AUSTIN MILLSPAUGH 12

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the OZONA (CANYON SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215747District 7CField 679952002 tax incentive programmesCondensateGasSaveExport
Value, all time
$949 k
Dec 2005 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,312 leases and 2,323 wells, and the rule below applies to all of them.

Discovered
1962-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-09-12.

The Commission's schedule remark for this field reads: ZONE TO BE SET UP IN OZONA (CANYON SAND, OIL).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-08-14169658
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14 bbl$872
GasProduction162,362 Mcf$947,955
Total$948,827

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.5215, -101.4739. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.52153, -101.47390 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-10539761207,000 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 20260102106.413.05$311
Apr 2026012798.932.87$364
Mar 20260089.753.15$0
Feb 2026111963.503.75$510
Jan 2026213759.138.00$1,214
Dec 2025216656.664.41$846
Nov 2025114058.593.93$608
Oct 2025113859.383.30$515
Sep 2025014362.743.08$440
Aug 2025111263.933.01$402
Jul 2025115566.743.32$581
Jun 2025112766.483.13$464
May 2025112760.553.23$471
Apr 202518762.363.54$371
Mar 202514867.704.27$273
Feb 202516770.884.34$362
Jan 20250074.324.28$0
Dec 202407668.993.12$237
Nov 202408269.052.20$180
Oct 2024014671.372.28$333
Sep 202408769.612.36$206
Aug 2024014275.632.06$293
Jul 2024022779.932.15$487
Jun 2024024878.082.63$653
May 2024025878.812.20$567
Apr 2024026284.451.66$435
Mar 2024027280.301.55$420
Feb 2024026276.091.78$467
Jan 2024028973.023.30$953
Dec 2023028971.262.61$755
Nov 2023031677.892.81$887
Oct 2023033085.443.09$1,019
Sep 2023032889.042.74$897
Aug 2023033880.522.67$903
Jul 2023032574.852.64$859
Jun 2023026968.962.26$608
May 2023017370.622.23$385
Apr 2023012278.122.24$273
Mar 2023013172.852.39$314
Feb 2023012175.112.47$298
Jan 2023013476.533.39$454
Dec 2022014476.415.73$825
Nov 2022015685.005.65$881
Oct 2022016287.185.86$950
Sep 2022016784.888.16$1,363
Aug 2022018094.529.13$1,643
Jul 20220205101.587.54$1,546
Jun 20220155115.097.98$1,236
May 2022059109.378.43$498
Apr 2022066104.226.84$451
Mar 20220148108.885.08$751
Feb 2022012991.054.86$627
Jan 2022016781.844.54$758
Dec 2021018971.323.90$737
Nov 2021014577.435.24$759
Oct 202108879.795.71$503
Sep 2021013769.865.35$733
Aug 2021012166.024.22$511
Jul 2021010770.783.98$426
Jun 2021015169.493.38$510
May 2021023863.483.02$718
Apr 2021021960.362.76$604
Mar 2021025161.302.72$682
Feb 2021021057.805.55$1,165
Jan 2021021350.412.81$599
Dec 2020025844.642.68$690
Nov 2020028838.772.71$779
Oct 2020025436.972.48$630
Sep 2020022837.091.99$454
Aug 2020027139.982.39$646
Jul 2020023638.371.83$431
Jun 2020038834.901.69$656
May 2020021316.921.81$387
Apr 2020023614.751.80$426
Mar 2020020130.341.86$373
Feb 2020027049.881.98$535
Jan 2020021157.252.09$442
Dec 2019019859.012.30$456
Nov 2019034755.302.75$954
Oct 2019032753.472.42$791
Sep 2019033955.052.66$901
Aug 2019030453.112.30$701
Jul 2019029056.272.46$713
Jun 2019025052.782.49$623
May 2019022158.482.74$606
Apr 2019021462.632.75$589
Mar 2019021556.803.06$658
Feb 2019016750.852.79$466
Jan 2019021646.033.23$697
Dec 2018021346.594.19$892
Nov 2018020452.934.24$864
Oct 2018022561.443.40$765
Sep 2018021859.543.11$678
Aug 2018018659.403.07$570
Jul 2018021665.142.93$633
Jun 2018021760.183.08$668
May 2018024565.382.90$711
Apr 2018026163.842.90$757
Mar 2018026361.222.79$733
Feb 2018022761.782.77$628
Jan 2018015462.874.01$617
Dec 2017024157.272.92$704
Nov 2017024255.423.12$755
Oct 2017026749.292.98$797
Sep 2017023147.523.09$713
Aug 2017024845.373.00$745
Jul 2017028143.873.09$868
Jun 2017028342.493.09$874
May 2017030445.373.26$992
Apr 2017025647.933.21$822
Mar 2017030946.772.98$922
Feb 2017028650.452.95$844
Jan 2017031649.413.42$1,080
Dec 2016033348.763.72$1,240
Nov 2016035042.492.64$926
Oct 2016037846.193.09$1,168
Sep 2016035241.553.10$1,091
Aug 2016043641.442.92$1,275
Jul 2016037741.622.92$1,102
Jun 2016033745.352.69$905
May 2016035042.521.99$697
Apr 2016040036.561.99$796
Mar 2016025433.011.79$456
Feb 2016034926.472.06$720
Jan 2016037327.352.36$882
Dec 2015037632.362.00$753
Nov 2015036938.792.17$800
Oct 2015038743.552.43$939
Sep 2015043842.992.76$1,208
Aug 2015039840.162.87$1,143
Jul 2015043348.152.95$1,275
Jun 2015041856.152.88$1,205
May 2015037155.212.96$1,096
Apr 2015040749.822.71$1,102
Mar 2015040342.892.93$1,183
Feb 2015038144.662.98$1,134
Jan 2015048743.433.10$1,510
Dec 2014043254.693.59$1,551
Nov 2014044470.464.25$1,888
Oct 2014043978.303.90$1,713
Sep 2014053486.164.05$2,160
Aug 2014057389.394.04$2,312
Jul 2014056896.564.18$2,374
Jun 2014047598.164.74$2,250
May 2014051494.734.73$2,429
Apr 2014050195.944.81$2,409
Mar 2014049895.895.06$2,518
Feb 2014048697.406.19$3,009
Jan 2014053790.404.86$2,610
Dec 2013054991.824.35$2,391
Nov 2013051788.853.74$1,933
Oct 2013057597.423.78$2,173
Sep 20130584104.113.72$2,171
Aug 20130617104.253.52$2,173
Jul 20130643102.523.72$2,391
Jun 2013064894.403.93$2,549
May 2013047494.834.15$1,967
Apr 2013057393.964.28$2,454
Mar 2013050293.623.91$1,964
Feb 2013051091.233.42$1,744
Jan 2013061191.603.42$2,090
Dec 2012061486.773.42$2,100
Nov 2012060986.953.62$2,208
Oct 2012064389.383.40$2,186
Sep 2012063594.672.92$1,853
Aug 2012065892.662.91$1,914
Jul 2012072285.133.02$2,181
Jun 2012062879.822.52$1,582
May 2012042091.612.49$1,045
Apr 20120533101.652.00$1,064
Mar 20120590105.052.22$1,311
Feb 20120571101.102.57$1,468
Jan 2012058798.092.73$1,605
Dec 2011054496.873.24$1,762
Nov 2011062095.723.31$2,053
Oct 2011057384.983.65$2,091
Sep 2011073383.623.99$2,922
Aug 2011074483.404.15$3,087
Jul 2011080094.144.52$3,614
Jun 2011080492.904.64$3,730
May 2011085898.134.40$3,779
Apr 20110702105.964.33$3,042
Mar 2011085396.364.06$3,461
Feb 2011079985.644.18$3,340
Jan 2011089186.504.59$4,089
Dec 2010088785.734.35$3,856
Nov 2010086680.843.80$3,287
Oct 2010090678.103.51$3,179
Sep 2010088772.633.98$3,530
Aug 2010090073.684.42$3,977
Jul 2010093372.554.74$4,419
Jun 2010086870.364.91$4,262
May 2010098971.124.24$4,189
Apr 2010084281.694.12$3,471
Mar 2010098178.394.39$4,305
Feb 2010086673.585.44$4,713
Jan 2010095474.365.96$5,690
Dec 2009096671.445.48$5,297
Nov 2009093574.593.75$3,508
Oct 2009099372.544.11$4,081
Sep 200901,00265.543.06$3,071
Aug 200901,07467.423.22$3,457
Jul 200901,08661.133.46$3,762
Jun 200901,07066.163.90$4,168
May 200901,08654.743.93$4,263
Apr 200901,06746.773.59$3,828
Mar 200901,13042.144.06$4,587
Feb 200901,04632.814.63$4,846
Jan 200901,26235.865.37$6,778
Dec 200801,33937.105.98$8,003
Nov 200801,25355.496.86$8,596
Oct 200801,30675.246.92$9,040
Sep 20080995101.767.88$7,838
Aug 200801,365114.228.48$11,579
Jul 200801,402131.0811.39$15,968
Jun 200801,402131.3313.03$18,272
May 200801,513123.1711.57$17,512
Apr 200801,534110.3110.45$16,038
Mar 200801,708101.909.66$16,506
Feb 200801,61592.538.77$14,164
Jan 200801,97790.388.21$16,223
Dec 200701,50388.337.30$10,975
Nov 200701,56591.677.29$11,412
Oct 200701,82282.856.92$12,612
Sep 200701,96175.846.24$12,245
Aug 200702,23469.066.39$14,271
Jul 200701,72670.906.39$11,026
Jun 200701,44962.007.55$10,938
May 200701,27858.747.85$10,028
Apr 200701,43159.617.81$11,169
Mar 200701,67456.927.30$12,224
Feb 200701,58855.108.22$13,047
Jan 200701,84850.306.73$12,431
Dec 200602,03556.656.92$14,079
Nov 200601,97754.207.62$15,060
Oct 200601,55154.906.01$9,327
Sep 200601,69360.085.04$8,528
Aug 200601,91268.717.34$14,034
Jul 200602,29469.376.34$14,550
Jun 200602,55366.286.38$16,298
May 200602,95066.016.42$18,954
Apr 200603,07764.397.36$22,648
Mar 200603,59056.707.08$25,428
Feb 200603,75357.597.75$29,090
Jan 200605,35660.598.93$47,847
Dec 200507,58154.9413.42$101,702

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  102 Mcf  × $  3.05 =       $311

────────────────────────────────────────────────────
Month total                                     $311

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215747 is the state's own key, not one this site invented.