CUSENBARY 60

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205715District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Jan 2004 – May 2026
Value, last 12 filed months
$16 k
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-08156901
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition90 bbl$5,213
GasProduction187,139 Mcf$1,041,968
Total$1,047,181

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3396, -100.5958. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.33957, -100.59577 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,996 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,996 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-4353660165,996 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 20260264106.413.05$804
Apr 2026033998.932.87$973
Mar 2026036289.753.15$1,140
Feb 2026033063.503.75$1,238
Jan 2026030859.138.00$2,463
Dec 2025031656.664.41$1,395
Nov 2025034558.593.93$1,355
Oct 2025035759.383.30$1,180
Sep 2025032162.743.08$988
Aug 2025036863.933.01$1,109
Jul 2025041266.743.32$1,366
Jun 2025047866.483.13$1,496
May 2025041560.553.23$1,341
Apr 2025046562.363.54$1,648
Mar 2025049967.704.27$2,130
Feb 2025042270.884.34$1,832
Jan 2025052574.324.28$2,246
Dec 2024053568.993.12$1,670
Nov 2024056569.052.20$1,242
Oct 2024061671.372.28$1,405
Sep 2024061569.612.36$1,454
Aug 2024060475.632.06$1,246
Jul 2024058879.932.15$1,262
Jun 2024058778.082.63$1,546
May 2024058078.812.20$1,275
Apr 2024046984.451.66$778
Mar 2024039580.301.55$610
Feb 2024017276.091.78$307
Jan 202409573.023.30$313
Dec 2023029871.262.61$778
Nov 2023036077.892.81$1,011
Oct 2023034885.443.09$1,074
Sep 2023046889.042.74$1,280
Aug 2023054680.522.67$1,459
Jul 2023024074.852.64$634
Jun 2023029368.962.26$662
May 2023033070.622.23$735
Apr 2023028978.122.24$647
Mar 2023043972.852.39$1,051
Feb 2023029375.112.47$722
Jan 2023035276.533.39$1,192
Dec 2022034576.415.73$1,977
Nov 2022029885.005.65$1,683
Oct 2022032587.185.86$1,906
Sep 2022038584.888.16$3,143
Aug 2022041294.529.13$3,760
Jul 20220375101.587.54$2,828
Jun 20220404115.097.98$3,223
May 20220531109.378.43$4,478
Apr 20220546104.226.84$3,733
Mar 20220564108.885.08$2,863
Feb 2022049591.054.86$2,405
Jan 2022065581.844.54$2,972
Dec 2021056271.323.90$2,191
Nov 2021033477.435.24$1,749
Oct 2021042379.795.71$2,417
Sep 2021045569.865.35$2,435
Aug 2021028766.024.22$1,211
Jul 2021029570.783.98$1,175
Jun 2021030869.493.38$1,041
May 2021030763.483.02$926
Apr 2021034060.362.76$938
Mar 2021051161.302.72$1,388
Feb 2021056757.805.55$3,146
Jan 2021044550.412.81$1,251
Dec 2020062844.642.68$1,680
Nov 2020066438.772.71$1,797
Oct 2020039936.972.48$989
Sep 2020043137.091.99$858
Aug 2020027639.982.39$658
Jul 2020024338.371.83$444
Jun 2020031934.901.69$539
May 2020051416.921.81$933
Apr 2020037614.751.80$678
Mar 2020042530.341.86$789
Feb 2020039749.881.98$786
Jan 2020031857.252.09$666
Dec 2019022759.012.30$523
Nov 2019019755.302.75$542
Oct 2019017153.472.42$414
Sep 2019019655.052.66$521
Aug 2019020953.112.30$482
Jul 2019015256.272.46$374
Jun 2019025852.782.49$643
May 2019024758.482.74$677
Apr 2019415162.632.75$666
Mar 2019015956.803.06$487
Feb 2019021450.852.79$598
Jan 2019027246.033.23$878
Dec 2018027646.594.19$1,155
Nov 2018025052.934.24$1,059
Oct 2018023561.443.40$799
Sep 2018023259.543.11$721
Aug 2018025859.403.07$791
Jul 2018024965.142.93$730
Jun 2018026760.183.08$822
May 2018030765.382.90$891
Apr 2018010763.842.90$310
Mar 2018017161.222.79$477
Feb 2018019261.782.77$531
Jan 2018023362.874.01$934
Dec 2017021857.272.92$637
Nov 2017039155.423.12$1,219
Oct 2017037349.292.98$1,113
Sep 2017026047.523.09$803
Aug 2017025845.373.00$775
Jul 2017022343.873.09$688
Jun 2017041342.493.09$1,275
May 2017020745.373.26$676
Apr 2017026147.933.21$838
Mar 2017035346.772.98$1,053
Feb 2017038050.452.95$1,122
Jan 2017045249.413.42$1,545
Dec 2016036548.763.72$1,359
Nov 2016041042.492.64$1,084
Oct 2016040846.193.09$1,261
Sep 2016043141.553.10$1,336
Aug 2016051541.442.92$1,506
Jul 2016052341.622.92$1,529
Jun 2016026345.352.69$706
May 2016028542.521.99$567
Apr 2016044536.561.99$886
Mar 2016038633.011.79$692
Feb 2016031026.472.06$640
Jan 2016034827.352.36$823
Dec 2015041732.362.00$835
Nov 2015037938.792.17$821
Oct 2015041043.552.43$995
Sep 2015038342.992.76$1,056
Aug 2015037040.162.87$1,063
Jul 2015037748.152.95$1,110
Jun 2015038156.152.88$1,098
May 2015046855.212.96$1,383
Apr 2015048049.822.71$1,299
Mar 2015034542.892.93$1,012
Feb 2015057244.662.98$1,702
Jan 2015035743.433.10$1,107
Dec 201405354.693.59$190
Nov 201404870.464.25$204
Oct 201406178.303.90$238
Sep 201403086.164.05$121
Aug 201404589.394.04$182
Jul 201403996.564.18$163
Jun 201404098.164.74$189
May 201403894.734.73$180
Apr 201404495.944.81$212
Mar 2014011195.895.06$561
Feb 2014031397.406.19$1,938
Jan 2014040890.404.86$1,983
Dec 2013050991.824.35$2,216
Nov 2013032888.853.74$1,226
Oct 2013029297.423.78$1,104
Sep 20130345104.113.72$1,283
Aug 20130473104.253.52$1,666
Jul 20130288102.523.72$1,071
Jun 2013027294.403.93$1,070
May 2013033494.834.15$1,386
Apr 2013046893.964.28$2,004
Mar 2013052293.623.91$2,043
Feb 2013037991.233.42$1,296
Jan 2013042091.603.42$1,436
Dec 2012053586.773.42$1,830
Nov 2012056686.953.62$2,052
Oct 2012058389.383.40$1,982
Sep 2012050394.672.92$1,468
Aug 2012047892.662.91$1,390
Jul 2012055485.133.02$1,674
Jun 2012053079.822.52$1,335
May 2012061091.612.49$1,518
Apr 20120649101.652.00$1,296
Mar 20120605105.052.22$1,344
Feb 20120593101.102.57$1,524
Jan 2012056298.092.73$1,537
Dec 2011081196.873.24$2,627
Nov 2011076495.723.31$2,530
Oct 2011057884.983.65$2,109
Sep 2011069183.623.99$2,754
Aug 2011030883.404.15$1,278
Jul 2011031594.144.52$1,423
Jun 2011038292.904.64$1,772
May 2011037098.134.40$1,630
Apr 20110598105.964.33$2,591
Mar 2011078096.364.06$3,165
Feb 2011075485.644.18$3,152
Jan 2011089886.504.59$4,121
Dec 2010097685.734.35$4,243
Nov 2010070080.843.80$2,657
Oct 2010077278.103.51$2,709
Sep 2010073972.633.98$2,941
Aug 2010085873.684.42$3,792
Jul 2010085272.554.74$4,035
Jun 2010070770.364.91$3,472
May 2010074671.124.24$3,159
Apr 2010051481.694.12$2,119
Mar 2010068678.394.39$3,011
Feb 2010060273.585.44$3,276
Jan 2010061474.365.96$3,662
Dec 2009574771.445.48$4,454
Nov 2009071874.593.75$2,694
Oct 2009070972.544.11$2,914
Sep 2009065165.543.06$1,995
Aug 2009064267.423.22$2,066
Jul 2009063061.133.46$2,183
Jun 2009052666.163.90$2,049
May 2009053454.743.93$2,096
Apr 2009044246.773.59$1,586
Mar 2009053642.144.06$2,176
Feb 2009558132.814.63$2,856
Jan 2009078835.865.37$4,232
Dec 2008090037.105.98$5,379
Nov 2008073855.496.86$5,063
Oct 2008074075.246.92$5,122
Sep 20080675101.767.88$5,317
Aug 20080610114.228.48$5,175
Jul 20080594131.0811.39$6,765
Jun 20080674131.3313.03$8,784
May 20080764123.1711.57$8,843
Apr 20085795110.3110.45$8,863
Mar 20080827101.909.66$7,992
Feb 2008083892.538.77$7,350
Jan 2008088390.388.21$7,246
Dec 2007088288.337.30$6,440
Nov 2007087791.677.29$6,395
Oct 2007095282.856.92$6,590
Sep 2007590975.846.24$6,055
Aug 2007093369.066.39$5,960
Jul 2007077070.906.39$4,919
Jun 2007676962.007.55$6,177
May 200701,01058.747.85$7,925
Apr 200701,18459.617.81$9,241
Mar 200701,24756.927.30$9,106
Feb 200701,28855.108.22$10,582
Jan 200701,83150.306.73$12,317
Dec 200601,51956.656.92$10,509
Nov 200651,41654.207.62$11,057
Oct 200601,48154.906.01$8,906
Sep 200661,59560.085.04$8,395
Aug 200601,55668.717.34$11,421
Jul 200601,71669.376.34$10,884
Jun 200601,45966.286.38$9,314
May 200641,00066.016.42$6,689
Apr 200601,09464.397.36$8,052
Mar 200651,43956.707.08$10,476
Feb 200601,38257.597.75$10,712
Jan 200661,54860.598.93$14,192
Dec 200501,54354.9413.42$20,700
Nov 200501,47554.6910.59$15,618
Oct 200571,82658.3413.80$25,599
Sep 200501,84961.4512.08$22,334
Aug 200502,08761.519.80$20,446
Jul 200502,45155.697.84$19,225
Jun 200502,98552.337.38$22,032
May 200572,98145.226.65$20,144
Apr 200502,54549.207.36$18,732
Mar 200502,14750.377.15$15,362
Feb 200572,25645.226.31$14,556
Jan 200502,33143.166.32$14,737
Dec 200402,48739.866.75$16,790
Nov 200402,48745.286.33$15,744
Oct 200452,16749.706.52$14,367
Sep 200402,26243.245.28$11,952
Aug 200402,22042.375.55$12,322
Jul 200482,05538.286.08$12,809
Jun 200402,43136.106.43$15,639
May 200403,07237.486.49$19,951
Apr 200403,43534.475.86$20,124
Mar 200403,82434.365.53$21,147
Feb 200404,32832.455.51$23,846
Jan 200404,44432.036.30$27,996

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  264 Mcf  × $  3.05 =       $804

────────────────────────────────────────────────────
Month total                                     $804

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/205715 is the state's own key, not one this site invented.