AUSTIN MILLSPAUGH 12

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 214286District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$571 k
Sep 2005 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-08-14169657
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12 bbl$756
GasProduction95,700 Mcf$570,386
Total$571,142

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5251, -101.4744. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52508, -101.47442 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-10539725217,000 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 20260106106.413.05$323
Apr 2026013598.932.87$387
Mar 20260089.753.15$0
Feb 202619263.503.75$409
Jan 202618159.138.00$707
Dec 2025110156.664.41$502
Nov 2025110058.593.93$451
Oct 202519359.383.30$367
Sep 202509762.743.08$298
Aug 2025110263.933.01$371
Jul 2025110066.743.32$398
Jun 202519866.483.13$373
May 202519860.553.23$377
Apr 2025110362.363.54$427
Mar 2025110167.704.27$499
Feb 2025110070.884.34$505
Jan 20250074.324.28$0
Dec 2024010368.993.12$322
Nov 2024010669.052.20$233
Oct 2024014171.372.28$322
Sep 202407469.612.36$175
Aug 2024013375.632.06$274
Jul 2024013379.932.15$286
Jun 2024012078.082.63$316
May 2024011978.812.20$262
Apr 2024012384.451.66$204
Mar 2024012380.301.55$190
Feb 2024012276.091.78$218
Jan 2024014673.023.30$481
Dec 2023014971.262.61$389
Nov 202309477.892.81$264
Oct 2023011785.443.09$361
Sep 2023013489.042.74$367
Aug 2023014180.522.67$377
Jul 2023014774.852.64$388
Jun 2023014868.962.26$334
May 2023010870.622.23$241
Apr 2023016078.122.24$358
Mar 2023018072.852.39$431
Feb 2023016875.112.47$414
Jan 2023014976.533.39$505
Dec 2022015876.415.73$905
Nov 2022016485.005.65$926
Oct 2022017687.185.86$1,032
Sep 2022016984.888.16$1,380
Aug 2022017894.529.13$1,625
Jul 20220201101.587.54$1,516
Jun 20220190115.097.98$1,516
May 20220104109.378.43$877
Apr 20220112104.226.84$766
Mar 20220122108.885.08$619
Feb 2022011891.054.86$573
Jan 2022012381.844.54$558
Dec 2021012371.323.90$480
Nov 2021012877.435.24$670
Oct 2021012779.795.71$726
Sep 2021012869.865.35$685
Aug 2021013366.024.22$561
Jul 2021013870.783.98$550
Jun 2021014569.493.38$490
May 2021014063.483.02$422
Apr 2021014660.362.76$403
Mar 2021016461.302.72$446
Feb 2021015657.805.55$865
Jan 2021012050.412.81$337
Dec 2020016044.642.68$428
Nov 2020017438.772.71$471
Oct 2020017736.972.48$439
Sep 2020015237.091.99$303
Aug 2020017139.982.39$408
Jul 2020016738.371.83$305
Jun 2020018934.901.69$319
May 2020017116.921.81$310
Apr 2020018914.751.80$341
Mar 2020019230.341.86$356
Feb 2020018649.881.98$368
Jan 2020020157.252.09$421
Dec 2019020659.012.30$475
Nov 2019019055.302.75$523
Oct 2019020453.472.42$493
Sep 2019018955.052.66$502
Aug 2019019853.112.30$456
Jul 2019019556.272.46$480
Jun 2019019052.782.49$473
May 2019017358.482.74$474
Apr 2019018762.632.75$514
Mar 2019020656.803.06$631
Feb 2019019350.852.79$539
Jan 2019021746.033.23$701
Dec 2018021146.594.19$883
Nov 2018020452.934.24$864
Oct 2018022061.443.40$748
Sep 2018023459.543.11$727
Aug 2018019159.403.07$586
Jul 2018022265.142.93$651
Jun 2018020660.183.08$634
May 2018022365.382.90$647
Apr 2018021763.842.90$629
Mar 2018023661.222.79$658
Feb 2018027761.782.77$766
Jan 201807562.874.01$301
Dec 2017023957.272.92$698
Nov 2017022255.423.12$692
Oct 2017017849.292.98$531
Sep 2017017747.523.09$546
Aug 2017018345.373.00$550
Jul 2017018043.873.09$556
Jun 2017018142.493.09$559
May 2017019745.373.26$643
Apr 2017015847.933.21$507
Mar 2017019546.772.98$582
Feb 2017017950.452.95$529
Jan 2017019349.413.42$660
Dec 2016020748.763.72$771
Nov 2016021242.492.64$561
Oct 2016029846.193.09$921
Sep 2016025841.553.10$800
Aug 2016029641.442.92$866
Jul 2016026341.622.92$769
Jun 2016025645.352.69$688
May 2016026142.521.99$520
Apr 2016027436.561.99$546
Mar 2016018133.011.79$325
Feb 2016023226.472.06$479
Jan 2016026227.352.36$619
Dec 2015026532.362.00$530
Nov 2015025938.792.17$561
Oct 2015026943.552.43$653
Sep 2015016542.992.76$455
Aug 2015014540.162.87$417
Jul 2015015648.152.95$459
Jun 2015015256.152.88$438
May 2015015655.212.96$461
Apr 2015015149.822.71$409
Mar 2015014742.892.93$431
Feb 2015011044.662.98$327
Jan 2015017943.433.10$555
Dec 2014015354.693.59$549
Nov 2014018370.464.25$778
Oct 2014017578.303.90$683
Sep 2014017986.164.05$724
Aug 2014018389.394.04$738
Jul 2014034096.564.18$1,421
Jun 2014032298.164.74$1,525
May 2014036594.734.73$1,725
Apr 2014030395.944.81$1,457
Mar 2014033495.895.06$1,689
Feb 2014015797.406.19$972
Jan 2014015890.404.86$768
Dec 2013011691.824.35$505
Nov 2013031088.853.74$1,159
Oct 2013027097.423.78$1,020
Sep 20130354104.113.72$1,316
Aug 20130360104.253.52$1,268
Jul 20130385102.523.72$1,431
Jun 2013041494.403.93$1,628
May 2013033594.834.15$1,390
Apr 2013041193.964.28$1,760
Mar 2013031293.623.91$1,221
Feb 2013027691.233.42$944
Jan 2013032591.603.42$1,111
Dec 2012035786.773.42$1,221
Nov 2012041186.953.62$1,490
Oct 2012040089.383.40$1,360
Sep 2012041494.672.92$1,208
Aug 2012042892.662.91$1,245
Jul 2012044585.133.02$1,344
Jun 2012037079.822.52$932
May 2012038791.612.49$963
Apr 20120429101.652.00$857
Mar 20120432105.052.22$960
Feb 20120418101.102.57$1,074
Jan 2012044598.092.73$1,217
Dec 2011043096.873.24$1,393
Nov 2011043395.723.31$1,434
Oct 2011040884.983.65$1,489
Sep 2011045183.623.99$1,798
Aug 2011045483.404.15$1,884
Jul 2011040294.144.52$1,816
Jun 2011041492.904.64$1,921
May 2011043698.134.40$1,921
Apr 20110301105.964.33$1,304
Mar 2011035996.364.06$1,457
Feb 2011038185.644.18$1,593
Jan 2011043986.504.59$2,014
Dec 2010049185.734.35$2,135
Nov 2010046680.843.80$1,769
Oct 2010051778.103.51$1,814
Sep 2010050572.633.98$2,010
Aug 2010037773.684.42$1,666
Jul 2010053272.554.74$2,520
Jun 2010047270.364.91$2,318
May 2010049171.124.24$2,079
Apr 2010039281.694.12$1,616
Mar 2010052678.394.39$2,308
Feb 2010049273.585.44$2,678
Jan 2010053074.365.96$3,161
Dec 2009052171.445.48$2,857
Nov 2009053874.593.75$2,018
Oct 2009057372.544.11$2,355
Sep 2009050065.543.06$1,532
Aug 2009053267.423.22$1,712
Jul 2009049861.133.46$1,725
Jun 2009050866.163.90$1,979
May 2009053054.743.93$2,081
Apr 2009052946.773.59$1,898
Mar 2009056942.144.06$2,310
Feb 2009055432.814.63$2,567
Jan 2009070035.865.37$3,760
Dec 2008064537.105.98$3,855
Nov 2008056655.496.86$3,883
Oct 2008065675.246.92$4,541
Sep 20080547101.767.88$4,309
Aug 20080766114.228.48$6,498
Jul 20080765131.0811.39$8,713
Jun 20080693131.3313.03$9,032
May 20080743123.1711.57$8,600
Apr 20080746110.3110.45$7,799
Mar 20080785101.909.66$7,586
Feb 2008073192.538.77$6,411
Jan 200801,52890.388.21$12,538
Dec 2007081888.337.30$5,973
Nov 2007080291.677.29$5,848
Oct 2007083782.856.92$5,794
Sep 2007084075.846.24$5,245
Aug 2007090669.066.39$5,787
Jul 2007088870.906.39$5,672
Jun 2007086662.007.55$6,537
May 2007094458.747.85$7,407
Apr 2007094359.617.81$7,360
Mar 200701,04556.927.30$7,631
Feb 2007098555.108.22$8,093
Jan 200701,06150.306.73$7,137
Dec 200601,10956.656.92$7,673
Nov 200601,01054.207.62$7,694
Oct 200601,08554.906.01$6,525
Sep 200601,12060.085.04$5,642
Aug 200601,23268.717.34$9,043
Jul 200601,34469.376.34$8,525
Jun 200601,12066.286.38$7,150
May 200601,36366.016.42$8,757
Apr 2006096264.397.36$7,081
Mar 200601,35156.707.08$9,569
Feb 200601,42157.597.75$11,014
Jan 200601,51260.598.93$13,507
Dec 200502,07754.9413.42$27,864
Nov 200502,04354.6910.59$21,632
Oct 200502,89158.3413.80$39,884
Sep 200502,51061.4512.08$30,318

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  106 Mcf  × $  3.05 =       $323

────────────────────────────────────────────────────
Month total                                     $323

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/214286 is the state's own key, not one this site invented.