Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209536District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Sep 2004 – May 2026
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
261
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-11-18159393
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition49 bbl$2,866
GasProduction281,033 Mcf$1,550,945
Total$1,553,810

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4298, -100.7787. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42985, -100.77874 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,930 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,930 ft.

Completions filed
Sep 2004
1 of 1 wells

1 well

42-43536921168,930 ftSep 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (261)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

261 months

May 20260385106.413.05$1,173
Apr 2026135298.932.87$1,109
Mar 2026139389.753.15$1,327
Feb 2026147663.503.75$1,849
Jan 2026064159.138.00$5,127
Dec 2025166156.664.41$2,974
Nov 2025019858.593.93$777
Oct 2025157059.383.30$1,943
Sep 2025069262.743.08$2,129
Aug 2025128463.933.01$920
Jul 2025035066.743.32$1,160
Jun 2025048866.483.13$1,527
May 2025047760.553.23$1,542
Apr 2025251062.363.54$1,932
Mar 2025153167.704.27$2,334
Feb 2025148770.884.34$2,185
Jan 2025152874.324.28$2,333
Dec 2024052068.993.12$1,623
Nov 2024053969.052.20$1,185
Oct 2024155771.372.28$1,342
Sep 2024155069.612.36$1,370
Aug 2024057775.632.06$1,191
Jul 2024157579.932.15$1,314
Jun 2024055078.082.63$1,449
May 2024056778.812.20$1,247
Apr 2024255884.451.66$1,095
Mar 2024057080.301.55$881
Feb 2024154276.091.78$1,043
Jan 2024155073.023.30$1,887
Dec 2023146971.262.61$1,296
Nov 2023053677.892.81$1,505
Oct 2023046685.443.09$1,439
Sep 2023057489.042.74$1,570
Aug 2023060380.522.67$1,612
Jul 2023060374.852.64$1,593
Jun 2023058968.962.26$1,330
May 2023043070.622.23$958
Apr 2023035878.122.24$801
Mar 2023057872.852.39$1,383
Feb 2023052675.112.47$1,297
Jan 2023063676.533.39$2,155
Dec 2022051276.415.73$2,933
Nov 2022036185.005.65$2,038
Oct 2022063087.185.86$3,694
Sep 2022059784.888.16$4,874
Aug 2022061794.529.13$5,631
Jul 20220630101.587.54$4,752
Jun 20220500115.097.98$3,989
May 20220626109.378.43$5,279
Apr 20220501104.226.84$3,426
Mar 20220564108.885.08$2,863
Feb 2022053991.054.86$2,619
Jan 2022057081.844.54$2,586
Dec 2021037171.323.90$1,447
Nov 2021056077.435.24$2,933
Oct 2021062179.795.71$3,548
Sep 2021056569.865.35$3,023
Aug 2021062766.024.22$2,646
Jul 2021062070.783.98$2,469
Jun 2021062569.493.38$2,113
May 2021061263.483.02$1,847
Apr 2021060160.362.76$1,658
Mar 2021065461.302.72$1,777
Feb 2021048657.805.55$2,696
Jan 2021043650.412.81$1,225
Dec 2020038544.642.68$1,030
Nov 2020054538.772.71$1,475
Oct 2020062836.972.48$1,556
Sep 2020044337.091.99$882
Aug 2020149339.982.39$1,216
Jul 2020021538.371.83$392
Jun 2020035034.901.69$592
May 2020060016.921.81$1,089
Apr 2020035514.751.80$641
Mar 2020025630.341.86$475
Feb 2020052749.881.98$1,044
Jan 2020155157.252.09$1,211
Dec 2019146659.012.30$1,133
Nov 2019047155.302.75$1,296
Oct 2019029353.472.42$709
Sep 2019140155.052.66$1,121
Aug 2019162053.112.30$1,482
Jul 2019052556.272.46$1,292
Jun 2019152152.782.49$1,351
May 2019163358.482.74$1,793
Apr 2019059562.632.75$1,637
Mar 2019266156.803.06$2,138
Feb 2019042950.852.79$1,198
Jan 2019143546.033.23$1,450
Dec 2018259246.594.19$2,571
Nov 2018052352.934.24$2,216
Oct 2018137161.443.40$1,322
Sep 2018045259.543.11$1,405
Aug 2018064459.403.07$1,975
Jul 2018154465.142.93$1,660
Jun 2018056160.183.08$1,726
May 2018066265.382.90$1,920
Apr 2018166663.842.90$1,996
Mar 2018058861.222.79$1,639
Feb 2018057061.782.77$1,577
Jan 2018066862.874.01$2,678
Dec 2017056057.272.92$1,636
Nov 2017154355.423.12$1,749
Oct 2017070749.292.98$2,109
Sep 2017075447.523.09$2,328
Aug 2017170145.373.00$2,151
Jul 2017076843.873.09$2,371
Jun 2017288742.493.09$2,823
May 2017158945.373.26$1,968
Apr 2017062047.933.21$1,991
Mar 2017164346.772.98$1,965
Feb 2017158750.452.95$1,784
Jan 2017164349.413.42$2,248
Dec 2016163648.763.72$2,416
Nov 2016061942.492.64$1,637
Oct 2016065746.193.09$2,030
Sep 2016064441.553.10$1,997
Aug 2016067841.442.92$1,983
Jul 2016068241.622.92$1,994
Jun 2016066545.352.69$1,786
May 2016068042.521.99$1,354
Apr 2016066836.561.99$1,330
Mar 2016168233.011.79$1,257
Feb 2016063926.472.06$1,319
Jan 2016068027.352.36$1,608
Dec 2015170332.362.00$1,439
Nov 2015060638.792.17$1,313
Oct 2015148143.552.43$1,211
Sep 2015183842.992.76$2,355
Aug 2015198140.162.87$2,858
Jul 2015199248.152.95$2,970
Jun 2015098156.152.88$2,828
May 2015090255.212.96$2,666
Apr 2015097549.822.71$2,639
Mar 2015058542.892.93$1,717
Feb 2015045744.662.98$1,360
Jan 2015074843.433.10$2,319
Dec 2014075754.693.59$2,719
Nov 2014076970.464.25$3,270
Oct 2014082078.303.90$3,199
Sep 2014082086.164.05$3,317
Aug 2014088389.394.04$3,563
Jul 2014090096.564.18$3,762
Jun 2014089298.164.74$4,225
May 2014098994.734.73$4,675
Apr 2014090495.944.81$4,347
Mar 2014087495.895.06$4,420
Feb 2014071997.406.19$4,452
Jan 2014076190.404.86$3,699
Dec 2013078791.824.35$3,427
Nov 2013078688.853.74$2,938
Oct 2013083597.423.78$3,156
Sep 20130831104.113.72$3,089
Aug 20130867104.253.52$3,054
Jul 20130879102.523.72$3,268
Jun 2013084594.403.93$3,324
May 2013087894.834.15$3,643
Apr 2013086993.964.28$3,722
Mar 2013089693.623.91$3,506
Feb 2013076891.233.42$2,626
Jan 2013087891.603.42$3,003
Dec 2012088186.773.42$3,013
Nov 2012087686.953.62$3,175
Oct 2012091889.383.40$3,121
Sep 2012092894.672.92$2,708
Aug 2012097092.662.91$2,821
Jul 2012094585.133.02$2,855
Jun 2012091379.822.52$2,300
May 2012095891.612.49$2,384
Apr 20120952101.652.00$1,901
Mar 20120963105.052.22$2,140
Feb 20120878101.102.57$2,257
Jan 2012097798.092.73$2,671
Dec 2011094996.873.24$3,075
Nov 2011097395.723.31$3,222
Oct 201101,01184.983.65$3,689
Sep 201101,01383.623.99$4,038
Aug 201101,08383.404.15$4,494
Jul 201101,09394.144.52$4,937
Jun 201101,05992.904.64$4,914
May 201101,12098.134.40$4,933
Apr 201101,076105.964.33$4,663
Mar 201101,09696.364.06$4,447
Feb 2011090685.644.18$3,787
Jan 201101,08886.504.59$4,993
Dec 201001,11485.734.35$4,843
Nov 201001,13080.843.80$4,289
Oct 201001,18178.103.51$4,144
Sep 201001,16572.633.98$4,636
Aug 201001,23173.684.42$5,440
Jul 201001,27072.554.74$6,015
Jun 201001,75370.364.91$8,608
May 201001,71771.124.24$7,272
Apr 201001,49681.694.12$6,168
Mar 201001,44878.394.39$6,355
Feb 201001,19773.585.44$6,515
Jan 201001,28374.365.96$7,652
Dec 200901,30971.445.48$7,178
Nov 200901,28274.593.75$4,809
Oct 200901,33472.544.11$5,483
Sep 200901,31565.543.06$4,030
Aug 200901,35967.423.22$4,374
Jul 200901,39961.133.46$4,847
Jun 200901,36866.163.90$5,328
May 200901,43954.743.93$5,649
Apr 200901,37246.773.59$4,922
Mar 200901,44142.144.06$5,849
Feb 200901,32832.814.63$6,153
Jan 200901,49735.865.37$8,040
Dec 200801,46737.105.98$8,768
Nov 200801,18555.496.86$8,130
Oct 200801,58275.246.92$10,951
Sep 200801,690101.767.88$13,312
Aug 200801,906114.228.48$16,169
Jul 200801,951131.0811.39$22,221
Jun 200801,900131.3313.03$24,762
May 200801,948123.1711.57$22,547
Apr 200801,915110.3110.45$20,021
Mar 200801,941101.909.66$18,758
Feb 200801,83392.538.77$16,076
Jan 200801,94090.388.21$15,919
Dec 200701,89688.337.30$13,845
Nov 200701,91391.677.29$13,949
Oct 200702,04582.856.92$14,155
Sep 200701,99875.846.24$12,476
Aug 200702,11969.066.39$13,536
Jul 200702,15770.906.39$13,779
Jun 200702,08362.007.55$15,723
May 200702,15758.747.85$16,924
Apr 200702,10359.617.81$16,414
Mar 200702,13856.927.30$15,612
Feb 200701,95355.108.22$16,046
Jan 200702,25750.306.73$15,183
Dec 200602,07956.656.92$14,383
Nov 200601,88654.207.62$14,367
Oct 200602,01154.906.01$12,094
Sep 200602,00160.085.04$10,079
Aug 200602,15968.717.34$15,847
Jul 200602,17069.376.34$13,764
Jun 200602,17666.286.38$13,891
May 200602,27566.016.42$14,617
Apr 200602,31464.397.36$17,032
Mar 200602,02656.707.08$14,350
Feb 200602,01857.597.75$15,642
Jan 200602,35060.598.93$20,993
Dec 200502,35354.9413.42$31,566
Nov 200502,59254.6910.59$27,445
Oct 200502,58858.3413.80$35,703
Sep 200502,72961.4512.08$32,964
Aug 200502,94761.519.80$28,871
Jul 200503,10055.697.84$24,315
Jun 200503,09152.337.38$22,815
May 200503,30945.226.65$22,009
Apr 200503,42949.207.36$25,239
Mar 200503,68450.377.15$26,359
Feb 200503,31945.226.31$20,949
Jan 200503,40743.166.32$21,540
Dec 200403,69839.866.75$24,965
Nov 200404,68345.286.33$29,645
Oct 200405,83349.706.52$38,003
Sep 200404,57743.245.28$24,184

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  385 Mcf  × $  3.05 =     $1,173

────────────────────────────────────────────────────
Month total                                   $1,173

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/209536 is the state's own key, not one this site invented.