974
Jul 200435414,66538.286.08$102,776
Jun 200434114,05736.106.43$102,739
May 200401,04537.486.49$6,787

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   17 Mcf  × $  3.05 =        $52

────────────────────────────────────────────────────
Month total                                      $52

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205643 is the state's own key, not one this site invented.