CUSENBARY 60

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208241District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$517 k
Apr 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
266
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-07-08158445
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition59 bbl$3,559
GasProduction80,314 Mcf$513,166
Total$516,725

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3390, -100.5992. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.33897, -100.59925 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,652 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,652 ft.

Completions filed
Apr 2004
1 of 1 wells

1 well

42-4353677475,652 ftApr 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (266)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

266 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210163.483.02$3
Apr 20210060.362.76$0
Mar 20210161.302.72$3
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200134.901.69$2
May 20200316.921.81$5
Apr 20200314.751.80$5
Mar 20200130.341.86$2
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20192062.632.75$125
Mar 20190056.803.06$0
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 20180259.403.07$6
Jul 20180265.142.93$6
Jun 20180260.183.08$6
May 20180365.382.90$9
Apr 201801863.842.90$52
Mar 201801961.222.79$53
Feb 20180861.782.77$22
Jan 20180962.874.01$36
Dec 20170957.272.92$26
Nov 20170955.423.12$28
Oct 20170749.292.98$21
Sep 20170647.523.09$19
Aug 20170645.373.00$18
Jul 20170643.873.09$19
Jun 201701042.493.09$31
May 201701645.373.26$52
Apr 20170247.933.21$6
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170149.413.42$3
Dec 20160148.763.72$4
Nov 20160142.492.64$3
Oct 20160146.193.09$3
Sep 20160241.553.10$6
Aug 20160541.442.92$15
Jul 20160641.622.92$18
Jun 201605745.352.69$153
May 2016044042.521.99$876
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201411178.303.90$121
Sep 20140786.164.05$28
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140394.734.73$14
Apr 20140295.944.81$10
Mar 201402595.895.06$126
Feb 201404897.406.19$297
Jan 201407290.404.86$350
Dec 201307691.824.35$331
Nov 201307588.853.74$280
Oct 201309797.423.78$367
Sep 2013092104.113.72$342
Aug 2013097104.253.52$342
Jul 2013063102.523.72$234
Jun 201307394.403.93$287
May 201308994.834.15$369
Apr 2013013093.964.28$557
Mar 2013014193.623.91$552
Feb 2013012791.233.42$434
Jan 2013015791.603.42$537
Dec 2012015786.773.42$537
Nov 2012016786.953.62$605
Oct 2012017689.383.40$598
Sep 2012016394.672.92$476
Aug 2012016192.662.91$468
Jul 2012018285.133.02$550
Jun 2012019179.822.52$481
May 2012022391.612.49$555
Apr 20120245101.652.00$489
Mar 20120267105.052.22$593
Feb 20120276101.102.57$709
Jan 2012029798.092.73$812
Dec 2011031896.873.24$1,030
Nov 2011030095.723.31$993
Oct 2011031884.983.65$1,160
Sep 2011044183.623.99$1,758
Aug 2011058283.404.15$2,415
Jul 2011058894.144.52$2,656
Jun 2011049792.904.64$2,306
May 2011060498.134.40$2,661
Apr 20110650105.964.33$2,817
Mar 2011061396.364.06$2,487
Feb 2011058685.644.18$2,449
Jan 2011066786.504.59$3,061
Dec 2010066985.734.35$2,909
Nov 2010061680.843.80$2,338
Oct 2010075278.103.51$2,639
Sep 2010087172.633.98$3,466
Aug 2010097473.684.42$4,304
Jul 2010030272.554.74$1,430
Jun 2010033570.364.91$1,645
May 2010034371.124.24$1,453
Apr 2010034781.694.12$1,431
Mar 2010037978.394.39$1,663
Feb 2010037673.585.44$2,046
Jan 2010041774.365.96$2,487
Dec 2009542971.445.48$2,710
Nov 2009064974.593.75$2,435
Oct 2009068572.544.11$2,816
Sep 2009062965.543.06$1,928
Aug 2009065067.423.22$2,092
Jul 2009069261.133.46$2,397
Jun 2009062466.163.90$2,430
May 2009079054.743.93$3,101
Apr 2009054446.773.59$1,952
Mar 2009073942.144.06$3,000
Feb 2009559432.814.63$2,916
Jan 2009076335.865.37$4,098
Dec 2008075937.105.98$4,537
Nov 2008073755.496.86$5,056
Oct 2008081675.246.92$5,648
Sep 20080819101.767.88$6,451
Aug 20080857114.228.48$7,270
Jul 20080846131.0811.39$9,635
Jun 20080844131.3313.03$11,000
May 20080893123.1711.57$10,336
Apr 20085867110.3110.45$9,616
Mar 20080897101.909.66$8,669
Feb 2008082592.538.77$7,236
Jan 2008093490.388.21$7,664
Dec 2007095588.337.30$6,973
Nov 2007094291.677.29$6,869
Oct 200701,01482.856.92$7,019
Sep 200761,00175.846.24$6,705
Aug 200701,08869.066.39$6,950
Jul 200701,13670.906.39$7,257
Jun 200751,17362.007.55$9,164
May 2007085658.747.85$6,716
Apr 2007092159.617.81$7,189
Mar 2007097356.927.30$7,105
Feb 2007097155.108.22$7,978
Jan 200701,10050.306.73$7,400
Dec 200601,14456.656.92$7,915
Nov 200641,08354.207.62$8,467
Oct 200601,08054.906.01$6,495
Sep 200621,16760.085.04$5,999
Aug 200601,16368.717.34$8,536
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 2006110166.016.42$715
Apr 2006036664.397.36$2,694
Mar 2006244856.707.08$3,287
Feb 2006039957.597.75$3,093
Jan 2006253060.598.93$4,856
Dec 2005057354.9413.42$7,687
Nov 2005054754.6910.59$5,792
Oct 2005253758.3413.80$7,525
Sep 2005056261.4512.08$6,788
Aug 2005094061.519.80$9,209
Jul 200501,26455.697.84$9,914
Jun 200501,30252.337.38$9,610
May 200541,23145.226.65$8,368
Apr 200501,29249.207.36$9,510
Mar 200501,40750.377.15$10,067
Feb 200541,24445.226.31$8,033
Jan 200501,34343.166.32$8,491
Dec 200401,48339.866.75$10,012
Nov 200401,53545.286.33$9,717
Oct 200451,84549.706.52$12,269
Sep 200401,98143.245.28$10,467
Aug 200401,59442.375.55$8,848
Jul 2004483138.286.08$5,209
Jun 200401,61436.106.43$10,383
May 200402,41837.486.49$15,704
Apr 2004017234.475.86$1,008

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2021 — as filed, then multipliedworked
Condensate             0 bbl  × $ 77.43 =         $0
Gas                    1 Mcf  × $  5.24 =         $5

────────────────────────────────────────────────────
Month total                                       $5

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/208241 is the state's own key, not one this site invented.