CAUTHORN 27

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207105District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.4 M
May 2004 – May 2026
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-07-08158055
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition142 bbl$11,980
GasProduction433,241 Mcf$2,401,454
Total$2,413,434

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3111, -100.6113. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31114, -100.61132 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,082 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,082 ft.

Completions filed
May 2004
1 of 1 wells

1 well

42-43536777107,082 ftMay 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

May 20260455106.413.05$1,386
Apr 2026037198.932.87$1,065
Mar 2026048889.753.15$1,537
Feb 2026053263.503.75$1,995
Jan 2026055059.138.00$4,399
Dec 2025054356.664.41$2,396
Nov 2025052958.593.93$2,077
Oct 2025034559.383.30$1,140
Sep 2025046762.743.08$1,437
Aug 2025050363.933.01$1,516
Jul 2025050066.743.32$1,658
Jun 2025049766.483.13$1,555
May 2025055860.553.23$1,804
Apr 2025055162.363.54$1,952
Mar 2025053067.704.27$2,262
Feb 2025051370.884.34$2,227
Jan 2025055974.324.28$2,392
Dec 2024057668.993.12$1,798
Nov 2024057869.052.20$1,271
Oct 2024068571.372.28$1,563
Sep 2024035669.612.36$842
Aug 2024059575.632.06$1,228
Jul 2024059679.932.15$1,279
Jun 2024059578.082.63$1,567
May 2024063078.812.20$1,385
Apr 2024049784.451.66$825
Mar 2024053980.301.55$833
Feb 2024050976.091.78$908
Jan 2024054473.023.30$1,794
Dec 2023059171.262.61$1,543
Nov 2023058777.892.81$1,648
Oct 2023056085.443.09$1,729
Sep 2023057189.042.74$1,562
Aug 2023061080.522.67$1,630
Jul 2023080974.852.64$2,137
Jun 2023177668.962.26$1,822
May 2023083070.622.23$1,849
Apr 2023079378.122.24$1,775
Mar 2023182572.852.39$2,047
Feb 2023074175.112.47$1,827
Jan 2023081576.533.39$2,761
Dec 2022083676.415.73$4,790
Nov 2022083285.005.65$4,698
Oct 2022086887.185.86$5,090
Sep 2022287184.888.16$7,280
Aug 2022091594.529.13$8,351
Jul 20226761101.587.54$6,349
Jun 20220696115.097.98$5,552
May 20220708109.378.43$5,971
Apr 20220766104.226.84$5,238
Mar 20220827108.885.08$4,198
Feb 2022071391.054.86$3,464
Jan 2022082781.844.54$3,753
Dec 2021083471.323.90$3,252
Nov 2021085677.435.24$4,483
Oct 2021086279.795.71$4,925
Sep 2021081769.865.35$4,372
Aug 2021081866.024.22$3,452
Jul 2021080170.783.98$3,190
Jun 2021082369.493.38$2,782
May 2021175463.483.02$2,339
Apr 2021079560.362.76$2,193
Mar 2021082461.302.72$2,239
Feb 2021060657.805.55$3,362
Jan 2021081550.412.81$2,290
Dec 2020083144.642.68$2,223
Nov 2020083338.772.71$2,255
Oct 2020091936.972.48$2,278
Sep 2020081237.091.99$1,617
Aug 2020091439.982.39$2,180
Jul 2020090038.371.83$1,643
Jun 2020088034.901.69$1,487
May 2020089916.921.81$1,631
Apr 2020077214.751.80$1,393
Mar 2020076330.341.86$1,416
Feb 2020078449.881.98$1,553
Jan 2020084057.252.09$1,760
Dec 2019085259.012.30$1,963
Nov 2019067155.302.75$1,846
Oct 2019086253.472.42$2,085
Sep 2019076555.052.66$2,033
Aug 2019088253.112.30$2,032
Jul 2019090856.272.46$2,234
Jun 2019089752.782.49$2,235
May 2019090858.482.74$2,488
Apr 2019085762.632.75$2,357
Mar 2019095756.803.06$2,930
Feb 2019087250.852.79$2,435
Jan 201901,03146.033.23$3,328
Dec 2018093146.594.19$3,897
Nov 2018086552.934.24$3,665
Oct 2018088361.443.40$3,001
Sep 2018082559.543.11$2,564
Aug 2018195559.403.07$2,988
Jul 2018192565.142.93$2,777
Jun 2018088760.183.08$2,729
May 2018194365.382.90$2,801
Apr 2018090863.842.90$2,634
Mar 2018292861.222.79$2,709
Feb 2018086361.782.77$2,387
Jan 2018094862.874.01$3,801
Dec 2017092657.272.92$2,705
Nov 2017090455.423.12$2,819
Oct 2017094149.292.98$2,808
Sep 2017091747.523.09$2,831
Aug 2017099245.373.00$2,980
Jul 2017095943.873.09$2,961
Jun 2017091642.493.09$2,828
May 2017098745.373.26$3,221
Apr 2017096347.933.21$3,093
Mar 201701,01846.772.98$3,037
Feb 2017091050.452.95$2,687
Jan 2017096449.413.42$3,296
Dec 201601,05148.763.72$3,913
Nov 2016099342.492.64$2,626
Oct 201601,02446.193.09$3,164
Sep 2016097541.553.10$3,023
Aug 201601,02841.442.92$3,006
Jul 201601,00741.622.92$2,945
Jun 2016096245.352.69$2,584
May 201601,02542.521.99$2,041
Apr 2016099036.561.99$1,971
Mar 201601,03433.011.79$1,855
Feb 2016097326.472.06$2,008
Jan 2016094627.352.36$2,237
Dec 2015094932.362.00$1,899
Nov 2015099538.792.17$2,156
Oct 201511,06043.552.43$2,616
Sep 2015096742.992.76$2,667
Aug 201531,09940.162.87$3,277
Jul 2015088948.152.95$2,618
Jun 2015082156.152.88$2,367
May 2015361055.212.96$1,968
Apr 2015050649.822.71$1,370
Mar 2015065542.892.93$1,922
Feb 2015080644.662.98$2,399
Jan 2015098743.433.10$3,060
Dec 2014390754.693.59$3,421
Nov 2014492270.464.25$4,202
Oct 2014095178.303.90$3,710
Sep 2014089486.164.05$3,617
Aug 201401,06189.394.04$4,281
Jul 201441,07296.564.18$4,867
Jun 201401,00298.164.74$4,746
May 2014099394.734.73$4,693
Apr 2014090895.944.81$4,367
Mar 2014062095.895.06$3,135
Feb 2014688997.406.19$6,089
Jan 2014098190.404.86$4,768
Dec 201341,03191.824.35$4,857
Nov 201341,03088.853.74$4,206
Oct 201301,12897.423.78$4,263
Sep 201341,109104.113.72$4,539
Aug 201351,088104.253.52$4,354
Jul 201301,120102.523.72$4,164
Jun 201331,05894.403.93$4,445
May 2013094494.834.15$3,917
Apr 2013396293.964.28$4,402
Mar 201311,00793.623.91$4,034
Feb 2013399491.233.42$3,673
Jan 201311,07691.603.42$3,771
Dec 201201,00186.773.42$3,424
Nov 201201,08886.953.62$3,944
Oct 201211,17889.383.40$4,094
Sep 201231,14794.672.92$3,631
Aug 201201,24392.662.91$3,615
Jul 201201,22985.133.02$3,713
Jun 201201,19779.822.52$3,015
May 201201,22291.612.49$3,041
Apr 201231,154101.652.00$2,609
Mar 201201,279105.052.22$2,842
Feb 201241,202101.102.57$3,494
Jan 201201,18598.092.73$3,240
Dec 201171,24996.873.24$4,725
Nov 201171,23395.723.31$4,753
Oct 201101,38184.983.65$5,039
Sep 201131,33983.623.99$5,588
Aug 201101,44883.404.15$6,008
Jul 201101,40294.144.52$6,333
Jun 201101,42292.904.64$6,598
May 201131,49698.134.40$6,884
Apr 201131,491105.964.33$6,779
Mar 201141,45996.364.06$6,305
Feb 201131,28485.644.18$5,624
Jan 201141,53686.504.59$7,394
Dec 201041,58785.734.35$7,243
Nov 201031,51080.843.80$5,973
Oct 201061,38278.103.51$5,318
Sep 201071,41772.633.98$6,147
Aug 201001,51573.684.42$6,695
Jul 201001,51172.554.74$7,157
Jun 201001,56970.364.91$7,704
May 201001,68871.124.24$7,149
Apr 201001,60781.694.12$6,625
Mar 201001,68478.394.39$7,391
Feb 201001,56873.585.44$8,534
Jan 201001,75274.365.96$10,449
Dec 200901,61171.445.48$8,834
Nov 200901,67274.593.75$6,273
Oct 200901,86472.544.11$7,662
Sep 200901,92265.543.06$5,890
Aug 200901,85667.423.22$5,974
Jul 200901,84961.133.46$6,406
Jun 200901,76066.163.90$6,855
May 200901,94954.743.93$7,651
Apr 200901,48146.773.59$5,313
Mar 200901,74842.144.06$7,095
Feb 200901,70832.814.63$7,913
Jan 200901,89335.865.37$10,167
Dec 200801,75037.105.98$10,460
Nov 200801,80955.496.86$12,410
Oct 200801,98175.246.92$13,712
Sep 200801,430101.767.88$11,264
Aug 200801,963114.228.48$16,652
Jul 200802,129131.0811.39$24,248
Jun 200802,110131.3313.03$27,499
May 200802,196123.1711.57$25,417
Apr 200802,039110.3110.45$21,317
Mar 200802,188101.909.66$21,145
Feb 200801,98092.538.77$17,366
Jan 200802,11690.388.21$17,363
Dec 200702,24988.337.30$16,422
Nov 200702,14191.677.29$15,612
Oct 200702,42682.856.92$16,793
Sep 20070075.846.24$0
Aug 200702,71769.066.39$17,356
Jul 200702,89970.906.39$18,519
Jun 200702,36062.007.55$17,814
May 200702,32258.747.85$18,219
Apr 200702,19459.617.81$17,125
Mar 200702,24856.927.30$16,415
Feb 200702,09455.108.22$17,204
Jan 200702,23550.306.73$15,035
Dec 200602,33056.656.92$16,120
Nov 200602,62354.207.62$19,981
Oct 200602,54454.906.01$15,299
Sep 200602,61760.085.04$13,182
Aug 200602,65168.717.34$19,458
Jul 200602,58869.376.34$16,415
Jun 200602,24666.286.38$14,338
May 200602,60866.016.42$16,756
Apr 200602,72464.397.36$20,050
Mar 200602,25456.707.08$15,965
Feb 200602,38957.597.75$18,517
Jan 200602,78460.598.93$24,870
Dec 200502,88954.9413.42$38,757
Nov 200503,01354.6910.59$31,903
Oct 200503,19658.3413.80$44,091
Sep 200503,08561.4512.08$37,264
Aug 200504,21461.519.80$41,284
Jul 200504,46355.697.84$35,006
Jun 200506,03452.337.38$44,537
May 200506,59445.226.65$43,858
Apr 200504,24949.207.36$31,275
Mar 200506,61650.377.15$47,337
Feb 200505,49345.226.31$34,671
Jan 200506,15943.166.32$38,938
Dec 200407,65939.866.75$51,707
Nov 200498,29445.286.33$52,912
Oct 200409,94249.706.52$64,773
Sep 200409,77043.245.28$51,624
Aug 2004010,63542.375.55$59,031
Jul 2004013,64238.286.08$83,000
Jun 2004014,71636.106.43$94,668
May 2004019,78637.486.49$128,502

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  455 Mcf  × $  3.05 =     $1,386

────────────────────────────────────────────────────
Month total                                   $1,386

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/207105 is the state's own key, not one this site invented.