CUSENBARY 60

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210819District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$520 k
Nov 2004 – May 2026
Value, last 12 filed months
$171
at the published price for each month
Months reported
259
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-23175206
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition47 bbl$2,937
GasProduction94,381 Mcf$517,536
Total$520,473

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3282, -100.5861. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.32817, -100.58613 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,465 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,465 ft.

Completions filed
Nov 2004
1 of 1 wells

1 well

42-43537109176,465 ftNov 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (259)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

259 months

May 202602106.413.05$6
Apr 20260498.932.87$11
Mar 20260689.753.15$19
Feb 20260663.503.75$23
Jan 20260559.138.00$40
Dec 202501056.664.41$44
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250966.483.13$28
May 202501060.553.23$32
Apr 202501662.363.54$57
Mar 20250967.704.27$38
Feb 202501370.884.34$56
Jan 202501774.324.28$73
Dec 202401768.993.12$53
Nov 202402169.052.20$46
Oct 202402071.372.28$46
Sep 202401769.612.36$40
Aug 202401875.632.06$37
Jul 202401879.932.15$39
Jun 202401878.082.63$47
May 202402178.812.20$46
Apr 202402084.451.66$33
Mar 202401780.301.55$26
Feb 202401276.091.78$21
Jan 202401673.023.30$53
Dec 202302871.262.61$73
Nov 202302077.892.81$56
Oct 202302085.443.09$62
Sep 202302289.042.74$60
Aug 202302680.522.67$69
Jul 202306974.852.64$182
Jun 2023012968.962.26$291
May 2023013470.622.23$298
Apr 202304978.122.24$110
Mar 202303272.852.39$77
Feb 202303575.112.47$86
Jan 202302576.533.39$85
Dec 202203776.415.73$212
Nov 202203685.005.65$203
Oct 202204087.185.86$235
Sep 202205884.888.16$473
Aug 202208794.529.13$794
Jul 2022092101.587.54$694
Jun 2022092115.097.98$734
May 2022078109.378.43$658
Apr 2022082104.226.84$561
Mar 20220102108.885.08$518
Feb 202207891.054.86$379
Jan 202208581.844.54$386
Dec 2021011971.323.90$464
Nov 2021010377.435.24$539
Oct 2021011379.795.71$646
Sep 2021011269.865.35$599
Aug 202107266.024.22$304
Jul 202105570.783.98$219
Jun 202105069.493.38$169
May 2021011063.483.02$332
Apr 2021011960.362.76$328
Mar 2021015961.302.72$432
Feb 2021011557.805.55$638
Jan 2021012450.412.81$348
Dec 2020015544.642.68$415
Nov 2020015638.772.71$422
Oct 2020018036.972.48$446
Sep 2020017937.091.99$356
Aug 2020015439.982.39$367
Jul 2020021038.371.83$383
Jun 2020015834.901.69$267
May 2020021516.921.81$390
Apr 2020019314.751.80$348
Mar 2020017030.341.86$316
Feb 2020014449.881.98$285
Jan 2020013957.252.09$291
Dec 2019015659.012.30$359
Nov 2019014655.302.75$402
Oct 2019013753.472.42$331
Sep 2019016555.052.66$438
Aug 2019021653.112.30$498
Jul 2019022056.272.46$541
Jun 2019021852.782.49$543
May 2019023158.482.74$633
Apr 2019320162.632.75$741
Mar 2019023456.803.06$717
Feb 2019020950.852.79$584
Jan 2019022746.033.23$733
Dec 2018023646.594.19$988
Nov 2018022452.934.24$949
Oct 2018023461.443.40$795
Sep 2018023259.543.11$721
Aug 2018024459.403.07$748
Jul 2018024365.142.93$712
Jun 2018023560.183.08$723
May 2018022465.382.90$650
Apr 2018021663.842.90$627
Mar 2018025761.222.79$716
Feb 2018023961.782.77$661
Jan 2018025762.874.01$1,030
Dec 2017027057.272.92$789
Nov 2017027155.423.12$845
Oct 2017028249.292.98$841
Sep 2017026347.523.09$812
Aug 2017028145.373.00$844
Jul 2017027243.873.09$840
Jun 2017027442.493.09$846
May 2017028345.373.26$924
Apr 2017027347.933.21$877
Mar 2017029046.772.98$865
Feb 2017026150.452.95$771
Jan 2017028249.413.42$964
Dec 2016026048.763.72$968
Nov 2016028742.492.64$759
Oct 2016029446.193.09$909
Sep 2016028841.553.10$893
Aug 2016030941.442.92$904
Jul 2016030941.622.92$904
Jun 2016030045.352.69$806
May 2016031842.521.99$633
Apr 2016031036.561.99$617
Mar 2016030233.011.79$542
Feb 2016028026.472.06$578
Jan 2016031527.352.36$745
Dec 2015033032.362.00$660
Nov 2015032738.792.17$709
Oct 2015027343.552.43$662
Sep 2015026742.992.76$737
Aug 2015027640.162.87$793
Jul 2015033548.152.95$987
Jun 2015033156.152.88$954
May 2015035655.212.96$1,052
Apr 2015031349.822.71$847
Mar 2015033242.892.93$974
Feb 2015032344.662.98$961
Jan 2015036643.433.10$1,135
Dec 2014036854.693.59$1,322
Nov 2014036170.464.25$1,535
Oct 2014037778.303.90$1,471
Sep 2014036386.164.05$1,468
Aug 2014037289.394.04$1,501
Jul 2014034896.564.18$1,455
Jun 2014036598.164.74$1,729
May 2014038794.734.73$1,829
Apr 2014037895.944.81$1,818
Mar 2014035895.895.06$1,810
Feb 2014037297.406.19$2,303
Jan 2014042490.404.86$2,061
Dec 2013042291.824.35$1,838
Nov 2013041088.853.74$1,533
Oct 2013034497.423.78$1,300
Sep 20130326104.113.72$1,212
Aug 20130295104.253.52$1,039
Jul 20130151102.523.72$561
Jun 2013016794.403.93$657
May 2013020694.834.15$855
Apr 2013030593.964.28$1,306
Mar 2013034293.623.91$1,338
Feb 2013030591.233.42$1,043
Jan 2013036491.603.42$1,245
Dec 2012036386.773.42$1,242
Nov 2012036986.953.62$1,338
Oct 2012039389.383.40$1,336
Sep 2012035094.672.92$1,021
Aug 2012033192.662.91$963
Jul 2012038185.133.02$1,151
Jun 2012040679.822.52$1,023
May 2012048691.612.49$1,209
Apr 20120510101.652.00$1,018
Mar 20120531105.052.22$1,180
Feb 20120378101.102.57$972
Jan 2012051698.092.73$1,411
Dec 2011049896.873.24$1,613
Nov 2011046395.723.31$1,533
Oct 2011040984.983.65$1,492
Sep 2011045983.623.99$1,829
Aug 2011047683.404.15$1,975
Jul 2011048094.144.52$2,168
Jun 2011042392.904.64$1,963
May 2011052498.134.40$2,308
Apr 20110512105.964.33$2,219
Mar 2011055596.364.06$2,252
Feb 2011029485.644.18$1,229
Jan 2011037786.504.59$1,730
Dec 2010041485.734.35$1,800
Nov 2010052080.843.80$1,974
Oct 2010046778.103.51$1,639
Sep 2010057372.633.98$2,280
Aug 2010050473.684.42$2,227
Jul 2010056772.554.74$2,686
Jun 2010061870.364.91$3,035
May 2010059071.124.24$2,499
Apr 2010040881.694.12$1,682
Mar 2010049178.394.39$2,155
Feb 2010049273.585.44$2,678
Jan 2010051674.365.96$3,077
Dec 2009461471.445.48$3,653
Nov 2009062074.593.75$2,326
Oct 2009062172.544.11$2,552
Sep 2009064765.543.06$1,983
Aug 2009036767.423.22$1,181
Jul 2009035361.133.46$1,223
Jun 2009037766.163.90$1,468
May 2009055154.743.93$2,163
Apr 2009055846.773.59$2,002
Mar 2009062842.144.06$2,549
Feb 2009550732.814.63$2,513
Jan 2009067335.865.37$3,615
Dec 2008067537.105.98$4,035
Nov 2008064255.496.86$4,404
Oct 2008063975.246.92$4,423
Sep 20080642101.767.88$5,057
Aug 20080659114.228.48$5,590
Jul 20080636131.0811.39$7,244
Jun 20080654131.3313.03$8,523
May 20080731123.1711.57$8,461
Apr 20085712110.3110.45$7,995
Mar 20080755101.909.66$7,296
Feb 2008073792.538.77$6,464
Jan 2008085190.388.21$6,983
Dec 2007086888.337.30$6,338
Nov 2007092191.677.29$6,716
Oct 200701,04282.856.92$7,213
Sep 200741,19675.846.24$7,771
Aug 200701,21869.066.39$7,781
Jul 2007010470.906.39$664
Jun 2007394762.007.55$7,334
May 2007010858.747.85$847
Apr 2007061559.617.81$4,800
Mar 2007044156.927.30$3,220
Feb 2007059955.108.22$4,921
Jan 2007094750.306.73$6,370
Dec 2006055956.656.92$3,867
Nov 2006248254.207.62$3,780
Oct 2006056054.906.01$3,368
Sep 2006216560.085.04$951
Aug 2006048168.717.34$3,531
Jul 2006057769.376.34$3,660
Jun 2006059866.286.38$3,818
May 2006343466.016.42$2,986
Apr 2006062964.397.36$4,630
Mar 2006265156.707.08$4,724
Feb 2006060557.597.75$4,689
Jan 2006396860.598.93$8,829
Dec 2005076454.9413.42$10,249
Nov 2005080054.6910.59$8,471
Oct 2005388458.3413.80$12,370
Sep 2005058061.4512.08$7,006
Aug 2005084961.519.80$8,318
Jul 2005065955.697.84$5,169
Jun 2005055252.337.38$4,074
May 2005486345.226.65$5,921
Apr 200501,40549.207.36$10,341
Mar 200501,23650.377.15$8,843
Feb 200541,79645.226.31$11,517
Jan 200502,06143.166.32$13,030
Dec 200403,76239.866.75$25,398
Nov 200401,86645.286.33$11,813

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    2 Mcf  × $  3.05 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/210819 is the state's own key, not one this site invented.