CANYON RANCH 126

Operated by UPP OPERATING, LLC (P-5 875310) in the SAWYER (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218489District 7CField 812673332 tax incentive programmesCondensateGasSaveExport
Value, all time
$820 k
Feb 2006 – May 2026
Value, last 12 filed months
$928
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6,629 leases and 6,629 wells, and the rule below applies to all of them.

Discovered
1967-07-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,000 ft
minimum
From a lease line
500 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2003-06-24.

The Commission's schedule remark for this field reads: FIELD PER ORDER 7C-0234582 6/2403

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-18168309
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$230
GasProduction148,541 Mcf$819,821
Total$820,050

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.3121, -100.4573. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.31214, -100.45729 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,401 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,401 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-4353702810 S6,401 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 2026021106.413.05$64
Apr 202601998.932.87$55
Mar 202602189.753.15$66
Feb 202601563.503.75$56
Jan 202602659.138.00$208
Dec 202502156.664.41$93
Nov 202502058.593.93$79
Oct 202502159.383.30$69
Sep 202502462.743.08$74
Aug 202501163.933.01$33
Jul 202501566.743.32$50
Jun 202502666.483.13$81
May 202501360.553.23$42
Apr 202501962.363.54$67
Mar 202502267.704.27$94
Feb 202502070.884.34$87
Jan 202501974.324.28$81
Dec 202401968.993.12$59
Nov 202403569.052.20$77
Oct 20240771.372.28$16
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 202402778.082.63$71
May 202401378.812.20$29
Apr 20240084.451.66$0
Mar 202402280.301.55$34
Feb 202401576.091.78$27
Jan 202405173.023.30$168
Dec 202301771.262.61$44
Nov 202301777.892.81$48
Oct 202302185.443.09$65
Sep 202303089.042.74$82
Aug 202303580.522.67$94
Jul 202303074.852.64$79
Jun 202322668.962.26$197
May 202303670.622.23$80
Apr 202303378.122.24$74
Mar 202302972.852.39$69
Feb 202302675.112.47$64
Jan 202303276.533.39$108
Dec 202203776.415.73$212
Nov 202203185.005.65$175
Oct 202202987.185.86$170
Sep 202203084.888.16$245
Aug 202203994.529.13$356
Jul 2022031101.587.54$234
Jun 2022051115.097.98$407
May 2022025109.378.43$211
Apr 2022030104.226.84$205
Mar 2022037108.885.08$188
Feb 202203291.054.86$155
Jan 202203781.844.54$168
Dec 202104571.323.90$175
Nov 202102177.435.24$110
Oct 202103779.795.71$211
Sep 202104069.865.35$214
Aug 202104166.024.22$173
Jul 202103770.783.98$147
Jun 202104169.493.38$139
May 202104063.483.02$121
Apr 202104060.362.76$110
Mar 202104261.302.72$114
Feb 202101757.805.55$94
Jan 202103750.412.81$104
Dec 202003044.642.68$80
Nov 202002738.772.71$73
Oct 202002536.972.48$62
Sep 202003137.091.99$62
Aug 202003239.982.39$76
Jul 202004538.371.83$82
Jun 202004434.901.69$74
May 202004416.921.81$80
Apr 202004614.751.80$83
Mar 202005630.341.86$104
Feb 202004449.881.98$87
Jan 202005157.252.09$107
Dec 201904959.012.30$113
Nov 201903955.302.75$107
Oct 201905053.472.42$121
Sep 201906555.052.66$173
Aug 201905453.112.30$124
Jul 201904656.272.46$113
Jun 201905652.782.49$140
May 201906658.482.74$181
Apr 201907462.632.75$204
Mar 201906356.803.06$193
Feb 201905750.852.79$159
Jan 201906346.033.23$203
Dec 201806346.594.19$264
Nov 201809752.934.24$411
Oct 2018046461.443.40$1,577
Sep 2018037759.543.11$1,172
Aug 2018017959.403.07$549
Jul 2018012865.142.93$375
Jun 2018030560.183.08$938
May 2018039365.382.90$1,140
Apr 2018042263.842.90$1,224
Mar 2018040861.222.79$1,137
Feb 2018039761.782.77$1,098
Jan 2018023362.874.01$934
Dec 2017043257.272.92$1,262
Nov 2017040955.423.12$1,275
Oct 2017050849.292.98$1,516
Sep 2017046247.523.09$1,426
Aug 2017049645.373.00$1,490
Jul 2017049643.873.09$1,531
Jun 2017042842.493.09$1,321
May 2017053645.373.26$1,749
Apr 2017046247.933.21$1,484
Mar 2017056246.772.98$1,677
Feb 2017049750.452.95$1,467
Jan 2017056349.413.42$1,925
Dec 2016055648.763.72$2,070
Nov 2016063642.492.64$1,682
Oct 2016076346.193.09$2,358
Sep 2016058341.553.10$1,808
Aug 2016059441.442.92$1,737
Jul 2016051641.622.92$1,509
Jun 2016058145.352.69$1,560
May 2016063942.521.99$1,272
Apr 2016062436.561.99$1,242
Mar 2016062233.011.79$1,116
Feb 2016066926.472.06$1,381
Jan 2016064727.352.36$1,530
Dec 2015060432.362.00$1,209
Nov 2015064438.792.17$1,396
Oct 2015066643.552.43$1,616
Sep 2015057842.992.76$1,594
Aug 2015066540.162.87$1,910
Jul 2015060548.152.95$1,782
Jun 2015058356.152.88$1,681
May 2015060455.212.96$1,785
Apr 2015057349.822.71$1,551
Mar 2015060042.892.93$1,761
Feb 2015059344.662.98$1,765
Jan 2015063543.433.10$1,969
Dec 2014071454.693.59$2,564
Nov 2014067970.464.25$2,887
Oct 2014067778.303.90$2,641
Sep 2014067886.164.05$2,743
Aug 2014065889.394.04$2,655
Jul 2014069796.564.18$2,913
Jun 2014073298.164.74$3,467
May 2014076694.734.73$3,621
Apr 2014076895.944.81$3,693
Mar 2014079895.895.06$4,035
Feb 2014072597.406.19$4,489
Jan 2014070290.404.86$3,412
Dec 2013073791.824.35$3,209
Nov 2013074488.853.74$2,781
Oct 2013079697.423.78$3,008
Sep 20130752104.113.72$2,796
Aug 20130629104.253.52$2,216
Jul 20130831102.523.72$3,089
Jun 2013081394.403.93$3,198
May 2013083794.834.15$3,473
Apr 2013083393.964.28$3,567
Mar 2013080593.623.91$3,150
Feb 2013070891.233.42$2,421
Jan 2013193791.603.42$3,296
Dec 2012057286.773.42$1,956
Nov 2012061186.953.62$2,215
Oct 2012062889.383.40$2,135
Sep 2012059094.672.92$1,722
Aug 2012061192.662.91$1,777
Jul 2012090485.133.02$2,731
Jun 2012089279.822.52$2,247
May 2012095691.612.49$2,379
Apr 20120780101.652.00$1,558
Mar 20120973105.052.22$2,162
Feb 20120951101.102.57$2,444
Jan 201201,05198.092.73$2,874
Dec 2011038196.873.24$1,234
Nov 2011068195.723.31$2,255
Oct 2011069384.983.65$2,528
Sep 2011052783.623.99$2,101
Aug 201101,05883.404.15$4,390
Jul 2011059194.144.52$2,670
Jun 2011016692.904.64$770
May 2011013698.134.40$599
Apr 20110143105.964.33$620
Mar 2011011096.364.06$446
Feb 2011026185.644.18$1,091
Jan 2011059186.504.59$2,712
Dec 2010061385.734.35$2,665
Nov 2010060080.843.80$2,277
Oct 2010058178.103.51$2,039
Sep 2010035272.633.98$1,401
Aug 2010015073.684.42$663
Jul 2010051472.554.74$2,435
Jun 2010056670.364.91$2,779
May 2010055671.124.24$2,355
Apr 2010046281.694.12$1,905
Mar 2010062178.394.39$2,725
Feb 2010036973.585.44$2,008
Jan 2010056974.365.96$3,394
Dec 2009064671.445.48$3,543
Nov 2009065874.593.75$2,468
Oct 2009051272.544.11$2,104
Sep 2009049065.543.06$1,502
Aug 2009048367.423.22$1,555
Jul 2009055461.133.46$1,919
Jun 2009051766.163.90$2,014
May 2009058454.743.93$2,293
Apr 2009048946.773.59$1,754
Mar 2009056242.144.06$2,281
Feb 2009056732.814.63$2,627
Jan 2009074435.865.37$3,996
Dec 2008076737.105.98$4,584
Nov 2008069455.496.86$4,761
Oct 2008084875.246.92$5,870
Sep 20080787101.767.88$6,199
Aug 200801,110114.228.48$9,416
Jul 200801,225131.0811.39$13,952
Jun 200801,261131.3313.03$16,434
May 200801,355123.1711.57$15,683
Apr 200801,349110.3110.45$14,104
Mar 200801,419101.909.66$13,713
Feb 200801,34492.538.77$11,788
Jan 200801,44090.388.21$11,816
Dec 200701,21588.337.30$8,872
Nov 200701,35691.677.29$9,888
Oct 200701,05582.856.92$7,303
Sep 2007096675.846.24$6,032
Aug 2007098769.066.39$6,305
Jul 200701,28570.906.39$8,209
Jun 200701,40962.007.55$10,636
May 200701,52158.747.85$11,934
Apr 200701,84559.617.81$14,401
Mar 200701,89256.927.30$13,815
Feb 200702,18355.108.22$17,936
Jan 200702,60350.306.73$17,510
Dec 200602,72856.656.92$18,874
Nov 200602,89154.207.62$22,022
Oct 200602,99854.906.01$18,029
Sep 200602,90660.085.04$14,638
Aug 200602,89568.717.34$21,249
Jul 200603,26469.376.34$20,703
Jun 200603,36166.286.38$21,456
May 200604,11466.016.42$26,432
Apr 200605,17864.397.36$38,113
Mar 200607,08356.707.08$50,168
Feb 200606,62057.597.75$51,312

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   21 Mcf  × $  3.05 =        $64

────────────────────────────────────────────────────
Month total                                      $64

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7C/G/218489 is the state's own key, not one this site invented.