CAUTHORN 27

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207157District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.3 M
May 2004 – May 2026
Value, last 12 filed months
$105
at the published price for each month
Months reported
265
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-07-08158054
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition102 bbl$8,204
GasProduction376,244 Mcf$2,242,836
Total$2,251,040

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3125, -100.6148. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31254, -100.61482 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,703 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,703 ft.

Completions filed
May 2004
1 of 1 wells

1 well

42-43536776126,703 ftMay 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (265)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

265 months

May 202603106.413.05$9
Apr 20260398.932.87$9
Mar 20260489.753.15$13
Feb 20260463.503.75$15
Jan 20260459.138.00$32
Dec 20250456.664.41$18
Nov 20250058.593.93$0
Oct 20250359.383.30$10
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250460.553.23$13
Apr 20250462.363.54$14
Mar 20250467.704.27$17
Feb 20250470.884.34$17
Jan 20250474.324.28$17
Dec 20240768.993.12$22
Nov 20240769.052.20$15
Oct 20240671.372.28$14
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240376.091.78$5
Jan 20240073.023.30$0
Dec 20230671.262.61$16
Nov 20230577.892.81$14
Oct 2023053785.443.09$1,658
Sep 2023058289.042.74$1,592
Aug 2023065780.522.67$1,756
Jul 2023063874.852.64$1,685
Jun 2023164968.962.26$1,535
May 2023064570.622.23$1,437
Apr 2023062978.122.24$1,408
Mar 2023167072.852.39$1,676
Feb 2023050575.112.47$1,245
Jan 2023059376.533.39$2,009
Dec 2022062376.415.73$3,569
Nov 2022060385.005.65$3,405
Oct 2022056087.185.86$3,284
Sep 2022352784.888.16$4,557
Aug 2022036494.529.13$3,322
Jul 20227403101.587.54$3,751
Jun 20220433115.097.98$3,454
May 20220407109.378.43$3,432
Apr 20220207104.226.84$1,415
Mar 20220434108.885.08$2,203
Feb 2022044691.054.86$2,167
Jan 2022050481.844.54$2,287
Dec 2021054571.323.90$2,125
Nov 2021062777.435.24$3,284
Oct 2021061379.795.71$3,503
Sep 2021053769.865.35$2,873
Aug 2021149466.024.22$2,151
Jul 2021055770.783.98$2,218
Jun 2021157969.493.38$2,027
May 2021053063.483.02$1,599
Apr 2021059360.362.76$1,636
Mar 2021066661.302.72$1,809
Feb 2021047757.805.55$2,646
Jan 2021066750.412.81$1,874
Dec 2020067344.642.68$1,801
Nov 2020072138.772.71$1,951
Oct 2020059536.972.48$1,475
Sep 2020056837.091.99$1,131
Aug 2020070439.982.39$1,679
Jul 2020060438.371.83$1,102
Jun 2020067734.901.69$1,144
May 2020068516.921.81$1,243
Apr 2020060314.751.80$1,088
Mar 2020057130.341.86$1,060
Feb 2020066949.881.98$1,325
Jan 2020071957.252.09$1,506
Dec 2019059059.012.30$1,360
Nov 2019063455.302.75$1,744
Oct 2019036253.472.42$876
Sep 2019054355.052.66$1,443
Aug 2019068553.112.30$1,578
Jul 2019074056.272.46$1,820
Jun 2019068752.782.49$1,711
May 2019070958.482.74$1,943
Apr 2019064062.632.75$1,760
Mar 2019073756.803.06$2,257
Feb 2019066050.852.79$1,843
Jan 2019076546.033.23$2,470
Dec 2018081246.594.19$3,399
Nov 2018023052.934.24$975
Oct 2018077561.443.40$2,634
Sep 2018075459.543.11$2,343
Aug 2018071759.403.07$2,199
Jul 2018190965.142.93$2,730
Jun 2018072860.183.08$2,240
May 2018187165.382.90$2,592
Apr 2018070963.842.90$2,057
Mar 2018282261.222.79$2,413
Feb 2018076261.782.77$2,108
Jan 2018094262.874.01$3,777
Dec 2017079757.272.92$2,328
Nov 2017077355.423.12$2,410
Oct 2017076549.292.98$2,283
Sep 2017071147.523.09$2,195
Aug 2017089545.373.00$2,689
Jul 2017054843.873.09$1,692
Jun 2017071342.493.09$2,201
May 2017078045.373.26$2,545
Apr 2017081547.933.21$2,617
Mar 2017076546.772.98$2,283
Feb 2017051650.452.95$1,524
Jan 2017067249.413.42$2,297
Dec 2016076148.763.72$2,833
Nov 2016079642.492.64$2,105
Oct 2016078746.193.09$2,432
Sep 2016074641.553.10$2,313
Aug 2016077841.442.92$2,275
Jul 2016076241.622.92$2,228
Jun 2016075145.352.69$2,017
May 2016084442.521.99$1,680
Apr 2016081736.561.99$1,627
Mar 2016086933.011.79$1,559
Feb 2016082226.472.06$1,696
Jan 2016088327.352.36$2,088
Dec 2015087432.362.00$1,749
Nov 2015082538.792.17$1,788
Oct 2015186643.552.43$2,145
Sep 2015082442.992.76$2,273
Aug 2015388640.162.87$2,666
Jul 2015086648.152.95$2,550
Jun 2015083856.152.88$2,416
May 2015481555.212.96$2,630
Apr 2015084449.822.71$2,284
Mar 2015092942.892.93$2,726
Feb 2015086844.662.98$2,583
Jan 2015098543.433.10$3,054
Dec 2014498554.693.59$3,756
Nov 2014494770.464.25$4,308
Oct 2014096678.303.90$3,768
Sep 2014089386.164.05$3,613
Aug 201401,00289.394.04$4,043
Jul 2014399296.564.18$4,436
Jun 2014094198.164.74$4,457
May 2014091394.734.73$4,315
Apr 2014084995.944.81$4,083
Mar 2014069995.895.06$3,535
Feb 2014383397.406.19$5,450
Jan 2014090590.404.86$4,399
Dec 2013388691.824.35$4,134
Nov 2013388888.853.74$3,586
Oct 2013096097.423.78$3,628
Sep 20133940104.113.72$3,807
Aug 20132943104.253.52$3,530
Jul 201301,016102.523.72$3,777
Jun 2013087694.403.93$3,446
May 201301094.834.15$41
Apr 20131393.964.28$107
Mar 20130393.623.91$12
Feb 2013369791.233.42$2,657
Jan 201301,04191.603.42$3,560
Dec 2012094286.773.42$3,222
Nov 201201,02186.953.62$3,701
Oct 201201,07789.383.40$3,661
Sep 2012396794.672.92$3,106
Aug 2012093992.662.91$2,731
Jul 2012093585.133.02$2,824
Jun 2012096679.822.52$2,433
May 2012099991.612.49$2,486
Apr 20123811101.652.00$1,924
Mar 20120940105.052.22$2,089
Feb 201221,068101.102.57$2,947
Jan 201201,01898.092.73$2,783
Dec 201131,05496.873.24$3,705
Nov 2011697595.723.31$3,803
Oct 201101,24884.983.65$4,553
Sep 201121,16983.623.99$4,827
Aug 2011062583.404.15$2,593
Jul 2011060094.144.52$2,710
Jun 2011075292.904.64$3,489
May 2011068398.134.40$3,008
Apr 20111176105.964.33$869
Mar 2011232696.364.06$1,515
Feb 2011262985.644.18$2,800
Jan 2011288586.504.59$4,234
Dec 2010288585.734.35$4,019
Nov 2010280780.843.80$3,225
Oct 2010489878.103.51$3,463
Sep 2010489772.633.98$3,860
Aug 2010093073.684.42$4,110
Jul 2010092272.554.74$4,367
Jun 2010096570.364.91$4,739
May 201001,01071.124.24$4,278
Apr 2010093381.694.12$3,846
Mar 2010095278.394.39$4,178
Feb 2010087973.585.44$4,784
Jan 2010096874.365.96$5,773
Dec 2009090271.445.48$4,946
Nov 2009086774.593.75$3,253
Oct 2009098772.544.11$4,057
Sep 2009097265.543.06$2,979
Aug 200901,00967.423.22$3,247
Jul 200901,07561.133.46$3,724
Jun 200901,05966.163.90$4,125
May 200901,16254.743.93$4,562
Apr 2009094346.773.59$3,383
Mar 200901,11542.144.06$4,526
Feb 200901,10032.814.63$5,096
Jan 200901,24635.865.37$6,692
Dec 2008088237.105.98$5,272
Nov 200801,18555.496.86$8,130
Oct 200801,32475.246.92$9,165
Sep 20080752101.767.88$5,924
Aug 200801,346114.228.48$11,418
Jul 200801,352131.0811.39$15,399
Jun 200801,379131.3313.03$17,972
May 200801,430123.1711.57$16,551
Apr 200801,374110.3110.45$14,365
Mar 200801,450101.909.66$14,013
Feb 200801,39792.538.77$12,253
Jan 20080090.388.21$0
Dec 200701,52988.337.30$11,165
Nov 200701,90191.677.29$13,862
Oct 200701,83182.856.92$12,674
Sep 200702,08475.846.24$13,013
Aug 200701,96469.066.39$12,546
Jul 200702,51170.906.39$16,040
Jun 200702,63762.007.55$19,905
May 200702,65658.747.85$20,840
Apr 200702,59459.617.81$20,247
Mar 200702,59256.927.30$18,927
Feb 200702,34855.108.22$19,291
Jan 200702,78250.306.73$18,714
Dec 200602,93956.656.92$20,333
Nov 200603,33554.207.62$25,404
Oct 200603,29754.906.01$19,828
Sep 200603,26860.085.04$16,462
Aug 200603,56868.717.34$26,189
Jul 200603,32769.376.34$21,102
Jun 200602,83466.286.38$18,092
May 200603,43666.016.42$22,076
Apr 200603,44264.397.36$25,335
Mar 200603,67156.707.08$26,001
Feb 200603,52457.597.75$27,315
Jan 200603,89960.598.93$34,831
Dec 200504,06154.9413.42$54,480
Nov 200504,34954.6910.59$46,049
Oct 200504,78558.3413.80$66,013
Sep 200504,78961.4512.08$57,846
Aug 200505,69761.519.80$55,813
Jul 200506,15755.697.84$48,293
Jun 200506,30652.337.38$46,545
May 200507,22845.226.65$48,075
Apr 200506,30449.207.36$46,400
Mar 200507,62250.377.15$54,535
Feb 200506,09545.226.31$38,471
Jan 200507,41343.166.32$46,866
Dec 200409,16339.866.75$61,860
Nov 200499,30445.286.33$59,306
Oct 200409,94149.706.52$64,767
Sep 200409,77143.245.28$51,629
Aug 2004010,31842.375.55$57,272
Jul 2004012,04138.286.08$73,260
Jun 2004012,32236.106.43$79,268
May 2004015,32437.486.49$99,523

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    3 Mcf  × $  3.05 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well