SIMMONS 71

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 207477District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$803 k
Jan 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-06-10157937
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition211 bbl$11,114
GasProduction124,824 Mcf$791,754
Total$802,868

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6620, -100.7740. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66201, -100.77401 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,914 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,914 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-4353661967,914 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 201901052.782.49$25
May 20190058.482.74$0
Apr 20191062.632.75$63
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20191246.033.23$52
Dec 20180046.594.19$0
Nov 20182152.934.24$110
Oct 20180261.443.40$7
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180163.842.90$3
Mar 20180261.222.79$6
Feb 201802161.782.77$58
Jan 201806162.874.01$245
Dec 201705957.272.92$172
Nov 201706255.423.12$193
Oct 201706449.292.98$191
Sep 201706947.523.09$213
Aug 201707145.373.00$213
Jul 201707343.873.09$225
Jun 201707342.493.09$225
May 201707145.373.26$232
Apr 201706847.933.21$218
Mar 201707346.772.98$218
Feb 201706550.452.95$192
Jan 201707449.413.42$253
Dec 201607248.763.72$268
Nov 201607042.492.64$185
Oct 201604346.193.09$133
Sep 20160641.553.10$19
Aug 20160141.442.92$3
Jul 201603141.622.92$91
Jun 201601545.352.69$40
May 201606742.521.99$133
Apr 2016011936.561.99$237
Mar 2016014533.011.79$260
Feb 2016020626.472.06$425
Jan 2016027927.352.36$660
Dec 20150032.362.00$0
Nov 20150138.792.17$2
Oct 20150243.552.43$5
Sep 20150142.992.76$3
Aug 2015010640.162.87$304
Jul 2015032448.152.95$954
Jun 2015022756.152.88$654
May 20150855.212.96$24
Apr 2015011349.822.71$306
Mar 2015120042.892.93$630
Feb 2015320344.662.98$738
Jan 2015125843.433.10$843
Dec 2014033454.693.59$1,200
Nov 20140670.464.25$26
Oct 201405078.303.90$195
Sep 2014028286.164.05$1,141
Aug 20140089.394.04$0
Jul 201409896.564.18$410
Jun 2014012498.164.74$587
May 20140094.734.73$0
Apr 20140295.944.81$10
Mar 20140195.895.06$5
Feb 2014012097.406.19$743
Jan 2014018390.404.86$890
Dec 2013015991.824.35$692
Nov 20130088.853.74$0
Oct 2013013697.423.78$514
Sep 20130161104.113.72$599
Aug 2013085104.253.52$299
Jul 20130117102.523.72$435
Jun 201307594.403.93$295
May 2013021294.834.15$880
Apr 2013015193.964.28$647
Mar 20130493.623.91$16
Feb 2013017591.233.42$598
Jan 2013012691.603.42$431
Dec 2012027686.773.42$944
Nov 2012027386.953.62$990
Oct 2012029089.383.40$986
Sep 2012010594.672.92$306
Aug 2012024292.662.91$704
Jul 2012019285.133.02$580
Jun 2012018679.822.52$469
May 2012018291.612.49$453
Apr 201204101.652.00$8
Mar 20120271105.052.22$602
Feb 2012041101.102.57$105
Jan 2012017498.092.73$476
Dec 2011030896.873.24$998
Nov 2011131195.723.31$1,126
Oct 2011034384.983.65$1,251
Sep 2011031383.623.99$1,248
Aug 2011029283.404.15$1,212
Jul 2011010894.144.52$488
Jun 2011012892.904.64$594
May 2011015898.134.40$696
Apr 20110249105.964.33$1,079
Mar 2011021996.364.06$889
Feb 2011029385.644.18$1,225
Jan 2011134086.504.59$1,647
Dec 2010135285.734.35$1,616
Nov 2010034380.843.80$1,302
Oct 2010137278.103.51$1,383
Sep 2010135572.633.98$1,485
Aug 2010037473.684.42$1,653
Jul 2010029972.554.74$1,416
Jun 2010010670.364.91$521
May 2010116071.124.24$749
Apr 2010143481.694.12$1,871
Mar 2010265078.394.39$3,009
Feb 2010166373.585.44$3,682
Jan 2010175774.365.96$4,589
Dec 2009143971.445.48$2,479
Nov 2009247174.593.75$1,916
Oct 2009053072.544.11$2,178
Sep 2009043765.543.06$1,339
Aug 2009044367.423.22$1,426
Jul 2009055061.133.46$1,905
Jun 2009055366.163.90$2,154
May 2009160254.743.93$2,418
Apr 2009153446.773.59$1,963
Mar 2009161042.144.06$2,518
Feb 2009144432.814.63$2,090
Jan 2009160735.865.37$3,296
Dec 2008260137.105.98$3,666
Nov 2008159255.496.86$4,117
Oct 2008279775.246.92$5,667
Sep 20080616101.767.88$4,852
Aug 20081720114.228.48$6,222
Jul 20080770131.0811.39$8,770
Jun 20081721131.3313.03$9,528
May 20081693123.1711.57$8,144
Apr 20081737110.3110.45$7,816
Mar 20081589101.909.66$5,794
Feb 2008267392.538.77$6,088
Jan 2008271190.388.21$6,015
Dec 2007279388.337.30$5,967
Nov 2007480591.677.29$6,237
Oct 2007484082.856.92$6,146
Sep 2007279175.846.24$5,091
Aug 2007283469.066.39$5,466
Jul 2007177170.906.39$4,996
Jun 2007152362.007.55$4,010
May 2007379158.747.85$6,383
Apr 2007383859.617.81$6,720
Mar 2007398756.927.30$7,378
Feb 2007265655.108.22$5,500
Jan 2007264250.306.73$4,419
Dec 200651,13456.656.92$8,129
Nov 200631,21954.207.62$9,448
Oct 200621,14654.906.01$7,002
Sep 200631,17160.085.04$6,079
Aug 200601,04668.717.34$7,678
Jul 2006081669.376.34$5,176
Jun 2006174366.286.38$4,810
May 2006093866.016.42$6,027
Apr 200611,00964.397.36$7,491
Mar 200641,04256.707.08$7,607
Feb 2006291057.597.75$7,169
Jan 200621,00460.598.93$9,090
Dec 200531,02954.9413.42$13,969
Nov 2005285354.6910.59$9,141
Oct 200511,10958.3413.80$15,358
Sep 2005092961.4512.08$11,221
Aug 200521,29861.519.80$12,839
Jul 200501,22255.697.84$9,585
Jun 200532,05152.337.38$15,296
May 200542,37345.226.65$15,964
Apr 200502,64549.207.36$19,468
Mar 200581,94650.377.15$14,326
Feb 200501,88745.226.31$11,911
Jan 200562,83243.166.32$18,163
Dec 200452,64339.866.75$18,042
Nov 200462,67545.286.33$17,206
Oct 200402,61149.706.52$17,011
Sep 200463,17243.245.28$17,020
Aug 200482,44742.375.55$13,921
Jul 2004103,74138.286.08$23,144
Jun 2004103,91436.106.43$25,540
May 2004144,79737.486.49$31,679
Apr 2004125,97534.475.86$35,418
Mar 2004118,50834.365.53$47,428
Feb 200468,28032.455.51$45,814
Jan 200403,81532.036.30$24,033

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 52.78 =         $0
Gas                   10 Mcf  × $  2.49 =        $25

────────────────────────────────────────────────────
Month total                                      $25

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/207477 is the state's own key, not one this site invented.