SHURLEY RR 1A

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215112District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$758 k
Oct 2005 – May 2026
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22173454
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition202 bbl$12,833
GasProduction125,235 Mcf$745,030
Total$757,863

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4229, -100.7423. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42290, -100.74234 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,500 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-4353759157,500 ftOct 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 20260143106.413.05$436
Apr 2026015498.932.87$442
Mar 2026015089.753.15$472
Feb 2026014163.503.75$529
Jan 2026015659.138.00$1,248
Dec 2025013156.664.41$578
Nov 2025015058.593.93$589
Oct 2025015159.383.30$499
Sep 2025014962.743.08$458
Aug 2025015463.933.01$464
Jul 2025015066.743.32$497
Jun 2025015066.483.13$469
May 2025016360.553.23$527
Apr 2025016362.363.54$578
Mar 2025015067.704.27$640
Feb 2025013370.884.34$577
Jan 2025014374.324.28$612
Dec 2024014568.993.12$453
Nov 2024014169.052.20$310
Oct 2024013871.372.28$315
Sep 2024014869.612.36$350
Aug 2024015975.632.06$328
Jul 2024015779.932.15$337
Jun 2024015878.082.63$416
May 2024015878.812.20$347
Apr 2024015484.451.66$256
Mar 2024015980.301.55$246
Feb 2024015576.091.78$276
Jan 2024116873.023.30$627
Dec 2023017471.262.61$454
Nov 2023016377.892.81$458
Oct 2023016485.443.09$506
Sep 2023016189.042.74$440
Aug 2023016080.522.67$428
Jul 2023016274.852.64$428
Jun 2023016968.962.26$382
May 2023015670.622.23$347
Apr 2023016678.122.24$371
Mar 2023016772.852.39$400
Feb 2023014475.112.47$355
Jan 2023016676.533.39$562
Dec 2022016376.415.73$934
Nov 2022016685.005.65$937
Oct 2022016587.185.86$968
Sep 2022016684.888.16$1,355
Aug 2022016994.529.13$1,542
Jul 20220174101.587.54$1,312
Jun 20220173115.097.98$1,380
May 20220181109.378.43$1,526
Apr 20220174104.226.84$1,190
Mar 20220177108.885.08$899
Feb 2022016091.054.86$777
Jan 2022017281.844.54$780
Dec 2021013371.323.90$519
Nov 2021015677.435.24$817
Oct 2021018179.795.71$1,034
Sep 2021025969.865.35$1,386
Aug 2021022866.024.22$962
Jul 2021015970.783.98$633
Jun 2021015669.493.38$527
May 2021012163.483.02$365
Apr 202108060.362.76$221
Mar 2021011861.302.72$321
Feb 202106157.805.55$338
Jan 202102450.412.81$67
Dec 2020010544.642.68$281
Nov 202006038.772.71$162
Oct 2020018036.972.48$446
Sep 2020017637.091.99$350
Aug 2020012839.982.39$305
Jul 2020014538.371.83$265
Jun 2020014134.901.69$238
May 2020099016.921.81$1,797
Apr 2020015814.751.80$285
Mar 2020016530.341.86$306
Feb 2020016049.881.98$317
Jan 2020018657.252.09$390
Dec 2019018759.012.30$431
Nov 2019018855.302.75$517
Oct 2019020753.472.42$501
Sep 2019023455.052.66$622
Aug 2019020953.112.30$482
Jul 2019021356.272.46$524
Jun 2019020152.782.49$501
May 2019021758.482.74$595
Apr 2019020762.632.75$569
Mar 2019021056.803.06$643
Feb 2019019450.852.79$542
Jan 2019021746.033.23$701
Dec 2018021546.594.19$900
Nov 2018020652.934.24$873
Oct 2018022061.443.40$748
Sep 2018021159.543.11$656
Aug 2018022059.403.07$675
Jul 2018022465.142.93$657
Jun 2018021660.183.08$665
May 2018022565.382.90$653
Apr 2018022563.842.90$653
Mar 2018023161.222.79$644
Feb 2018021561.782.77$595
Jan 2018123362.874.01$997
Dec 2017123657.272.92$747
Nov 2017022955.423.12$714
Oct 2017124349.292.98$774
Sep 2017124047.523.09$788
Aug 2017025145.373.00$754
Jul 2017125243.873.09$822
Jun 2017124942.493.09$811
May 2017125845.373.26$887
Apr 2017125047.933.21$851
Mar 2017126646.772.98$840
Feb 2017123850.452.95$753
Jan 2017026349.413.42$899
Dec 2016126148.763.72$1,020
Nov 2016126342.492.64$738
Oct 2016226546.193.09$911
Sep 2016126341.553.10$857
Aug 2016127941.442.92$857
Jul 2016127941.622.92$858
Jun 2016027745.352.69$744
May 2016128642.521.99$612
Apr 2016126136.561.99$556
Mar 2016128533.011.79$544
Feb 2016126926.472.06$582
Jan 2016229127.352.36$743
Dec 2015129032.362.00$613
Nov 2015225338.792.17$626
Oct 2015131043.552.43$796
Sep 2015129342.992.76$851
Aug 2015131640.162.87$948
Jul 2015130948.152.95$958
Jun 2015030956.152.88$891
May 2015034755.212.96$1,026
Apr 2015025249.822.71$682
Mar 2015022042.892.93$646
Feb 2015031544.662.98$938
Jan 2015040143.433.10$1,243
Dec 2014026254.693.59$941
Nov 2014030870.464.25$1,310
Oct 2014033578.303.90$1,307
Sep 2014033286.164.05$1,343
Aug 2014035389.394.04$1,424
Jul 2014036296.564.18$1,513
Jun 2014036798.164.74$1,738
May 2014045294.734.73$2,136
Apr 2014029795.944.81$1,428
Mar 2014013895.895.06$698
Feb 2014032797.406.19$2,025
Jan 2014038790.404.86$1,881
Dec 2013035491.824.35$1,541
Nov 2013035188.853.74$1,312
Oct 2013038697.423.78$1,459
Sep 20130377104.113.72$1,402
Aug 20130406104.253.52$1,430
Jul 20130411102.523.72$1,528
Jun 2013040294.403.93$1,581
May 2013041594.834.15$1,722
Apr 2013041093.964.28$1,756
Mar 2013043193.623.91$1,686
Feb 2013038791.233.42$1,324
Jan 2013042291.603.42$1,443
Dec 2012045586.773.42$1,556
Nov 2012038486.953.62$1,392
Oct 2012041489.383.40$1,407
Sep 2012043094.672.92$1,255
Aug 2012045192.662.91$1,312
Jul 2012046585.133.02$1,405
Jun 2012046079.822.52$1,159
May 2012049491.612.49$1,229
Apr 20120468101.652.00$935
Mar 20120467105.052.22$1,038
Feb 20120213101.102.57$547
Jan 2012045298.092.73$1,236
Dec 2011043596.873.24$1,409
Nov 2011048895.723.31$1,616
Oct 2011052584.983.65$1,915
Sep 2011050183.623.99$1,997
Aug 2011051483.404.15$2,133
Jul 2011049994.144.52$2,254
Jun 2011041792.904.64$1,935
May 2011050698.134.40$2,229
Apr 20110524105.964.33$2,271
Mar 2011055396.364.06$2,244
Feb 2011047785.644.18$1,994
Jan 2011056586.504.59$2,593
Dec 2010052085.734.35$2,261
Nov 2010048780.843.80$1,848
Oct 2010051778.103.51$1,814
Sep 2010056072.633.98$2,229
Aug 2010059573.684.42$2,630
Jul 2010061772.554.74$2,922
Jun 2010068670.364.91$3,369
May 2010067971.124.24$2,876
Apr 2010061481.694.12$2,531
Mar 2010065178.394.39$2,857
Feb 2010061273.585.44$3,331
Jan 2010067974.365.96$4,050
Dec 2009067271.445.48$3,685
Nov 2009067074.593.75$2,514
Oct 2009072872.544.11$2,992
Sep 2009071065.543.06$2,176
Aug 2009171767.423.22$2,375
Jul 2009175361.133.46$2,670
Jun 2009169166.163.90$2,758
May 2009173354.743.93$2,932
Apr 2009276646.773.59$2,842
Mar 2009486742.144.06$3,688
Feb 2009383732.814.63$3,976
Jan 2009293235.865.37$5,077
Dec 2008395537.105.98$5,819
Nov 2008394955.496.86$6,677
Oct 200831,00475.246.92$7,175
Sep 200831,011101.767.88$8,269
Aug 200811,094114.228.48$9,395
Jul 200821,072131.0811.39$12,472
Jun 200811,036131.3313.03$13,633
May 20083949123.1711.57$11,354
Apr 200841,070110.3110.45$11,628
Mar 200841,047101.909.66$10,526
Feb 200851,03592.538.77$9,540
Jan 200841,16690.388.21$9,929
Dec 2007498388.337.30$7,531
Nov 200751,01591.677.29$7,859
Oct 200721,12482.856.92$7,946
Sep 200721,14375.846.24$7,289
Aug 200721,12069.066.39$7,293
Jul 200741,23670.906.39$8,179
Jun 200721,17262.007.55$8,971
May 200741,19158.747.85$9,580
Apr 200751,29159.617.81$10,375
Mar 200751,50456.927.30$11,267
Feb 200741,46055.108.22$12,216
Jan 200751,57350.306.73$10,833
Dec 200661,46856.656.92$10,496
Nov 200651,50354.207.62$11,720
Oct 200651,68254.906.01$10,390
Sep 200641,66860.085.04$8,642
Aug 200621,62268.717.34$12,043
Jul 200641,93569.376.34$12,551
Jun 200621,95066.286.38$12,581
May 200652,15066.016.42$14,144
Apr 200642,22364.397.36$16,620
Mar 200682,43956.707.08$17,729
Feb 200662,46057.597.75$19,413
Jan 200663,00360.598.93$27,190
Dec 200563,56954.9413.42$48,209
Nov 2005105,03254.6910.59$53,828
Oct 200531,58258.3413.80$22,000

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  143 Mcf  × $  3.05 =       $436

────────────────────────────────────────────────────
Month total                                     $436

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215112 is the state's own key, not one this site invented.