MORRISS 64

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 220523District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$862 k
Apr 2006 – May 2026
Value, last 12 filed months
$60
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-11-20169410
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition400 bbl$28,475
GasProduction148,660 Mcf$833,755
Total$862,230

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3785, -100.6155. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.37848, -100.61554 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,101 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,101 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-43536853136,101 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 2026015106.413.05$46
Apr 20260598.932.87$14
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250162.363.54$4
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250374.324.28$13
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240173.023.30$3
Dec 20230271.262.61$5
Nov 20230277.892.81$6
Oct 20230185.443.09$3
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230174.852.64$3
Jun 20230168.962.26$2
May 2023010370.622.23$229
Apr 202302378.122.24$51
Mar 20230172.852.39$2
Feb 20230475.112.47$10
Jan 20230176.533.39$3
Dec 20220476.415.73$23
Nov 20220185.005.65$6
Oct 20220487.185.86$23
Sep 202201384.888.16$106
Aug 202203394.529.13$301
Jul 2022043101.587.54$324
Jun 2022043115.097.98$343
May 2022026109.378.43$219
Apr 2022033104.226.84$226
Mar 2022046108.885.08$234
Feb 202202391.054.86$112
Jan 202202681.844.54$118
Dec 202104971.323.90$191
Nov 202103977.435.24$204
Oct 202103379.795.71$189
Sep 202103669.865.35$193
Aug 202103866.024.22$160
Jul 202105670.783.98$223
Jun 202101669.493.38$54
May 202103363.483.02$100
Apr 202103660.362.76$99
Mar 202106661.302.72$179
Feb 202106257.805.55$344
Jan 202103050.412.81$84
Dec 202004644.642.68$123
Nov 202005938.772.71$160
Oct 202008236.972.48$203
Sep 202009837.091.99$195
Aug 202009839.982.39$234
Jul 2020010238.371.83$186
Jun 202004634.901.69$78
May 202009816.921.81$178
Apr 202009514.751.80$171
Mar 202005630.341.86$104
Feb 202004649.881.98$91
Jan 202003357.252.09$69
Dec 201903359.012.30$76
Nov 201903355.302.75$91
Oct 201904653.472.42$111
Sep 201906255.052.66$165
Aug 2019010253.112.30$235
Jul 2019010056.272.46$246
Jun 201909652.782.49$239
May 2019011858.482.74$323
Apr 201906362.632.75$173
Mar 2019011456.803.06$349
Feb 2019012150.852.79$338
Jan 2019011646.033.23$374
Dec 2018010646.594.19$444
Nov 2018012252.934.24$517
Oct 2018016461.443.40$557
Sep 2018016159.543.11$500
Aug 2018015559.403.07$475
Jul 2018014665.142.93$428
Jun 2018013260.183.08$406
May 2018012865.382.90$371
Apr 2018012863.842.90$371
Mar 2018010461.222.79$290
Feb 2018011161.782.77$307
Jan 2018111462.874.01$520
Dec 2017066457.272.92$1,940
Nov 2017084355.423.12$2,629
Oct 2017069949.292.98$2,086
Sep 2017259347.523.09$1,926
Aug 2017056945.373.00$1,710
Jul 2017556043.873.09$1,948
Jun 2017026842.493.09$827
May 2017019945.373.26$649
Apr 2017019147.933.21$613
Mar 2017139146.772.98$1,213
Feb 2017360650.452.95$1,941
Jan 2017059349.413.42$2,027
Dec 201607648.763.72$283
Nov 201609842.492.64$259
Oct 2016012746.193.09$392
Sep 2016016741.553.10$518
Aug 2016084041.442.92$2,456
Jul 201601,09141.622.92$3,190
Jun 2016044045.352.69$1,182
May 2016016842.521.99$334
Apr 2016016536.561.99$329
Mar 2016016433.011.79$294
Feb 2016015626.472.06$322
Jan 2016017527.352.36$414
Dec 2015022332.362.00$446
Nov 2015032938.792.17$713
Oct 2015183843.552.43$2,077
Sep 2015093842.992.76$2,587
Aug 2015264040.162.87$1,919
Jul 2015066448.152.95$1,956
Jun 2015089856.152.88$2,589
May 2015276855.212.96$2,380
Apr 2015092849.822.71$2,512
Mar 2015093742.892.93$2,750
Feb 201501,01144.662.98$3,009
Jan 2015018943.433.10$586
Dec 201409654.693.59$345
Nov 2014012970.464.25$548
Oct 2014013178.303.90$511
Sep 2014013086.164.05$526
Aug 2014012689.394.04$508
Jul 2014111896.564.18$590
Jun 2014012198.164.74$573
May 2014015094.734.73$709
Apr 2014015295.944.81$731
Mar 2014013795.895.06$693
Feb 2014120397.406.19$1,354
Jan 2014026490.404.86$1,283
Dec 2013342091.824.35$2,104
Nov 2013387988.853.74$3,553
Oct 2013093897.423.78$3,545
Sep 20133987104.113.72$3,982
Aug 201321,065104.253.52$3,960
Jul 20130988102.523.72$3,673
Jun 2013246594.403.93$2,018
May 20130094.834.15$0
Apr 2013148593.964.28$2,171
Mar 2013047693.623.91$1,863
Feb 201321491.233.42$230
Jan 201303891.603.42$130
Dec 2012027986.773.42$954
Nov 2012072886.953.62$2,639
Oct 2012043089.383.40$1,462
Sep 201231,05894.672.92$3,372
Aug 2012094592.662.91$2,748
Jul 2012044785.133.02$1,350
Jun 2012054679.822.52$1,375
May 2012085491.612.49$2,125
Apr 201231,241101.652.00$2,783
Mar 201201,346105.052.22$2,991
Feb 201201,024101.102.57$2,632
Jan 2012095998.092.73$2,622
Dec 201131,08496.873.24$3,802
Nov 201131,03895.723.31$3,724
Oct 201101,16684.983.65$4,254
Sep 2011389783.623.99$3,826
Aug 201101,21783.404.15$5,050
Jul 2011082394.144.52$3,718
Jun 201101,05392.904.64$4,886
May 201101,02698.134.40$4,519
Apr 201128105.964.33$247
Mar 2011262096.364.06$2,708
Feb 2011050485.644.18$2,107
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 201024280.843.80$321
Oct 2010588378.103.51$3,489
Sep 2010587072.633.98$3,825
Aug 2010278573.684.42$3,617
Jul 2010352372.554.74$2,695
Jun 2010040670.364.91$1,994
May 201031,40171.124.24$6,147
Apr 2010059281.694.12$2,441
Mar 201003078.394.39$132
Feb 201013973.585.44$286
Jan 2010143074.365.96$2,639
Dec 2009114271.445.48$850
Nov 2009017274.593.75$645
Oct 2009665972.544.11$3,144
Sep 200941,09965.543.06$3,630
Aug 200901,16967.423.22$3,762
Jul 200941,18061.133.46$4,333
Jun 200941,24766.163.90$5,122
May 200981,36454.743.93$5,793
Apr 200941,23746.773.59$4,625
Mar 200941,47742.144.06$6,164
Feb 200991,45732.814.63$7,046
Jan 200991,63535.865.37$9,104
Dec 200851,55937.105.98$9,504
Nov 200881,64355.496.86$11,715
Oct 200841,48775.246.92$10,594
Sep 200851,058101.767.88$8,843
Aug 200841,879114.228.48$16,396
Jul 200851,850131.0811.39$21,726
Jun 200851,932131.3313.03$25,836
May 2008111,930123.1711.57$23,693
Apr 2008102,062110.3110.45$22,661
Mar 200851,581101.909.66$15,788
Feb 2008101,66092.538.77$15,484
Jan 200802,20690.388.21$18,102
Dec 200761,21888.337.30$9,424
Nov 2007112891.677.29$1,025
Oct 2007454582.856.92$4,104
Sep 2007774875.846.24$5,202
Aug 200772,45669.066.39$16,172
Jul 200773,19970.906.39$20,931
Jun 200702,59362.007.55$19,573
May 2007102,15058.747.85$17,457
Apr 200792,07859.617.81$16,756
Mar 2007111,69456.927.30$12,996
Feb 200781,95255.108.22$16,478
Jan 200772,10050.306.73$14,478
Dec 2006101,58456.656.92$11,525
Nov 200651,98854.207.62$15,415
Oct 2006102,49254.906.01$15,535
Sep 2006203,75860.085.04$20,131
Aug 2006124,09368.717.34$30,867
Jul 200604,85369.376.34$30,781
Jun 2006135,12866.286.38$33,598
May 2006376,55366.016.42$44,545
Apr 2006157,26464.397.36$54,432

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   15 Mcf  × $  3.05 =        $46

────────────────────────────────────────────────────
Month total                                      $46

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/220523 is the state's own key, not one this site invented.