Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215419District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.2 M
Aug 2005 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
250
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-05-03165712
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition333 bbl$23,545
GasProduction189,651 Mcf$1,209,665
Total$1,233,210

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4222, -100.7333. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.42224, -100.73332 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Aug 2005
1 of 1 wells

1 well

42-4353752047,000 ftAug 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (250)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

250 months

May 20260172106.413.05$524
Apr 2026017698.932.87$505
Mar 2026018189.753.15$570
Feb 2026017563.503.75$656
Jan 2026018059.138.00$1,440
Dec 2025018556.664.41$816
Nov 2025018258.593.93$715
Oct 2025018159.383.30$598
Sep 2025017862.743.08$548
Aug 2025018163.933.01$546
Jul 2025017266.743.32$570
Jun 2025017466.483.13$544
May 2025018860.553.23$608
Apr 2025018462.363.54$652
Mar 2025018867.704.27$802
Feb 2025017170.884.34$742
Jan 2025019274.324.28$822
Dec 2024019468.993.12$606
Nov 2024018669.052.20$409
Oct 2024019371.372.28$440
Sep 2024019769.612.36$466
Aug 2024021075.632.06$433
Jul 2024021379.932.15$457
Jun 2024020578.082.63$540
May 2024021078.812.20$462
Apr 2024020784.451.66$343
Mar 2024021680.301.55$334
Feb 2024021376.091.78$380
Jan 2024122973.023.30$828
Dec 2023023071.262.61$600
Nov 2023021677.892.81$606
Oct 2023022285.443.09$685
Sep 2023021289.042.74$580
Aug 2023021280.522.67$567
Jul 2023021674.852.64$571
Jun 2023023468.962.26$528
May 2023018370.622.23$408
Apr 2023021978.122.24$490
Mar 2023023172.852.39$553
Feb 2023020575.112.47$505
Jan 2023022976.533.39$776
Dec 2022022876.415.73$1,306
Nov 2022022785.005.65$1,282
Oct 2022022687.185.86$1,325
Sep 2022022684.888.16$1,845
Aug 2022022094.529.13$2,008
Jul 20220226101.587.54$1,705
Jun 20220219115.097.98$1,747
May 20220239109.378.43$2,016
Apr 20220226104.226.84$1,545
Mar 20220225108.885.08$1,142
Feb 2022020691.054.86$1,001
Jan 2022022981.844.54$1,039
Dec 2021021171.323.90$823
Nov 2021020377.435.24$1,063
Oct 2021021779.795.71$1,240
Sep 2021032169.865.35$1,718
Aug 2021027166.024.22$1,144
Jul 2021015470.783.98$613
Jun 2021018069.493.38$609
May 2021022263.483.02$670
Apr 2021022660.362.76$623
Mar 2021024661.302.72$668
Feb 2021021257.805.55$1,176
Jan 2021023750.412.81$666
Dec 2020023744.642.68$634
Nov 2020022538.772.71$609
Oct 2020022936.972.48$568
Sep 2020022137.091.99$440
Aug 2020023339.982.39$556
Jul 2020024238.371.83$442
Jun 2020022834.901.69$385
May 202001,49016.921.81$2,704
Apr 2020022914.751.80$413
Mar 2020022730.341.86$421
Feb 2020024049.881.98$475
Jan 202002257.252.09$46
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 201907458.482.74$203
Apr 2019030062.632.75$825
Mar 2019028156.803.06$860
Feb 2019026050.852.79$726
Jan 2019031346.033.23$1,010
Dec 2018030546.594.19$1,277
Nov 2018028752.934.24$1,216
Oct 2018029761.443.40$1,009
Sep 2018026759.543.11$830
Aug 2018026459.403.07$810
Jul 2018040665.142.93$1,190
Jun 2018014560.183.08$446
May 2018032365.382.90$937
Apr 2018031763.842.90$920
Mar 2018024461.222.79$680
Feb 2018129561.782.77$878
Jan 2018135162.874.01$1,470
Dec 2017128457.272.92$887
Nov 2017033555.423.12$1,045
Oct 2017235949.292.98$1,170
Sep 2017135447.523.09$1,140
Aug 2017034345.373.00$1,031
Jul 2017135443.873.09$1,137
Jun 2017128842.493.09$932
May 2017136045.373.26$1,220
Apr 2017132747.933.21$1,098
Mar 2017320646.772.98$755
Feb 2017135550.452.95$1,099
Jan 2017037949.413.42$1,296
Dec 2016237848.763.72$1,505
Nov 2016137642.492.64$1,037
Oct 2016229846.193.09$1,013
Sep 2016125741.553.10$838
Aug 2016138041.442.92$1,153
Jul 2016137641.622.92$1,141
Jun 2016035445.352.69$951
May 2016233842.521.99$758
Apr 2016133436.561.99$702
Mar 2016138133.011.79$717
Feb 2016133026.472.06$707
Jan 2016231227.352.36$792
Dec 2015135832.362.00$749
Nov 2015220338.792.17$518
Oct 2015235043.552.43$936
Sep 2015126442.992.76$771
Aug 2015137440.162.87$1,114
Jul 2015136448.152.95$1,120
Jun 2015031956.152.88$920
May 2015032455.212.96$958
Apr 2015036549.822.71$988
Mar 2015042742.892.93$1,253
Feb 2015030344.662.98$902
Jan 2015027043.433.10$837
Dec 2014029454.693.59$1,056
Nov 2014025270.464.25$1,071
Oct 2014035878.303.90$1,397
Sep 2014038486.164.05$1,553
Aug 2014036589.394.04$1,473
Jul 2014036896.564.18$1,538
Jun 2014034998.164.74$1,653
May 2014040394.734.73$1,905
Apr 2014042295.944.81$2,029
Mar 2014044395.895.06$2,240
Feb 2014040897.406.19$2,526
Jan 2014048390.404.86$2,348
Dec 2013045891.824.35$1,994
Nov 2013042288.853.74$1,578
Oct 2013046497.423.78$1,754
Sep 20130454104.113.72$1,688
Aug 20130481104.253.52$1,694
Jul 20130491102.523.72$1,825
Jun 2013047894.403.93$1,880
May 2013049794.834.15$2,062
Apr 2013049293.964.28$2,107
Mar 2013051793.623.91$2,023
Feb 2013047591.233.42$1,624
Jan 2013053791.603.42$1,836
Dec 2012055186.773.42$1,885
Nov 2012053086.953.62$1,921
Oct 2012056389.383.40$1,914
Sep 2012053694.672.92$1,564
Aug 2012056092.662.91$1,629
Jul 2012056785.133.02$1,713
Jun 2012056179.822.52$1,413
May 2012057691.612.49$1,433
Apr 20120552101.652.00$1,102
Mar 20120573105.052.22$1,273
Feb 20120526101.102.57$1,352
Jan 2012057998.092.73$1,583
Dec 2011061696.873.24$1,996
Nov 2011059095.723.31$1,954
Oct 2011061984.983.65$2,258
Sep 2011061583.623.99$2,451
Aug 2011063683.404.15$2,639
Jul 2011065394.144.52$2,950
Jun 2011062292.904.64$2,886
May 2011056698.134.40$2,493
Apr 20110579105.964.33$2,509
Mar 2011067796.364.06$2,747
Feb 2011063285.644.18$2,642
Jan 2011070086.504.59$3,212
Dec 2010068985.734.35$2,996
Nov 2010068180.843.80$2,585
Oct 2010069078.103.51$2,421
Sep 2010066372.633.98$2,638
Aug 2010070073.684.42$3,094
Jul 2010072972.554.74$3,453
Jun 2010071770.364.91$3,521
May 2010078971.124.24$3,342
Apr 2010075981.694.12$3,129
Mar 2010080878.394.39$3,546
Feb 2010092973.585.44$5,056
Jan 2010090474.365.96$5,392
Dec 2009096871.445.48$5,308
Nov 2009097074.593.75$3,639
Oct 2009095072.544.11$3,905
Sep 2009086965.543.06$2,663
Aug 2009194767.423.22$3,115
Jul 2009197261.133.46$3,429
Jun 2009294166.163.90$3,798
May 200941,07454.743.93$4,435
Apr 200952,35946.773.59$8,697
Mar 200941,11142.144.06$4,678
Feb 2009394332.814.63$4,467
Jan 200921,01935.865.37$5,545
Dec 200831,05337.105.98$6,405
Nov 200831,04955.496.86$7,363
Oct 200831,11875.246.92$7,964
Sep 200831,171101.767.88$9,529
Aug 200811,190114.228.48$10,209
Jul 200831,245131.0811.39$14,573
Jun 200811,095131.3313.03$14,402
May 200841,106123.1711.57$13,294
Apr 200881,216110.3110.45$13,596
Mar 2008163,821101.909.66$38,557
Feb 2008204,47292.538.77$41,073
Jan 2008184,77990.388.21$40,842
Dec 2007174,70688.337.30$35,865
Nov 2007234,94891.677.29$38,188
Oct 200795,14682.856.92$36,366
Sep 200785,02675.846.24$31,990
Aug 200754,64669.066.39$30,024
Jul 200751,81470.906.39$11,942
Jun 200721,27162.007.55$9,718
May 200741,23558.747.85$9,925
Apr 200741,25359.617.81$10,018
Mar 200751,46356.927.30$10,967
Feb 200741,44255.108.22$12,068
Jan 200761,82650.306.73$12,585
Dec 200671,94756.656.92$13,867
Nov 200661,97754.207.62$15,385
Oct 200662,13754.906.01$13,181
Sep 200652,16260.085.04$11,191
Aug 200632,37368.717.34$17,624
Jul 200652,58069.376.34$16,711
Jun 200632,63966.286.38$17,046
May 200672,88666.016.42$19,005
Apr 200653,03164.397.36$22,632
Mar 2006103,01956.707.08$21,950
Feb 200672,89457.597.75$22,835
Jan 200673,51060.598.93$31,780
Dec 200573,75354.9413.42$50,733
Nov 2005104,15954.6910.59$44,584
Oct 200584,93058.3413.80$68,480
Sep 200525,71361.4512.08$69,130
Aug 200501,12561.519.80$11,021

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  172 Mcf  × $  3.05 =       $524

────────────────────────────────────────────────────
Month total                                     $524

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/215419 is the state's own key, not one this site invented.