DUKE WILSON 173

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213944District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Aug 2005 – May 2026
Value, last 12 filed months
$75
at the published price for each month
Months reported
250
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-13165553
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition38 bbl$1,902
GasProduction269,975 Mcf$1,686,551
Total$1,688,452

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4320, -100.7569. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.43199, -100.75692 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,950 ft.

Completions filed
Aug 2005
1 of 1 wells

1 well

42-43537432148,950 ftAug 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (250)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

250 months

May 2026021106.413.05$64
Apr 20260498.932.87$11
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240078.812.20$0
Apr 20240184.451.66$2
Mar 20240080.301.55$0
Feb 20240176.091.78$2
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230278.122.24$4
Mar 202301272.852.39$29
Feb 20230875.112.47$20
Jan 20230876.533.39$27
Dec 202202076.415.73$115
Nov 202203485.005.65$192
Oct 202205687.185.86$328
Sep 202205984.888.16$482
Aug 202205894.529.13$529
Jul 2022055101.587.54$415
Jun 2022053115.097.98$423
May 2022047109.378.43$396
Apr 2022043104.226.84$294
Mar 2022048108.885.08$244
Feb 202204191.054.86$199
Jan 202202481.844.54$109
Dec 202102071.323.90$78
Nov 202105177.435.24$267
Oct 202104979.795.71$280
Sep 202106369.865.35$337
Aug 202105466.024.22$228
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210161.302.72$3
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20201039.982.39$40
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200414.751.80$7
Mar 2020012330.341.86$228
Feb 2020039449.881.98$780
Jan 2020046857.252.09$980
Dec 2019051459.012.30$1,184
Nov 2019134155.302.75$993
Oct 2019023053.472.42$556
Sep 2019249355.052.66$1,420
Aug 2019260053.112.30$1,489
Jul 2019040556.272.46$996
Jun 2019244852.782.49$1,222
May 2019125558.482.74$757
Apr 2019055762.632.75$1,532
Mar 2019240356.803.06$1,348
Feb 2019056950.852.79$1,589
Jan 2019142746.033.23$1,424
Dec 2018229646.594.19$1,332
Nov 20181034352.934.24$1,983
Oct 2018040461.443.40$1,373
Sep 2018238959.543.11$1,328
Aug 2018046759.403.07$1,432
Jul 2018064265.142.93$1,882
Jun 2018066260.183.08$2,037
May 2018063165.382.90$1,830
Apr 2018056563.842.90$1,639
Mar 2018063261.222.79$1,761
Feb 2018058061.782.77$1,604
Jan 2018093462.874.01$3,745
Dec 2017066457.272.92$1,940
Nov 2017064055.423.12$1,996
Oct 2017074249.292.98$2,214
Sep 2017073747.523.09$2,275
Aug 2017162045.373.00$1,908
Jul 2017060543.873.09$1,868
Jun 2017271142.493.09$2,280
May 2017174745.373.26$2,483
Apr 2017078047.933.21$2,505
Mar 2017177446.772.98$2,356
Feb 2017172050.452.95$2,176
Jan 2017152649.413.42$1,848
Dec 2016158848.763.72$2,238
Nov 2016078942.492.64$2,086
Oct 2016095546.193.09$2,951
Sep 2016091541.553.10$2,837
Aug 2016047441.442.92$1,386
Jul 2016057241.622.92$1,673
Jun 2016054745.352.69$1,469
May 2016053742.521.99$1,069
Apr 2016053136.561.99$1,057
Mar 2016157533.011.79$1,065
Feb 2016063526.472.06$1,310
Jan 2016083827.352.36$1,981
Dec 2015188832.362.00$1,810
Nov 2015072338.792.17$1,567
Oct 2015078243.552.43$1,898
Sep 2015083842.992.76$2,312
Aug 2015159640.162.87$1,752
Jul 2015181148.152.95$2,437
Jun 2015078056.152.88$2,249
May 2015071455.212.96$2,110
Apr 2015071249.822.71$1,927
Mar 2015082142.892.93$2,409
Feb 2015071444.662.98$2,125
Jan 2015081343.433.10$2,521
Dec 2014084054.693.59$3,017
Nov 2014077070.464.25$3,274
Oct 2014086478.303.90$3,370
Sep 2014085986.164.05$3,475
Aug 2014086289.394.04$3,478
Jul 2014087296.564.18$3,645
Jun 2014089798.164.74$4,249
May 2014093894.734.73$4,434
Apr 2014088895.944.81$4,271
Mar 2014093095.895.06$4,703
Feb 2014085097.406.19$5,263
Jan 2014093490.404.86$4,540
Dec 2013092391.824.35$4,019
Nov 2013090988.853.74$3,398
Oct 201301,01597.423.78$3,836
Sep 20130944104.113.72$3,510
Aug 201301,011104.253.52$3,561
Jul 201301,044102.523.72$3,881
Jun 201301,00594.403.93$3,953
May 201301,03394.834.15$4,286
Apr 201301,03893.964.28$4,445
Mar 201301,07693.623.91$4,210
Feb 2013098791.233.42$3,375
Jan 201301,11091.603.42$3,796
Dec 201201,13586.773.42$3,882
Nov 201201,12586.953.62$4,078
Oct 201201,18189.383.40$4,015
Sep 201201,14894.672.92$3,350
Aug 201201,21992.662.91$3,545
Jul 201201,22785.133.02$3,707
Jun 201201,20979.822.52$3,046
May 201201,15491.612.49$2,872
Apr 201201,135101.652.00$2,266
Mar 201201,197105.052.22$2,660
Feb 201201,325101.102.57$3,406
Jan 201201,07298.092.73$2,931
Dec 2011096596.873.24$3,126
Nov 201101,21995.723.31$4,036
Oct 201101,28384.983.65$4,681
Sep 201101,27383.623.99$5,074
Aug 201101,35183.404.15$5,606
Jul 201101,38494.144.52$6,252
Jun 201101,41692.904.64$6,570
May 201101,49698.134.40$6,590
Apr 20110824105.964.33$3,571
Mar 2011092996.364.06$3,769
Feb 2011086885.644.18$3,628
Jan 201101,28786.504.59$5,906
Dec 201001,39985.734.35$6,083
Nov 201001,40080.843.80$5,313
Oct 201001,44178.103.51$5,056
Sep 201001,42672.633.98$5,675
Aug 201001,49773.684.42$6,616
Jul 201001,56872.554.74$7,427
Jun 201001,47570.364.91$7,243
May 201001,50271.124.24$6,361
Apr 201001,56581.694.12$6,452
Mar 201001,62378.394.39$7,123
Feb 201001,45673.585.44$7,924
Jan 201001,62774.365.96$9,704
Dec 200901,67271.445.48$9,169
Nov 200901,66774.593.75$6,254
Oct 200901,72872.544.11$7,103
Sep 200901,70665.543.06$5,228
Aug 200901,85567.423.22$5,970
Jul 200901,59461.133.46$5,522
Jun 200901,67966.163.90$6,540
May 200901,83754.743.93$7,212
Apr 200901,79746.773.59$6,447
Mar 200901,89542.144.06$7,692
Feb 200901,77132.814.63$8,205
Jan 200901,99335.865.37$10,704
Dec 200802,04437.105.98$12,217
Nov 200802,02855.496.86$13,913
Oct 200802,01575.246.92$13,948
Sep 200801,825101.767.88$14,376
Aug 200802,056114.228.48$17,441
Jul 200801,912131.0811.39$21,777
Jun 200801,879131.3313.03$24,488
May 200802,006123.1711.57$23,218
Apr 200802,005110.3110.45$20,962
Mar 200802,149101.909.66$20,768
Feb 200802,09392.538.77$18,357
Jan 200802,23490.388.21$18,332
Dec 200702,31488.337.30$16,897
Nov 200702,30791.677.29$16,822
Oct 200702,43482.856.92$16,848
Sep 200702,47575.846.24$15,454
Aug 200702,78669.066.39$17,797
Jul 200702,41670.906.39$15,433
Jun 200702,57262.007.55$19,415
May 200703,05458.747.85$23,963
Apr 200703,08759.617.81$24,095
Mar 200703,32156.927.30$24,250
Feb 200703,17355.108.22$26,069
Jan 200703,44650.306.73$23,181
Dec 200603,01956.656.92$20,887
Nov 200602,67854.207.62$20,400
Oct 200603,57754.906.01$21,511
Sep 200603,55560.085.04$17,907
Aug 200603,80368.717.34$27,914
Jul 200603,98769.376.34$25,289
Jun 200604,13266.286.38$26,378
May 200604,43866.016.42$28,514
Apr 200604,31964.397.36$31,790
Mar 200604,98056.707.08$35,273
Feb 200604,79357.597.75$37,151
Jan 200605,81260.598.93$51,920
Dec 200506,35154.9413.42$85,201
Nov 200506,56654.6910.59$69,523
Oct 200507,24058.3413.80$99,881
Sep 200507,76561.4512.08$93,793
Aug 200506,11061.519.80$59,859

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   21 Mcf  × $  3.05 =        $64

────────────────────────────────────────────────────
Month total                                      $64

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/213944 is the state's own key, not one this site invented.