SHURLEY RR 6

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 236669District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$491 k
Aug 2007 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
226
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-02181041
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition69 bbl$3,726
GasProduction95,557 Mcf$487,705
Total$491,431

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.4181, -100.7367. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.41814, -100.73672 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,265 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,265 ft.

Completions filed
Aug 2007
1 of 1 wells

1 well

42-4353852077,265 ftAug 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (226)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

226 months

May 20260100106.413.05$305
Apr 2026010198.932.87$290
Mar 202608989.753.15$280
Feb 2026010563.503.75$394
Jan 2026012559.138.00$1,000
Dec 2025016556.664.41$728
Nov 2025011658.593.93$455
Oct 202501359.383.30$43
Sep 2025012062.743.08$369
Aug 2025011163.933.01$335
Jul 2025011366.743.32$375
Jun 2025011366.483.13$354
May 2025012760.553.23$411
Apr 2025013062.363.54$461
Mar 2025013967.704.27$593
Feb 2025013570.884.34$586
Jan 2025016074.324.28$685
Dec 2024015468.993.12$481
Nov 2024015269.052.20$334
Oct 2024018771.372.28$427
Sep 2024016969.612.36$400
Aug 202404775.632.06$97
Jul 2024012879.932.15$275
Jun 2024014178.082.63$371
May 2024017078.812.20$374
Apr 2024016984.451.66$280
Mar 2024018580.301.55$286
Feb 2024016676.091.78$296
Jan 2024018173.023.30$597
Dec 2023017871.262.61$465
Nov 2023017177.892.81$480
Oct 2023017285.443.09$531
Sep 2023016689.042.74$454
Aug 2023016080.522.67$428
Jul 2023016074.852.64$423
Jun 2023019968.962.26$449
May 2023018570.622.23$412
Apr 2023018378.122.24$410
Mar 202301072.852.39$24
Feb 202309275.112.47$227
Jan 2023020176.533.39$681
Dec 202203076.415.73$172
Nov 2022012785.005.65$717
Oct 2022014387.185.86$839
Sep 2022012884.888.16$1,045
Aug 2022012294.529.13$1,114
Jul 20220139101.587.54$1,048
Jun 20220148115.097.98$1,181
May 20220164109.378.43$1,383
Apr 20220155104.226.84$1,060
Mar 20220167108.885.08$848
Feb 2022015391.054.86$743
Jan 2022015781.844.54$712
Dec 2021013871.323.90$538
Nov 2021012677.435.24$660
Oct 2021015479.795.71$880
Sep 2021022069.865.35$1,177
Aug 2021018266.024.22$768
Jul 2021015470.783.98$613
Jun 2021017769.493.38$598
May 2021016063.483.02$483
Apr 2021015860.362.76$436
Mar 2021017261.302.72$467
Feb 2021021757.805.55$1,204
Jan 2021012650.412.81$354
Dec 2020014144.642.68$377
Nov 2020014138.772.71$382
Oct 202002736.972.48$67
Sep 202001137.091.99$22
Aug 202003339.982.39$79
Jul 202004238.371.83$77
Jun 202001334.901.69$22
May 2020011216.921.81$203
Apr 202003914.751.80$70
Mar 202005230.341.86$97
Feb 202001349.881.98$26
Jan 202001657.252.09$34
Dec 201906359.012.30$145
Nov 201902155.302.75$58
Oct 201901053.472.42$24
Sep 2019024455.052.66$648
Aug 2019012753.112.30$293
Jul 2019035056.272.46$861
Jun 201907252.782.49$179
May 201908658.482.74$236
Apr 201907462.632.75$204
Mar 2019045256.803.06$1,384
Feb 2019022450.852.79$625
Jan 201905546.033.23$178
Dec 201805746.594.19$239
Nov 2018011552.934.24$487
Oct 201806661.443.40$224
Sep 2018020459.543.11$634
Aug 2018038259.403.07$1,171
Jul 2018021565.142.93$630
Jun 2018023060.183.08$708
May 201808765.382.90$252
Apr 2018022063.842.90$638
Mar 201804761.222.79$131
Feb 2018017961.782.77$495
Jan 201813062.874.01$183
Dec 2017121457.272.92$682
Nov 2017013055.423.12$405
Oct 2017120749.292.98$667
Sep 2017117547.523.09$588
Aug 2017021545.373.00$646
Jul 2017122143.873.09$726
Jun 2017122842.493.09$746
May 2017122345.373.26$773
Apr 2017123547.933.21$803
Mar 2017126646.772.98$840
Feb 2017123250.452.95$735
Jan 2017025349.413.42$865
Dec 2016125848.763.72$1,009
Nov 2016124842.492.64$698
Oct 2016127546.193.09$896
Sep 2016127041.553.10$879
Aug 2016126841.442.92$825
Jul 2016129141.622.92$893
Jun 2016030845.352.69$827
May 201619442.521.99$230
Apr 2016118136.561.99$397
Mar 2016122333.011.79$433
Feb 2016121926.472.06$478
Jan 2016123827.352.36$590
Dec 2015122232.362.00$477
Nov 2015122538.792.17$526
Oct 2015132043.552.43$820
Sep 2015127242.992.76$793
Aug 2015131440.162.87$942
Jul 2015133348.152.95$1,029
Jun 2015020056.152.88$577
May 2015026655.212.96$786
Apr 2015027949.822.71$755
Mar 2015025542.892.93$748
Feb 2015026244.662.98$780
Jan 2015031343.433.10$971
Dec 2014076954.693.59$2,762
Nov 2014055270.464.25$2,347
Oct 2014027878.303.90$1,084
Sep 2014027086.164.05$1,092
Aug 2014028889.394.04$1,162
Jul 2014029396.564.18$1,225
Jun 2014028898.164.74$1,364
May 2014030694.734.73$1,446
Apr 2014030495.944.81$1,462
Mar 2014031595.895.06$1,593
Feb 2014028997.406.19$1,789
Jan 2014032590.404.86$1,580
Dec 2013033191.824.35$1,441
Nov 2013030888.853.74$1,151
Oct 2013032897.423.78$1,240
Sep 20130322104.113.72$1,197
Aug 20130345104.253.52$1,215
Jul 20130359102.523.72$1,335
Jun 2013037794.403.93$1,483
May 2013039994.834.15$1,655
Apr 2013040993.964.28$1,752
Mar 2013044093.623.91$1,722
Feb 2013036691.233.42$1,252
Jan 2013040691.603.42$1,388
Dec 2012041086.773.42$1,402
Nov 2012043386.953.62$1,570
Oct 2012042689.383.40$1,448
Sep 2012047694.672.92$1,389
Aug 2012044592.662.91$1,294
Jul 2012049585.133.02$1,495
Jun 2012045179.822.52$1,136
May 2012050891.612.49$1,264
Apr 20120495101.652.00$988
Mar 20120540105.052.22$1,200
Feb 20120212101.102.57$545
Jan 2012051098.092.73$1,394
Dec 2011051896.873.24$1,678
Nov 2011052795.723.31$1,745
Oct 2011055484.983.65$2,021
Sep 2011054683.623.99$2,176
Aug 2011057583.404.15$2,386
Jul 2011057994.144.52$2,615
Jun 2011052392.904.64$2,427
May 2011057398.134.40$2,524
Apr 20110631105.964.33$2,734
Mar 2011064896.364.06$2,629
Feb 2011054985.644.18$2,295
Jan 2011058086.504.59$2,661
Dec 2010060585.734.35$2,630
Nov 2010060280.843.80$2,285
Oct 2010063278.103.51$2,218
Sep 2010065572.633.98$2,607
Aug 2010070273.684.42$3,102
Jul 2010074972.554.74$3,548
Jun 2010074970.364.91$3,678
May 2010078971.124.24$3,342
Apr 2010079881.694.12$3,290
Mar 2010083678.394.39$3,669
Feb 2010075673.585.44$4,114
Jan 2010087774.365.96$5,231
Dec 2009087071.445.48$4,771
Nov 2009088674.593.75$3,324
Oct 2009094472.544.11$3,880
Sep 2009091365.543.06$2,798
Aug 2009174367.423.22$2,459
Jul 2009183261.133.46$2,944
Jun 2009293566.163.90$3,774
May 200921,04054.743.93$4,192
Apr 200931,00846.773.59$3,757
Mar 200951,18242.144.06$5,008
Feb 200941,19732.814.63$5,677
Jan 200931,33435.865.37$7,272
Dec 200841,30937.105.98$7,972
Nov 200851,34255.496.86$9,484
Oct 200831,54575.246.92$10,920
Sep 20082741101.767.88$6,040
Aug 20081668114.228.48$5,781
Jul 20080731131.0811.39$8,326
Jun 20080542131.3313.03$7,064
May 200801,347123.1711.57$15,591
Apr 200821,609110.3110.45$17,042
Mar 200841,826101.909.66$18,054
Feb 200802,01192.538.77$17,638
Jan 200802,38590.388.21$19,571
Dec 200702,73888.337.30$19,993
Nov 200702,10391.677.29$15,334
Oct 200702,98282.856.92$20,641
Sep 200703,73575.846.24$23,322
Aug 200704,15069.066.39$26,510

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  100 Mcf  × $  3.05 =       $305

────────────────────────────────────────────────────
Month total                                     $305

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/236669 is the state's own key, not one this site invented.