SHURLEY RR 1A

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217528District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Nov 2005 – May 2026
Value, last 12 filed months
$831
at the published price for each month
Months reported
247
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-03-22168265
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition428 bbl$28,057
GasProduction215,878 Mcf$1,416,649
Total$1,444,705

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4201, -100.7455. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42012, -100.74552 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,500 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,500 ft.

Completions filed
Dec 2005
1 of 1 wells

1 well

42-4353741447,500 ftDec 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (247)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

247 months

May 2026019106.413.05$58
Apr 202602898.932.87$80
Mar 20260289.753.15$6
Feb 20260763.503.75$26
Jan 202601759.138.00$136
Dec 202501756.664.41$75
Nov 202501958.593.93$75
Oct 202502259.383.30$73
Sep 202502262.743.08$68
Aug 202502263.933.01$66
Jul 202502666.743.32$86
Jun 202502666.483.13$81
May 202503160.553.23$100
Apr 202503562.363.54$124
Mar 202504367.704.27$184
Feb 202504070.884.34$174
Jan 202504774.324.28$201
Dec 202404868.993.12$150
Nov 202405069.052.20$110
Oct 202405271.372.28$119
Sep 202405269.612.36$123
Aug 202405575.632.06$114
Jul 202405079.932.15$107
Jun 202404478.082.63$116
May 202405078.812.20$110
Apr 202404984.451.66$81
Mar 202405580.301.55$85
Feb 202405276.091.78$93
Jan 202405573.023.30$181
Dec 202305171.262.61$133
Nov 202304877.892.81$135
Oct 202304685.443.09$142
Sep 202304089.042.74$109
Aug 202303780.522.67$99
Jul 202303074.852.64$79
Jun 202303568.962.26$79
May 202303170.622.23$69
Apr 202303878.122.24$85
Mar 202303572.852.39$84
Feb 202303275.112.47$79
Jan 202303176.533.39$105
Dec 202203076.415.73$172
Nov 202202385.005.65$130
Oct 202202087.185.86$117
Sep 202201984.888.16$155
Aug 202201094.529.13$91
Jul 202202101.587.54$15
Jun 2022032115.097.98$255
May 2022045109.378.43$379
Apr 2022011104.226.84$75
Mar 2022013108.885.08$66
Feb 202201291.054.86$58
Jan 202201081.844.54$45
Dec 20210671.323.90$23
Nov 20210277.435.24$10
Oct 20210779.795.71$40
Sep 202101069.865.35$54
Aug 20210766.024.22$30
Jul 20210470.783.98$16
Jun 20210669.493.38$20
May 202101663.483.02$48
Apr 20210160.362.76$3
Mar 20210261.302.72$5
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200738.772.71$19
Oct 20200436.972.48$10
Sep 20200337.091.99$6
Aug 20200139.982.39$2
Jul 20200238.371.83$4
Jun 20200134.901.69$2
May 202001516.921.81$27
Apr 20200214.751.80$4
Mar 20200530.341.86$9
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190150.852.79$3
Jan 20190246.033.23$6
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180161.443.40$3
Sep 20180359.543.11$9
Aug 20180659.403.07$18
Jul 20180465.142.93$12
Jun 20180560.183.08$15
May 20180265.382.90$6
Apr 20180663.842.90$17
Mar 20180361.222.79$8
Feb 20180661.782.77$17
Jan 20180562.874.01$20
Dec 20170657.272.92$18
Nov 20170055.423.12$0
Oct 20170249.292.98$6
Sep 20170447.523.09$12
Aug 20170545.373.00$15
Jul 20170043.873.09$0
Jun 20170142.493.09$3
May 20170245.373.26$7
Apr 20170547.933.21$16
Mar 201715646.772.98$214
Feb 20171150.452.95$53
Jan 2017020549.413.42$701
Dec 2016228348.763.72$1,151
Nov 2016130342.492.64$844
Oct 2016232946.193.09$1,109
Sep 2016134741.553.10$1,117
Aug 2016139741.442.92$1,202
Jul 2016137941.622.92$1,150
Jun 2016038045.352.69$1,021
May 2016343842.521.99$1,000
Apr 2016141736.561.99$867
Mar 2016148133.011.79$896
Feb 2016247726.472.06$1,037
Jan 2016349927.352.36$1,262
Dec 2015148832.362.00$1,009
Nov 2015346038.792.17$1,113
Oct 2015144443.552.43$1,121
Sep 2015142942.992.76$1,226
Aug 2015144740.162.87$1,324
Jul 2015136448.152.95$1,120
Jun 2015035656.152.88$1,026
May 2015034055.212.96$1,005
Apr 2015037449.822.71$1,012
Mar 2015027542.892.93$807
Feb 2015041344.662.98$1,229
Jan 2015044543.433.10$1,380
Dec 2014033454.693.59$1,200
Nov 2014039270.464.25$1,667
Oct 2014048678.303.90$1,896
Sep 2014047586.164.05$1,922
Aug 2014049189.394.04$1,981
Jul 2014044096.564.18$1,839
Jun 2014029298.164.74$1,383
May 2014040794.734.73$1,924
Apr 2014048595.944.81$2,332
Mar 2014054395.895.06$2,746
Feb 2014028397.406.19$1,752
Jan 2014037990.404.86$1,842
Dec 2013033591.824.35$1,459
Nov 2013040388.853.74$1,507
Oct 2013041097.423.78$1,550
Sep 20130360104.113.72$1,338
Aug 20130419104.253.52$1,476
Jul 20130439102.523.72$1,632
Jun 2013053594.403.93$2,104
May 2013057994.834.15$2,402
Apr 2013056793.964.28$2,428
Mar 2013058693.623.91$2,293
Feb 2013054691.233.42$1,867
Jan 2013063391.603.42$2,165
Dec 2012063686.773.42$2,175
Nov 2012059086.953.62$2,139
Oct 2012064289.383.40$2,183
Sep 2012067594.672.92$1,970
Aug 2012068292.662.91$1,983
Jul 2012064185.133.02$1,936
Jun 2012065579.822.52$1,650
May 2012068091.612.49$1,692
Apr 20120672101.652.00$1,342
Mar 20120709105.052.22$1,575
Feb 20120676101.102.57$1,737
Jan 2012074298.092.73$2,029
Dec 2011076496.873.24$2,475
Nov 2011074295.723.31$2,457
Oct 2011076984.983.65$2,806
Sep 2011078683.623.99$3,133
Aug 2011082583.404.15$3,423
Jul 2011087294.144.52$3,939
Jun 2011083792.904.64$3,884
May 2011089298.134.40$3,929
Apr 20110903105.964.33$3,913
Mar 2011093596.364.06$3,794
Feb 2011081485.644.18$3,403
Jan 2011093186.504.59$4,272
Dec 2010094985.734.35$4,126
Nov 2010095980.843.80$3,640
Oct 201001,03278.103.51$3,621
Sep 201001,01772.633.98$4,047
Aug 201001,02373.684.42$4,521
Jul 201001,08672.554.74$5,144
Jun 201001,05270.364.91$5,166
May 201001,07371.124.24$4,544
Apr 201001,09481.694.12$4,510
Mar 201001,17178.394.39$5,139
Feb 201001,09973.585.44$5,981
Jan 201001,21674.365.96$7,252
Dec 200901,05871.445.48$5,802
Nov 200901,21974.593.75$4,573
Oct 200901,32572.544.11$5,446
Sep 200901,26165.543.06$3,865
Aug 200921,32367.423.22$4,393
Jul 200911,15961.133.46$4,076
Jun 200931,41166.163.90$5,694
May 200931,50954.743.93$6,088
Apr 200941,47546.773.59$5,479
Mar 200971,59742.144.06$6,777
Feb 200951,51932.814.63$7,202
Jan 200941,57235.865.37$8,587
Dec 200851,66537.105.98$10,137
Nov 200861,74055.496.86$12,270
Oct 200851,83575.246.92$13,078
Sep 200851,733101.767.88$14,160
Aug 200811,704114.228.48$14,569
Jul 200831,252131.0811.39$14,653
Jun 200811,447131.3313.03$18,990
May 200861,986123.1711.57$23,726
Apr 200882,160110.3110.45$23,465
Mar 2008112,452101.909.66$24,817
Feb 2008133,14892.538.77$28,813
Jan 2008113,01590.388.21$25,734
Dec 2007102,94788.337.30$22,402
Nov 2007142,55891.677.29$19,936
Oct 200763,39082.856.92$23,963
Sep 200763,29675.846.24$21,036
Aug 200762,65569.066.39$17,374
Jul 2007133,73870.906.39$24,800
Jun 200763,88362.007.55$29,683
May 2007123,89558.747.85$31,266
Apr 2007133,73759.617.81$29,943
Mar 2007134,23256.927.30$31,642
Feb 2007103,97155.108.22$33,177
Jan 2007144,56150.306.73$31,385
Dec 2006184,68356.656.92$33,419
Nov 2006144,84554.207.62$37,665
Oct 2006145,18254.906.01$31,932
Sep 2006114,88860.085.04$25,283
Aug 200665,00668.717.34$37,156
Jul 2006105,42869.376.34$35,122
Jun 200675,25766.286.38$34,024
May 2006145,79366.016.42$38,144
Apr 2006105,96964.397.36$44,579
Mar 2006216,62456.707.08$48,108
Feb 2006156,44657.597.75$50,828
Jan 2006187,91560.598.93$71,798
Dec 20051510,75754.9413.42$145,134
Nov 2005028054.6910.59$2,965

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   19 Mcf  × $  3.05 =        $58

────────────────────────────────────────────────────
Month total                                      $58

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/217528 is the state's own key, not one this site invented.