MORRISS 64

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213803District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$595 k
Jun 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13165057
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition287 bbl$19,451
GasProduction92,117 Mcf$575,636
Total$595,087

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3828, -100.6150. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.38279, -100.61502 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,206 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,206 ft.

Completions filed
Jun 2005
1 of 1 wells

1 well

42-43537428166,206 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240184.451.66$2
Mar 20240180.301.55$2
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200338.772.71$8
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 20180159.403.07$3
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 20170055.423.12$0
Oct 20170149.292.98$3
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 20170142.493.09$3
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 20170046.772.98$0
Feb 20171250.452.95$56
Jan 20170049.413.42$0
Dec 20160148.763.72$4
Nov 201616242.492.64$685
Oct 201601146.193.09$34
Sep 201609941.553.10$307
Aug 20160041.442.92$0
Jul 20160241.622.92$6
Jun 20160345.352.69$8
May 201604842.521.99$96
Apr 2016029036.561.99$577
Mar 2016034533.011.79$619
Feb 2016035326.472.06$728
Jan 2016036327.352.36$858
Dec 2015037732.362.00$755
Nov 2015034638.792.17$750
Oct 2015138643.552.43$980
Sep 2015038042.992.76$1,048
Aug 2015122340.162.87$681
Jul 2015027548.152.95$810
Jun 2015037256.152.88$1,072
May 2015236555.212.96$1,189
Apr 2015038749.822.71$1,047
Mar 2015040042.892.93$1,174
Feb 2015038644.662.98$1,149
Jan 2015044743.433.10$1,386
Dec 2014244554.693.59$1,708
Nov 2014243870.464.25$2,003
Oct 2014046178.303.90$1,798
Sep 2014045686.164.05$1,845
Aug 2014045889.394.04$1,848
Jul 2014143796.564.18$1,923
Jun 2014043898.164.74$2,075
May 2014045294.734.73$2,136
Apr 2014040495.944.81$1,943
Mar 2014018395.895.06$925
Feb 2014237897.406.19$2,535
Jan 2014041290.404.86$2,003
Dec 2013142191.824.35$1,925
Nov 2013140088.853.74$1,584
Oct 2013041997.423.78$1,584
Sep 20131399104.113.72$1,587
Aug 20131432104.253.52$1,626
Jul 20130405102.523.72$1,506
Jun 2013138094.403.93$1,589
May 2013041494.834.15$1,718
Apr 2013142693.964.28$1,918
Mar 2013041693.623.91$1,628
Feb 2013139691.233.42$1,446
Jan 2013045491.603.42$1,553
Dec 2012044186.773.42$1,508
Nov 2012042786.953.62$1,548
Oct 2012047689.383.40$1,618
Sep 2012147994.672.92$1,493
Aug 2012050092.662.91$1,454
Jul 2012048785.133.02$1,471
Jun 2012051779.822.52$1,302
May 2012053991.612.49$1,341
Apr 20121496101.652.00$1,092
Mar 20120481105.052.22$1,069
Feb 20120463101.102.57$1,190
Jan 2012049398.092.73$1,348
Dec 2011151596.873.24$1,765
Nov 2011146595.723.31$1,635
Oct 2011055484.983.65$2,021
Sep 2011147783.623.99$1,985
Aug 2011048583.404.15$2,012
Jul 2011044594.144.52$2,010
Jun 2011047292.904.64$2,190
May 2011164298.134.40$2,926
Apr 20111356105.964.33$1,649
Mar 2011252496.364.06$2,319
Feb 2011150685.644.18$2,201
Jan 2011247386.504.59$2,343
Dec 2010263085.734.35$2,911
Nov 2010258480.843.80$2,378
Oct 2010360578.103.51$2,357
Sep 2010349472.633.98$2,184
Aug 2010257473.684.42$2,684
Jul 2010359272.554.74$3,022
Jun 2010066670.364.91$3,270
May 2010372371.124.24$3,275
Apr 2010368181.694.12$3,053
Mar 2010373278.394.39$3,448
Feb 2010368673.585.44$3,954
Jan 2010373274.365.96$4,589
Dec 2009268371.445.48$3,888
Nov 2009066874.593.75$2,506
Oct 2009566672.544.11$3,100
Sep 2009281165.543.06$2,617
Aug 2009044967.423.22$1,445
Jul 2009260461.133.46$2,215
Jun 2009258266.163.90$2,399
May 2009476554.743.93$3,222
Apr 2009241846.773.59$1,593
Mar 2009262142.144.06$2,605
Feb 2009461332.814.63$2,971
Jan 2009474735.865.37$4,156
Dec 2008176437.105.98$4,604
Nov 2008933855.496.86$2,818
Oct 200863,67075.246.92$25,855
Sep 20082644101.767.88$5,276
Aug 20082763114.228.48$6,701
Jul 20082815131.0811.39$9,545
Jun 20082785131.3313.03$10,493
May 20084663123.1711.57$8,166
Apr 20084771110.3110.45$8,502
Mar 20082821101.909.66$8,138
Feb 2008579792.538.77$7,453
Jan 2008086290.388.21$7,073
Dec 2007590288.337.30$7,028
Nov 2007385791.677.29$6,524
Oct 2007695882.856.92$7,128
Sep 200731,02375.846.24$6,615
Aug 200731,08269.066.39$7,119
Jul 200731,10970.906.39$7,297
Jun 2007097562.007.55$7,360
May 2007596558.747.85$7,865
Apr 200751,04159.617.81$8,423
Mar 200761,10856.927.30$8,432
Feb 2007394355.108.22$7,913
Jan 200731,02350.306.73$7,032
Dec 200661,04756.656.92$7,584
Nov 200621,16254.207.62$8,960
Oct 200651,25954.906.01$7,846
Sep 200641,04160.085.04$5,484
Aug 2006159168.717.34$4,407
Jul 2006061369.376.34$3,888
Jun 2006259466.286.38$3,925
May 2006483166.016.42$5,603
Apr 2006287664.397.36$6,577
Mar 200671,09456.707.08$8,146
Feb 2006799557.597.75$8,115
Jan 2006697660.598.93$9,082
Dec 200501,04254.9413.42$13,979
Nov 200581,41954.6910.59$15,462
Oct 2005151,86358.3413.80$26,577
Sep 200572,25861.4512.08$27,705
Aug 200592,83661.519.80$28,337
Jul 2005114,27455.697.84$34,136
Jun 2005181752.337.38$6,083

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 84.45 =         $0
Gas                    1 Mcf  × $  1.66 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213803 is the state's own key, not one this site invented.